deceleration plus conservative two-minute stacking
storage length requirements for the left turn lane total 630 feet. The existing left
turn lane is approximately 680 feet in length. Therefore, the existing left turn lane is
adequate to accommodate the increase in traffic.
Nature Lake
Transportation Concurrency Analysis 8
Packet Pg. 29
Figure 3
Right Turn Lane Analysis
Location: Westbound Right Turn into Project from Lake Silver Road
Project: Nature Lake
Guideline for determining the need for a major-road right-turn bay at a two-way stop-controlled intersection.
INPUT
Roadway geometry: 2-lane roadw ay
200
Right-Turn Volume, veh/h
Variable Value 180 Add right - turn bay
Major-road speed, mph: 35 160
Major-road volume (one direction), veh/h:* 550 140
Right-turn volume, veh/h: 100
120
100
80
OUTPUT Do not add right - turn bay
60
Variable Value
40
Limiting right-turn volume, veh/h: 145
20
Guidance for determining the need for a major-road
right-turn bay for a 2-lane roadway: 0
200 300 400 500 600 700 800 900 1000 1100 1200
Do NOT add right-turn bay.
Major-Road Volume (one direction), veh/h
source: Evaluating Intersection Improvements: An Engineering Study Guide
NCHRP Report 457
*note minimum volume of 250 for marker to indicate on chart.
Posted speed is 30 mph
Major road background volume estimated based on existing development + trips from committed projects as of December 2010
Nature Lake
Transportation Concurrency Analysis 9
Packet Pg. 30
Figure 4
Turn Lane Dimensions
Nature Lake
Calculations Based on FDOT Guidelines
Intersection NB Right from SR 85 onto Lake Silver Rd
Scenario PM Peak Hour
Date 7/26/2012
General Information:
Turn Lane Type Left
Approach NB
Traffic Control Type Unsignalized
Time of Day PM
Number of Lanes 1
Geometric Conditions Rural
Design Speed 60 mph
Turn Lane Parameters:
Vehicle Length 25 feet
Peak Cycle Factor 30
Turning Traffic Volume 250
Storage:
2-Minute Stacking During Peak 15 Minutes 8.33 vehicles
Total 2-Minute Stacking Needed 225 feet
(rounded up to whole vehicles)
Minimum Required Storage N/A
Number of Turn Lanes 1
Design Storage Length per Lane 225 feet
Deceleration:
Taper 50 feet
Total Deceleration Distance 405 feet
Total Turn Length (including Taper) 630 feet
Nature Lake
Transportation Concurrency Analysis 10
Packet Pg. 31
Conclusion
A traffic impact analysis was conducted for the proposed Nature Lake project, which
will be located on the north side of Lake Silver Road approximately 0.68 miles west
of State Road 85 in unincorporated Okaloosa County, Florida.
The following is a summary of the findings and observations of this report:
The existing northbound left turn lane on State Road 85 turning left onto
Lake Silver Road appears long enough to accommodate the proposed future
traffic including this project.
The project access location on Lake Silver Road does not meet requirements
for a left turn lane or a right turn lane. As a mitigation measure, however, the
project proposes a right turn deceleration lane into the project to reduce
delay for Lake Silver Road drivers traveling west, which is the afternoon peak
direction.
Portions of State Road 85 and Airport Road are projected to be deficient
prior to the addition of project traffic. The applicant proposes to address
mitigation with a developers agreement with Okaloosa County.
Nature Lake
Transportation Concurrency Analysis 11
Packet Pg. 32
Exhibit 1
Supporting Data
Packet Pg. 33
21-Feb-2012 16:55:02 Page -218- of -367- 555RPT [1,0,0,2] 3_57_AXWOY.txt
2011 Weekly Axle Factor Category Report - Report Type: ALL
County: 57 - OKALOOSA
Week Dates 5713 5714 5716 5717
SR397 SR20,SR397 - WALT.CO OKALOOSA RURAL OKALOOSA URBAN
1 01/01/2011 - 01/01/2011 1.00 0.98 0.94 0.99
2 01/02/2011 - 01/08/2011 1.00 0.98 0.94 0.99
3 01/09/2011 - 01/15/2011 1.00 0.98 0.94 0.99
4 01/16/2011 - 01/22/2011 1.00 0.98 0.94 0.99
5 01/23/2011 - 01/29/2011 1.00 0.98 0.94 0.99
6 01/30/2011 - 02/05/2011 1.00 0.98 0.94 0.99
7 02/06/2011 - 02/12/2011 1.00 0.98 0.94 0.99
8 02/13/2011 - 02/19/2011 1.00 0.98 0.94 0.99
9 02/20/2011 - 02/26/2011 1.00 0.98 0.94 0.99
10 02/27/2011 - 03/05/2011 1.00 0.98 0.94 0.99
11 03/06/2011 - 03/12/2011 1.00 0.98 0.94 0.99
12 03/13/2011 - 03/19/2011 1.00 0.98 0.94 0.99
13 03/20/2011 - 03/26/2011 1.00 0.98 0.94 0.99
14 03/27/2011 - 04/02/2011 1.00 0.98 0.94 0.99
15 04/03/2011 - 04/09/2011 1.00 0.98 0.94 0.99
16 04/10/2011 - 04/16/2011 1.00 0.98 0.94 0.99
17 04/17/2011 - 04/23/2011 1.00 0.98 0.94 0.99
18 04/24/2011 - 04/30/2011 1.00 0.98 0.94 0.99
19 05/01/2011 - 05/07/2011 1.00 0.98 0.94 0.99
20 05/08/2011 - 05/14/2011 1.00 0.98 0.94 0.99
21 05/15/2011 - 05/21/2011 1.00 0.98 0.94 0.99
22 05/22/2011 - 05/28/2011 1.00 0.98 0.94 0.99
23 05/29/2011 - 06/04/2011 1.00 0.98 0.94 0.99
24 06/05/2011 - 06/11/2011 1.00 0.98 0.94 0.99
25 06/12/2011 - 06/18/2011 1.00 0.98 0.94 0.99
26 06/19/2011 - 06/25/2011 1.00 0.98 0.94 0.99
27 06/26/2011 - 07/02/2011 1.00 0.98 0.94 0.99
28 07/03/2011 - 07/09/2011 1.00 0.98 0.94 0.99
29 07/10/2011 - 07/16/2011 1.00 0.98 0.94 0.99
30 07/17/2011 - 07/23/2011 1.00 0.98 0.94 0.99
31 07/24/2011 - 07/30/2011 1.00 0.98 0.94 0.99
32 07/31/2011 - 08/06/2011 1.00 0.98 0.93 0.99
33 08/07/2011 - 08/13/2011 1.00 0.98 0.93 0.99
34 08/14/2011 - 08/20/2011 1.00 0.98 0.93 0.99
35 08/21/2011 - 08/27/2011 1.00 0.98 0.93 0.99