READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 11-23-2010 Regular — reading text
Part 6 of 60. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-25200-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
expected to
replace roofs and /or paint approximately 20 homes in the City of Fort Walton Beach from
June 21 - 25, 2010.
The City' s Community Redevelopment Agency ( CRA) Capital Improvement Program
CIP) budget includes funds for payment of building permit fees and water and sewer
connection fees for affordable housing construction projects, for the purchase of lots for
Habitat forHumanity, and for other capital improvements in the Beal Parkway
Neighborhood. The funding for these programs in FY 2006 -07 was $ 217, 726. 00; in FY
2007 -08 was $ 251, 035. 00; in FY 2008 - 09 was $ 235, 000; and FY 2009 -10 is $ 475, 000.
In FY 2008 -09,
the CRA funded a project to construct a Gateway Park for the Beal
Parkway Neighborhood and assisted Habitat for Humanity with the purchase of a
residential lot on Methodist Avenue SE for the construction of multi -family units. In FY
2009 -10,
funding is allocated to begin the design for streetscape projects along Third
Street SE and Carson Drive SE. See the attached maps for the CRA boundaries, CDBG
target areas, and the neighborhoods within the City.
c Activities to be undertaken 91. 220c
ADMINISTRATION / PLANNING:
Administration / Plannin Bud et Amount: $ 28, 444
City of Fort Walton Beach Target Area: Not Applicable
Engineering Services Department Units of Service: Expenditure of grant
105 Miracle Strip Parkway SW funds to meet timelines
Fort Walton Beach, Florida 32548 Beneficiaries: Low /moderate income
850- 833 -9599 Matrix Code: 2 1 A
Pro ram Description:
Funds for administration and planning established for the CDBG program. This program
helps to assess community needs, plan the use of resources, provide for citizens input and
public information on programs, monitor and report on the use of funds and performance
of programs, and assure compliance with grant requirements. This project is eligible
under 24 CFR 570.205 and 570.206.
HOUSING REHABILITATION:
World Chan ers Bud et Amount: $ 35, 000
City of Fort Walton Beach Target Area: Citywide
Engineering Services Department Units of Service: 20 Households
105 Miracle Strip Parkway SW Beneficiaries: Low /moderate income
Fort Walton Beach, Florida 32548 Matrix Code: 14A
850- 833 -9599
Pro ram Description:
The World Changers program helps low- and moderate -income homeowners by replacing
roofs and painting the exterior of the home. This program is eligible under 24 CFR
570. 202.
YOUTH SERVICES:
Chester Pruitt Youth Enrichment Bud et Amount: $20, 000
City of Fort Walton Beach Target Area: Target Area 1
Engineering Services Department Units of Service: 40 -60 Low /Moderate
105 Miracle Strip Parkway SW Income Youths Ages 6 -12
Fort Walton Beach, Florida 32548 Beneficiaries: Low /moderate income
850- 833 -9599 Matrix Code: 05D
Pro ram Description:
This program provides after school and summer programs that engage, enrich, and
instruct youth in low- and moderate -income neighborhoods. This program is eligible
under 24 CFR 570. 201( e).
Gren Chapel A.M.E. Church Daycare Bud et Amount: $ 15, 000
Gregg Chapel A.M.E. Church Target Area: Target Area 1
P. O. Box 1779 Units of Service: 24 Low -Income Youth
34 Carson Drive SE Beneficiaries: Low /moderate income
Fort Walton Beach, Florida 32548 Matrix Code: 03M
850- 243 -5925
Pro ram Description:
This program provides perimeter fencing for a non -profit daycare center which serves
low- and moderate -income families. This program is eligible under
PUBLIC FACILITIES:
S4P Synenry Disaster Distribution Budget Amount: $ 6, 000
W Synergy, Inc. Target Area: Citywide
24 Bass Avenue SW Units of Service: 2, 000 Residents
Fort Walton Beach, Florida 32548 Beneficiaries: Low /moderate income
850- 833 -9599 Matrix Code: 03E
Pro ram Description:
This program provides funds to purchase an emergency natural gas generator for a
disaster distribution center to run an emergency soup kitchen and food pantry during
times of disaster in the greater Fort Walton Beach area. This program is eligible under
Infrastructure Improvements BudBud etet Amount:Amount:
$ $ 37,37, 768768
City of Fort Walton Beach Target Area: Target Area 1 & 2
Engineering Services Department Units of Service: Low /moderate income
105 Miracle Strip.Parkway SW neighborhoods
Fort Walton Beach, Florida 32548 Beneficiaries: Low /moderate income
850- 833 -9599 Matrix Code: 03L
Pro ram Description:
ThisThis programprogram providesprovides fundsfunds toto installinstall newnew sidewalkssidewalks and/and/ oror multimulti - - useuse pathspaths andand toto
improve improve thethe potable potable water,water, sanitarysanitary sewer,sewer, and/and/ oror stormwater stormwater infrastructureinfrastructure inin low-low- toto
moderatemoderate
- - incomeincome neighborhoods.neighborhoods. ThisThis programprogram isis eligibleeligible underunder
Table 4. FY 2009 -10 CDBG Pro¢ram Summary
Program Number Priority Outcome of Grant
Funding %
Administration / Planning:
Administration / Planning 6 Provide administration 285444 20.0%
and planning of the
City' s CDBG program
Homeowner Rehabilitation:
World Changers DH1 1 Providing decent housing — 35, 000 24. 6%
Assist approximately 20
single family residences of
low /moderate income via
re- roofing and exterior
painting
Youth Services:
Chester Pruitt Youth SL1 1 Providing a suitable living 20, 000 14. 1%
Enrichment environment —Assist 40 -60
low /moderate income
youths ( ages 6 -12) by
conducting summer
programs and over 400
low /moderate income
youths through tutoring
programs that provide over
135 hours of tutoring
Gregg Chapel A.M.E. Church SL1 2 Providing a suitable living 15, 000 10. 5%
environment —Assist 24
Daycare Fencing
low /moderate income
youths by constructing a
new brick and aluminum
perimeter fence around the
daycare center playground
Public Facilities:
S4P Synergy, Inc. Emergency S11 3 Providing a suitable living 6, 000 4. 2%
Generator environment —Assist over
2, 000 residents in the
Greater Fort Walton Beach
area by purchasing a natural
gas emergency generator to
operate a disaster
distribution center
Infrastructure Improvements DH 2 Providing a suitable living 37, 768 26. 6%
environment —Assist
various neighborhoods with
the installation of sidewalks,
multi -use paths, and the
improvement of potable
water, sanitary sewer,
and/ or stormwater systems
TOTAL FUNDING: 142, 212 100%
VI. CDBG Program Year 2009 -2010 ( Section 91. 220)
d) Geographic Targeting. The City has established a CDBG Target Area within the
City which represents the Block Group with the greatest concentration of low- to
moderate -income households. All of the proposed Youth Services and Public
Facilities activities are located within the Target Area. The World Changers program
may be located anywhere within the City limits provided the households meet the
income qualification of extremely low, low and moderate income.
At the onset: of the CDBG program in the mid- 1970' s, federal regulations required
that certain activities be geographically targeted. Although this requirement has since
been removed, the City has continued its
targeting strategy. The primary
consideration for target area selection is neighborhood economic need ( low and
moderate income levels) followed by the degree of housing deterioration.
The geographic boundary of the two target areas are Hughes Street ( north), Eglin
Parkway ( east), Robinwood Drive (
