About this source
Action Item Printout from the Okaloosa County BOCC meeting of October 7, 2014 (IQM2 meeting #1235). Original portal label: Action Item Printout. Preserved as a historical public record; part of the meeting linked as a related source.
- Original publication
- Action Item Printout
- Date
- October 7, 2014
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
HOW FAR THIS HAS BEEN CHECKED
- File / copy authenticity
- Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
- Transcription / extraction
- Machine produced / unreviewed — machine-extracted, not yet human-corrected
- Claim corroboration
- Not independently verified
View reference catalogue / source ↗
Download this source
Action Item Printout (PDF)
Original PDF as published on the Okaloosa County IQM2 meeting portal.
PDF · 341.6 KB
Download ↓Machine-extracted text — 53-Action Item Printout.pdf
Text extracted on 2026-10-31 from 53-Action Item Printout.pdf using the PDF text layer (pdftotext). Not human-corrected; may contain recognition errors. Read alongside the source images.
Text · 2.4 KB
Download ↓
Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: October 7, 2014
TO: Honorable Chairman and Members of the Board
FROM: Zan Fedorak
SUBJECT: Seeking Approval to Negotiate Contract for Admin of NWFRA Baggage
Handling System (AP 70-14)
DEPARTMENT: Purchasing
BCC DISTRICT: All
STATEMENT OF ISSUE: Requesting approval for contract negotiations with Michael Baker
for professional architect/engineer (A/E) services to administer and inspect third-party
construction of the Northwest Florida Regional Airport Baggage Handling system. (AP 70-14).
BACKGROUND & ANALYSIS: The Airports Department requested to solicit firms to
administer and inspect third-party construction of the Northwest Florida Regional Airport
Baggage Handling system. The Board approved the Request for Qualifications (RFQ) on July 1,
2014. The RFQ was due on September 5, 2014, and two (2) proposals were received. The
Airports Department has requested authorization to negotiate a contract with Michael Baker as
the top ranking firm.
The scope of professional services will include, but is not limited to; Administration of
construction contract with selected general contractor to include weekly progress meetings,
quarterly reports, site visits, review of submittals, review of contractor pay applications,
clarification of construction documents, preparation of change orders, and other administrative
items as needed; Coordination with regulatory agencies; Full-time inspection of the construction
work to include the coordination of material acceptance testing, verification of completed
quantities, and reviews of construction schedule; Services performed relating to the
Transportation Security Administration (TSA) Recapitalization Project at Northwest Florida
Regional Airport.
OPTIONS: Approval/Deny entering into contract negotiation with Michael Baker for
professional architect/engineer (A/E) services to administer and inspect third-party construction
of the Northwest Florida Regional Airport Baggage Handling system.
RECOMMENDATION: Staff recommends approval of entering into contract negotiation with
Michael Baker for professional architect/engineer (A/E) services to administer and inspect third-
party construction of the Northwest Florida Regional Airport Baggage Handling system.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator
Related sources
This action item printout is part of the Okaloosa County BOCC meeting of October 7, 2014.