READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 10-25-05 Regular — reading text
Part 11 of 12. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-10091-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Exhibit B
I. AFMC-EG- 3- 05- 010
EGLIN AIR FORCE BASE, FLORIDA
DESCRIPTION FOR SEWAGE EFFLUENT DISPOSAL FIELD
LICENSE TO THE CITY OF FORT WALTON BEACH, FLORIDA
PARCEL 1
All that tract or parcel ofland lying and being in Sections 22, 23, 26 and 27, Township 1 South,
Range 24 West, Tallahassee Meridian, Okaloosa County, Florida, being more particularly
described as follows:
Commencing at Eglin Air Force Base boundary maker " J- 110", which is on the East line and
2, 640 feet, more or less, North of the Southeast comer of said Section 26 and at a comer of a
tract of land owned by the United States of America at Eglin Air Force Base;
Thence N 01' 41' E 1, 000.0 feet to a point on the South line of a tract of land leased to Okaloosa
County, Florida,by the United States of America for a sewage effluent disposal field;
Thence Due West along said Okaloosa County leased tract 3, 870 feet, more or less, to a point
which is at a comer of said leased tract and on the Ease right- of-way line of a power line
easement granted to the Gulf Power Company by the United States of America;
Thence continue Due West 100 feet to a point which is on the West right- of-way line of said
Gulf Power Company easement, the Southeast comer of a tract ofland leased to the City of Fort
Walton Beach, Florida, by the United States of America for a sewage effluent disposal field, and
the POINT OF BEGINNING;
Thence S 02' 03' E along the West right- of-way line of said Gulf Power easement 2, 330 feet,
more or less, to boundary marker " J -79" which is at a comer of said United States tract;
Thence N 87' 46' W along the boundary of said United States tract 1, 330. 8 feet, more or less, to
boundary marker " J- 78";
Thence continue N 87' 46' W along boundary of said United States tract 1, 334.4 feet, more or
less, to boundary marker " J- 71," which is at a comer of said United States tract;
Thence NOr 46' E along the boundary of said United States tract 1, 328. 1 feet, more or less, to
boundary marker " J- 73," which is at a comer of said United States tract;
Exhibit B-
Thence N 88. 01' W along the boundary of said United States tract 1, 294. 5 feet, more or less, to
a point on the East side of an existing road, said point lying 55. 2 feet S 88' 01' E of boundary
marker " J- 74";
Thence Northerly along a line parallel to the centerline of said existing road 3, 514. 6 feet, more or
less, to a point on the South right- of-way line of a poser line easement granted to the Gulf Power
Company by the United States of America;
Thence N 65"46' E along the South right- of-way line of said Gulf Power Company easement
4,332 feet, more or less, to a point on the West right- of-way line of another power line easement
granted to the Gulf Power Company by the United States of America;
Thence S 02' 03' E Along West right- of-way line of said other Gulf Power Company easement
1, 630 feet, more or less, to a point which is at the Northeast comer of said tract ofland leased to
the City of Fort Walton Beach, Florida;
Thence Due West along the North line of said City of Fort Walton Beach leased tract 3, 099. 8
feet, more or less, to a comer of said tract;
Thence Due South along West line of said City of Fort Walton Beach leased tract 2, 800 feet,
more or less, to a comer of said tract;
Thence Due East along South line of said City of Fort Walton Beach leased tract 3, 200 feet,
more or less, to the point of beginning.
Containing 288. 00 acres, more. or less, and being a part of Tracts B and B- 1 of Eglin Air Force
Base.
PARCEL 2
All that tract or parcel of land lying and being in Section 27, Township 1 South, Range 24 West,
Tallahassee Meridian, Okaloosa County, Florida,being more particularly described as follows:
of said section.
of the SE y..
The West 15 feet of the SW y..
Containing 0.45 of an acre, more or less, and being a part of Tract B- 1 of Eglin Air Force Base.
Parc~ls 1 and 2 contain in the aggregate 288.45 acres, more or less.
WAIVER OF ENVIRONMENTAL BASELINE SURVEY (EBS)
License Renewal for the Fort Walton Beach City Spray Field
RCS 05- 654
CERTIFICATION
The 96 CEG/CERR proposes to grant a license renewal to allow the city of Fort Walton Beach to'
continue to use 488 acres of Eglin property for an effluent spray field. This action allows the
city of Fort Walton Beach to continue to utilize the spray field for sewage effluent disposal. The
license renewal is needed to allow the city to continue to conduct safe operations of the city' s
wastewater treatment facility. Property is located north of Lewis Turner Blvd on the Eglin
reservation.
This action is recommended for a' waiver of an EBS. Changes in land use have not occurred, nor
will any land use changes result from the renewal of this license.
96 CEG/ CEVSP has conducted an initial record review, personnel interviews and a site visitation
to detennine that there are no potential sources of contamination. Also the proposed license
amendment area has been examined to determine the following:
I. The condition of the property will not create health or safety risks when used as intended.
2. The allowable activities will not introduce hazardous materials or petroleum products on
the property.
3. No material alteration or change in the physical condition of the property will occur if the
property is held by the Air Force, such that the Air Force could be deemed an owner/ operator of
the facility under the Comprehensive Environmental Response, Compensation and Liability Act.
The above described property use meets the conditions identified in Section 1. 5. 2 of the
Air Force Instruction 32- 7066, 25 April 1994, and thereby qualifies for this waiver ofEBS. The
infonnation contained within this waiver report is based on records made available and, to the
best of my knowledge, is correct and current as of 13 September 2005.
CERTIFIEDBY'~~^
OMAS L.CRAVERS, GS- 12
DATE:
16SepoS
Physical Scientist, Environmental Analysis Section
APPROVED BY: DATE: 10 O,f of
TIMOT P. Y, Co el, USAF
Commander, 96th Ivil Engineer Group
CITY COUNCIL MEETING
Octo,ber 25, 2005
Public Hearing
Consideration of conducting a Public Hearing and
establishing a Special Assessment District for
improvements on Stokes Avenue
Public Works Director)
Council Action
1st
2nd
Vote:
Agenda Item Number: PH - 5
City of Fort Walton Beach, Florida
Memorandum
DATE: October 14, 2005
TO: Joyce Shanahan, City Manager
FROM: Thomas Murray, Public Works Director
SUBJECT: Stokes Avenue Improvements/ Special Assessment District ( CD 6- 97)
Backe:round:
The Stokes Avenue right- of-way is located on the north side of Lovejoy Road, at its west end
near the old Hurlburt entrance. It was deeded in fee simple to the City of Fort Walton Beach in
1990 and is approximately 660 feet long. Although the south portion of Stokes Avenue does
have an asphalt surface, the paving was not built to City street construction standards. It will
have to be removed for utility installation and will be properly reconstructed through the
proposed Special Assessment District.
Stokes Avenue presently serves approximately nine ( 9) businesses and undeveloped industrial
properties. Water service for the existing businesses is nom the City' s water main on Lovejoy
Road. The businesses use septic tanks for sewage disposal. No further development is possible
along Stokes Avenue until adequate water, sewer, street and drainage improvements are provided
in Stokes A venue. Stokes Avenue property owners requested the City construct the necessary
water, sewer, street and drainage improvements for Stokes Avenue.
On August 23, 2005, City Council declared a Special Assessment District for the water, sanitary
sewer, street anddrainage improvements on Stokes Avenue. Choctaw Engineering, the
engineering firm for this project, has prepared construction plans and specifications for these
improvements. Plans for street construction include a 26 feet wide street with flat curb, drainage
swales, stormwater retention area, and a vehicle turnaround. Utility construction includes an 8"
water main with fire hydrants and taps for future connections and an 8" gravity sanitary sewer
main with taps for future connections. The street and drainage construction will be done by a
licensed contractor and the water and sewer construction will be done by City crews.
City Staff met with Stokes Avenue property owners on March 17, 2005; May 25, 2005; and
August 9, 2005 to discuss the assessment costs and the assessment process. At these meetings,
the property owners reiterated their need for these improvements, although some were concerned
about the amounts and distribution of the assessments. The estimated street and drainage costs
are based on the construction bid received on July 26, 2005. The estimated water and sewer
costs are based on the construction estimate for city crew construction.
PH- s
1---
I
On September 13, 2005, City Council approved Resolution 05- 32, which set a Public
Hearing for
October 25, 2005 at 7: 00 PM ( or as soon thereafter as the issue may be heard) at the City Council
Chambers, at which the property owners that are to be assessed and the public may be heard
regarding " the propriety and advisability of making such improvements."
As approved by Council in Resolution 05- 32, the Preliminary Assessment Roll levies water and
sanitary sewer assessments on a square footage basis and levies street and drainage on a front
footage basis. The Preliminary Assessment Roll is based on an estimated total project cost of
228, 018. 08, which includes construction costs, contractual engineering costs, pennit fees, City
Staff costs and City Attorney costs. The Preliminary Assessment Roll also shows the
assessments payable in twenty annual installments at 5% interest per annum. ( The Florida
Statutes allow up to a thirty year period at 8% interest. The proposed payment period and
interest rate are the same as established for the 2002 Girard Avenue assessment.)
Discussion:
Pursuant to Chapter 170. 08 of the Florida Statutes, the City Council shall conduct a Public
Hearing at which the property owners that are to be assessed and the public
