Split Trips
ITE Code 210
Ln(T) = 63% enter 101 enter
Single Family 160 du 160
0.90 Ln(X) + 0.51 37% exit 59 exit
Detached Housing
Nature Lake
Transportation Concurrency Analysis 3
Packet Pg. 24
Nature Lake
Transportation Concurrency Analysis 4
Packet Pg. 25
Level of Service Analysis
The level of service analysis may be found in Table 2 for State roads and Table 3 for
County roads. Peak hour service volumes were determined using generalized tables
from the Florida Department of Transportation (FDOT) Level of Service Manual.
As indicated in Table 2, State Road 85 and Airport Road are projected to have traffic
that may potentially exceed the maximum service volumes found in the FDOT
Generalized Tables.
The potentially over-capacity segments on these roadways are existing deficiencies
and are not caused by the proposed project. With regard to the Airport Road
segment, the roadway currently operates at only about 40% of its LOS D maximum
service volume, but the analysis indicates that the roadway is potentially over
capacity due to committed traffic. In fact, committed traffic accounts for over 60%
of the roadway’s LOS D maximum service volume, with the River Park PUD Master
Plan consuming the largest share (454 trips) of the committed traffic. Given the
long-range and uncertain nature of that project, Airport Road will continue to
operate with considerable available capacity remaining for an extended period.
In order to mitigate the project’s impact upon the roadway system, the applicant
proposes to enter into a developer’s agreement with Okaloosa County.
One mitigation measure that the applicant proposes to take is to provide a
deceleration lane on Lake Silver Road at the project entrance location. While the
project traffic does not meet the numeric warrant criteria for the installation of a
right turn lane, such a lane is proposed in order to reduce the delay for westbound
drivers on Lake Silver Road, as that is the peak direction of travel in the afternoon
period.
Nature Lake
Transportation Concurrency Analysis 5
Packet Pg. 26
Table 2
Concurrency Level of Service Analysis for State Roads
PM Peak Hour Conditions
Nature Lake
101 enter
59 exit
PM Project
PM Pk 2011 count Existing Peak Exist + Project Total Remaining Traffic
Segment Pk Service FDOT Peak Hr Commit Commit Traffic Project Future Service as a % of
Road From To Dir Dir Volume Site # AADT K D Dir Traffic Traffic Traffic Assign Traffic Traffic Volume Service Vol
SR 85 Stillwell Blvd Old Bethel SB 1,800 1603 21,000 0.0900 0.5260 896 895 1,791 52% 31 1,822 (22) 1.7%
NB PD 994 1,503 2,497 52% 53 2,550 (750) 2.9%
Old Bethel End of 4-lane SB 2,420 0138 * 4,400 0.0950 0.5850 173 761 934 89% 53 987 1,433 2.2%
NB PD 245 1,256 1,501 89% 90 1,590 830 3.7%
End of 4-lane County Line SB 430 0051, 0054, 0118, 3,638 0.0950 0.5850 143 761 904 9% 9 914 (484) 2.1%
NB PD 0138, 0356T ** 202 1,256 1,458 9% 5 1,463 (1,033) 1.2%
US 90 Antioch Road W Crestview City Limits EB 1,800 1602, 0122T *** 14,833 0.0900 0.5260 633 200 833 4% 4 837 963 0.2%
WB PD 702 204 906 4% 2 909 891 0.1%
E Crestview City Limits Fairchild Rd EB PD 3,130 1601 11,000 0.0900 0.5260 521 99 620 2% 1 621 2,509 0.0%
WB 469 179 648 2% 2 650 2,480 0.1%
* Station 570138 is approximately 2.0 miles north of this segment, but is the most similar station in terms of observed traffic volume for this segment
** Stations on this segment:
0051 3600
0054 3400
0118 3000
0138 4400
0356T 3790
*** Stations on this segment:
1602 17000
0122T 12666
Nature Lake
Transportation Concurrency Analysis 6
Packet Pg. 27
Table 3
Concurrency Level of Service Analysis for County Roads
PM Peak Hour Conditions
Nature Lake
160
Existing Project
Adopted PM Pk Daily PM Two-Way Existing + Project Two-Way Total Remaining Traffic
Segment LOS Service Traffic Axle Seasonal K Peak Committed Committed Traffic Project Future Service as a % of
Road From To Dir Std Volume (Unadjusted) Factor Factor Factor Traffic Traffic Traffic Assign Traffic Traffic Volume Service Vol
Old Bethel Rd/CR 188 SR 85 US 90 EB D 1,460 6,314 0.94 0.95 0.0900 507 342 849 14% 22 872 588 1.53%
WB
Airport Rd/CR 188 SR 85 John Givens Rd EB D 1,460 6,774 0.94 0.95 0.0900 544 966 1,510 23% 37 1,547 (87) 2.52%
WB
Nature Lake
Transportation Concurrency Analysis 7
Packet Pg. 28
Operational Analysis
Operational analysis in the form of turn lane analyses was conducted for the project
entrance on Lake Silver Road and the intersection of State Road 85 and Lake Silver
Road.
Lake Silver Road Project Entrance Location
Criteria for determining right turn lane requirements are provided in "Intersection
Channelization Guide," Transportation Research Board (NCHRP) Report Number
279.
During the PM peak hour, it was conservatively estimated that nearly all of the
project entering traffic would turn right into the project. Accordingly, it is estimated
that 100 vehicles will turn right onto the project entrance road from Lake Silver
Road. The westbound existing volume on Lake Silver Road (right plus through
movements) is estimated to be 550 vehicles based on existing traffic and
development plus committed traffic for projects located on Lake Silver Road. For the
purposes of this analysis, a 35 mph design speed was used (the posted speed limit is
30 mph). As indicated in Figure 3, a right turn lane is not warranted at this location.
Since no significant traffic volume is projected to turn left into the site from the west
on Lake Silver Road, a left turn lane analysis is not applicable.
State Road 85 Northbound Left Turn onto Lake Silver Road
Criteria for examining left turn lane requirements are provided in "Aspects of Traffic
Control Devices," Highway Research Record Number 211, National Research Council.
While a left turn lane exists at this location, the purpose of this analysis was to
determine the dimensional requirements of the northbound left turn lane based on
total future northbound left turning traffic from State Road 85 onto Lake Silver
Road.
During the PM peak hour, it is estimated that 90 project vehicles will turn left onto
Lake Silver Road from State Road 85. This results in a future estimated northbound
total left turn volume of 250 vehicles during the PM peak hour. For the purposes of
this analysis, a 60 mph design speed (55 mph posted) was used for State Road 85.
As indicated in Figure 4, the