READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 01-09-2007 workshop agenda — reading text
Part 20 of 20. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-13385-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
APPEALS. A new section entitled Alarm Appeals, is hereby
adopted as follows:
Alarm Appeals .
Police Department
The city shall appoint a Hearing Master to hear all appeals of imposed fmes and the
this
hearing officer shall be the final authority in any grievance of all assessed fines pertaining to
ordinance.
Fire Department
All appeals of osed fmes shall be presented to the Code Enforcement Board and shall
im{)
be the final authority in any grievance of all assessed fines pertaining to this ordinance.
SECTION 9. PENALTY FOR VIOLATIONS. A new section entitled " Penalty for
Violations" is hereby adopted as follows:
Penalty For Violations
Violations of this chapter shall be punishable as provided in Section 1- 8. Code of Ordinances.
SECTION 10. SEVERABILITY.
The sections, paragraphs, sentences, clauses and phrases of this Ordinance are severable. In
or section of this ordinance shall be declared invalid,
any phrase, clause, sentence, paragraph
unconstitutional or unenforceable by the valid judgment or decree of the court of competent
jurisdiction, such invalidity, unconstitutionality or unenforceability shall not affect any of the
remaining phrases, clauses, sentences, paragraphs and sections of this ordinance.
SECTION 11. CONFLICTING PROVISIONS
Toni L. Craig Page 11 1118/ 2005
In the event any ordinance or parts of ordinances are in conflict with any other provision
of the Code, the provisions of this Ordinance shall prevail.
SECTION 12. EFFECTIVE DATE.
This ordinance shall take effect immediately upon approval by council and signature of the
Mayor.
PASSED AND ADOPTED BY TIW CITY COUNCIL OF ~ CITY OF FORT
WALTONBEACH, FLORlDAONTHE~ DAYOF / f~ . 2005.
MAYOR
1=
ATTEST: Approved as to fonn and legal sufficiency.
iENii:~~
CITY CLERK
1
LA..,.. TONI L.CRAIG (
CITY ATTORNEY
c)
J
New language is underlined.
Deleted language is strioken.
Toni L.Craig Page 12 11/8/ 2005
City of Fort Walton Beach
Memorandum
To: Joyce Shanahan, City Manager
From: Thomas Murray, Public Works Director
Date: December 5, 2006
Subject: City Council Workshop
Proposed Brooks Bridge Parking Lot
Backeround:
In FY 04- 05, the City created CIP 5361 for the Brooks Bridge Parking Lot, within the CRA Fund.
The project was funded at $ 88, 000. In FY 04- 05, $ 4, 500 was spent for surveying leaving a current
balance of$ 83, 500. The project objective was to create a public parking lot and increase available
off-street parking.
To date, the CDS Department has laid out the most feasible parking lot orientation and developed a
conceptual site plan and Public Works has prepared a cost estimate. At this stage of the project, CDS
is preparing to turn the project over to Public Works for execution. However, the project cost is very
high for a small increase in parking. Therefore, Staff desires to discuss this project at a Council
Workshop and obtain Council direction to either proceed with the project or cancel it.
The attached drawing details the project area, conceptual site plan, State ROW, and the Pat' s Bait and
Tackle property.
Discussion:
There are several issues to consider, including:
Cost
Based on the conceptual site plan, the estimated cost is $ 105, 300, with the following breakdown:
Paving $ 57,200
Lighting 21, 500
IrrigationlDrainage 12, 300
Landscaping 14.200
Total $ 105, 300
The cost estimate is based on a proportionately similar scope of work as compared to the 2001
Municipal Parking Lot project at 207 Miracle Strip Parkway, SE, with the costs escalated to 2007
values.
Page 1
qfLf
The paving scope includes constructing the new parking lot and reconstructing the existing parking lot
to make it more compatible with the new area.
The lighting scope includes significant lighting throughout the project area.
The irrigation/drainage scope includes irrigation to support landscaping in the project area and
accommodate the site' s stormwater management demands. This will involve modifications to the
bridge drainage, which currently just discharges down into the proposed parking lot through several
ports through the bridge decking.
The landscaping scope includes sufficient landscaping to beautify the project area and make it
attractive.
Property Ownership
The properties affected by this project are owned by the State of Florida and the Neil A. & Barbara
Bennett Trust (Pat's Bait and Tackle property). Based on information from the Okaloosa Property
Appraiser' s Office and the State of Florida,the majority of the Pat' s Bait and Tackle existing parking
lot is actually on State property and a portion of the new construction area is on Pat's Bait and Tackle
property.
Leases with FDOT and the Pat's Bait and Tackle property owner would be necessary.
Access
In order to provide safe vehicle access to the parking lot, driveways cannot be allowed along the
curved portion of Brooks Street. Therefore, the parking lot entrance would be shared with the south
Pat's Bait and Tackle entrance.
ofParking Spaces
Based on the conceptual site plan, the proposed project has a net gain of 11 parking spaces: 12 new
parking spaces on State ROWand one less space in the existing parking lot. In order to provide
reasonable vehicle circulation, the existing parking used for Pat' s Bait and Tackle would be reduced
from 7 parking spaces to 6. The existing boat/trailer parking space would be relocated and still be
available.
The number of new parking spaces is low because of the limited accessible area under the bridge,
particularly due to the structural bridge columns.
Cost per Parldnf!Space
Considering all 19 parking spaces, the project cost per parking space is $ 5, 542. Considering only the
net gain of 11 parking spaces, the project cost per parking space is $9,573.
Safety
This parking lot location is somewhat remote and hidden,presenting concerns for public safety.
Additionally, while proposed crosswalks are shown on the site plan, there is a strong likelihood that
pedestrians will cross Brooks Street within its curved portion, which is not safe for pedestrian passage.
Page 2
Utilities Conflicts
Numerous utilities are located under the bridge that will need to be relocated or protected.
Drainage
As mentioned in the Cost section, the bridge drainage would need modification to prevent
damage/ injury from drainage pouring freely from above onto the parking lot. Standard retention
basin( s) would also be incorporated into the landscaping layout.
Recommendation:
Considering the extremely high cost of the project, the site' s remote location for a public parking lot,
and other pending funding needs within the CRA area, Staff recommends the City Council cancel this
Brooks Bridge Parking Lot CIP 5361 and make the funding available for other CRA projects.
Prepared and Submitted Bv:
M,y~ IZ/ S-/ ob
Thomas Murray, PE Date
Public Works Director
Reviewed and Concur:
Joyce Shanahan Date
City Manager
Page 3
PROPOSED PARKING LOT
UNDERNEATH BROOKS BRIDGE
v;
J.
o
I
31
il I
0>- I
1>
00
2
4;-~
cfO>
Q
LEGEND
Asphalt
CJ Parking Lot
Landscaping JV
jDrainage Area City of Fort Walton Beach
Engineering Division
PROPOSED BROOKS BRIDGE PARKING LOT
DECEMBER 5, 2006
C:\ DWG\ SE\ Conceptual parking Lot Plan2. DWG 5361
Plotted Tuesday, December 05, 2006 5: 37: 11 PM SCALE 1" = 40'
