READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 2023-15 Accepting Homeland Security Port Security Grant-Boat Lift & Equip — reading text
Part 4 of 5. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-41305-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
reviewed by the Made in America Office.
There may be instances where an award qualifies, in whole or in part, for an existing waiver described at" Buy America"
Preference in FEMA Financial Assistance Programs for Infrastructure I FEMA.gov.
The awarding Component may provide specific instructions to Recipients of awards from infrastructure programs that are
subject to the Build America, Buy America provisions. Recipients should refer to the Notice of Funding Opportunity for further
information on the Buy America preference and waiver process.
Article XXXVIII - SAFECOM
Recipients receiving federal financial assistance awards made under programs that provide emergency communication
equipment and its related activities must comply with the SAFECOM Guidance for Emergency Communication Grants,
including provisions on technical standards that ensure and enhance interoperable communications.
Article XXXIX - Terrorist Financing
Recipients must comply with E. O. 13224 and U. S. laws that prohibit transactions with, and the provisions of resources and
support to, individuals and organizations associated with terrorism. Recipients are legally responsible to ensure compliance
with the Order and laws.
Article XL - Trafficking Victims Protection Act of 2000 (TVPA)
Trafficking in Persons:
Recipients must comply with the requirements of the government-wide financial assistance award term which implements
Section 106 ( g) of the Trafficking Victims Protection Act of 2000 ( TVPA), codified as amended at 22 U. S. C. section 7104. The
award term is located at 2 C. F. R. section 175. 15, the full text of which is incorporated here by reference.
Article XLI - Universal Identifier and System of Award Management
Requirements for System for Award Management and Unique Entity Identifier Recipients are required to comply with the
requirements set forth in the government-wide financial assistance award term regarding the System for Award Management
and Universal Identifier Requirements located at 2 C. F. R. Part 25, Appendix A, the full text of which is incorporated here by
reference.
Article XLII - USA PATRIOT Act of 2001
Recipients must comply with requirements of Section 817 of the Uniting and Strengthening America by Providing Appropriate
Tools Required to Intercept and Obstruct Terrorism Act of 2001 ( USA PATRIOT Act), which amends 18 U. S. C. sections
175- 175c.
Article XLIII - Use of DHS Seal, Logo and Flags
Recipients must obtain permission from their DHS FAO prior to using the DHS seal( s), logos, crests or reproductions of flags
or likenesses of DHS agency officials, including use of the United States Coast Guard seal, logo, crests or reproductions of
flags or likenesses of Coast Guard officials.
Article XLIV- Whistleblower Protection Act
Recipients must comply with the statutory requirements for whistleblower protections (if applicable) at 10 U. S. 0 section 2409,
41 U. S. C. section 4712, and 10 U. S. C. section 2324, 41 U. S. C. sections 4304 and 4310.
Article XLV- Environmental Planning and Historic Preservation ( EHP) Review
DHS/ FEMA funded activities that may require an Environmental Planning and Historic Preservation ( EHP) review are subject
to the FEMA EHP review process. This review does not address all federal, state, and local requirements. Acceptance of
federal funding requires the recipient to comply with all federal, state and local laws.
DHS/ FEMA is required to consider the potential impacts to natural and cultural resources of all projects funded by DHS/
FEMA grant funds, through its EHP review process, as mandated by: the National Environmental Policy Act; National Historic
Preservation Act of 1966, as amended; National Flood Insurance Program regulations; and any other applicable laws and
executive orders. General guidance for FEMA's EHP process is available on the DHS/ FEMA Website. Specific applicant
guidance on how to submit information for EHP review depends on the individual grant program and applicants should contact
their grant Program Officer to be put into contact with EHP staff responsible for assisting their specific grant program. The
EHP review process must be completed before funds are released to carry out the proposed project; otherwise, DHS/ FEMA
may not be able to fund the project due to noncompliance with EHP laws, executive orders, regulations, and policies.
If ground disturbing activities occur during construction, applicant will monitor ground disturbance, and if any potential
archaeological resources are discovered the applicant will immediately cease work in that area and notify the pass-through
entity, if applicable, and DHS/ FEMA.
Article XLVI - Applicability of DHS Standard Terms and Conditions to Tribes
The DHS Standard Terms and Conditions are a restatement of general requirements imposed upon recipients and flow down
to sub- recipients as a matter of law, regulation, or executive order. If the requirement does not apply to Indian tribes or there
is a federal law or regulation exempting its application to Indian tribes, then the acceptance by Tribes of, or acquiescence
to, DHS Standard Terms and Conditions does not change or alter its inapplicability to an Indian tribe. The execution of grant
documents is not intended to change, alter, amend, or impose additional liability or responsibility upon the Tribe where it does
not already exist.
Article XLVII - Acceptance of Post Award Changes
In the event FEMA determines that changes are necessary to the award document after an award has been made, including
changes to period of performance or terms and conditions, recipients will be notified of the changes in writing. Once
notification has been made, any subsequent request for funds will indicate recipient acceptance of the changes to the
award. Please call the FEMA/ GMD Call Center at( 866) 927- 5646 or via e- mail to: ASK- GMD@fema.dhs. gov if you have any
questions.
Article XLVIII - Disposition of Equipment Acquired Under the Federal Award
For purposes of original or replacement equipment acquired under this award by a non- state recipient or non- state sub-
recipients, when that equipment is no longer needed for the original project or program or for other activities currently or
previously supported by a federal awarding agency, you must request instructions from FEMA to make proper disposition
of the equipment pursuant to 2 C. F. R. section 200. 313. State recipients and state sub- recipients must follow the disposition
requirements in accordance with state laws and procedures.
Article XLIX - Prior Approval for Modification of Approved Budget
Before making any change to the FEMA approved budget for this award, you must request prior written approval from FEMA
where required by 2 C. F. R. section 200. 308.
For purposes of non- construction projects, FEMA is utilizing its discretion to impose an additional restriction under 2 C. F. R.
section 200. 308( f) regarding the transfer of funds among direct cost categories, programs, functions, or activities. Therefore,
for awards with an approved budget where the federal share is greater than the simplified acquisition threshold ( currently
250, 000), you may not transfer funds among direct cost categories, programs, functions, or activities without prior written
approval from FEMA where the cumulative amount of such transfers exceeds or is expected to exceed ten percent ( 10%) of
the total budget FEMA last approved.
For purposes of awards that support both construction and non- construction work, FEMA is utilizing its discretion under 2
C. F. R. section 200. 308( h)( 5) to require the recipient to obtain prior written approval from FEMA before making any fund or
budget transfers between the two types of work.
You must report any deviations from your FEMA approved budget in the first Federal Financial Report( SF-425) you submit
following any budget deviation, regardless of whether the budget deviation requires prior written approval.
Article L - Indirect Cost Rate
2 C. F. R. section 200. 211( b)( 15) requires the terms of the award to include the indirect cost rate for the federal award. If
applicable, the indirect cost rate for this award is stated in the budget documents or other materials approved by FEMA and
included in the award file.
Article LI - Funding Hold: Environmental Planning and Historic Preservation ( EHP) Compliance
BUDGET COST CATEGORIES
Personnel 0. 00
Fringe Benefits 0. 00
Travel 0. 00
Equipment 15, 960.00
Supplies 0. 00
Contractual 61, 268. 00
Construction 0. 00
Indirect Charges 0. 00
Other 0. 00
Obligating Document for Award/Amendment
la. AGREEMENT NO. 2. AMENDMENT NO. 3. 4. TYPE OF ACTION 5. CONTROL NO.
EMW-2023- PU- 00188- S01 *** RECIPIENT AWARD WX05654N2023T
NO.
596000323
6. RECIPIENT NAME AND 7. ISSUING FEMA OFFICE AND 8. PAYMENT OFFICE AND ADDRESS
ADDRESS ADDRESS FEMA Finance Center
Fort Walton Beach, City of FEMA-GPD 430 Market Street
107 Miracle Strip Parkway 400 C Street, SW, 3rd floor Winchester, VA 22603
SW Washington, DC 20472- 3645
Fort Walton Beach, FL, POC: 866- 927- 5646
32548- 6614
9. NAME OF RECIPIENT PHONE NO. 10. NAME OF FEMA PROJECT COORDINATOR
PROJECT OFFICER 8508339627 Central Scheduling and Information Desk
Jeremy Morgan Phone: 800- 368- 6498
Email: Askcsid@dhs. gov
11. EFFECTIVE DATE OF 12. 13. ASSISTANCE ARRANGEMENT 14. PERFORMANCE PERIOD
THIS ACTION METHOD Cost Reimbursement
From: To:
08/ 25/ 2023 OF
09/ 0 1/ 2023 08/ 31/ 2026
PAYMENT
Budget Period
PARS
09/ 01/ 2023 08/ 31/ 2026
1 5. DESCRIPTION OF ACTION
a.( Indicate funding
