2. 3. 2 Installation of 1 EA cast -in -place concrete intake structure with overflow
control
2. 3. 3 Installation of 3 EA precast concrete junction boxes
3. FINANCIAL INFORMATION:
3. 1 The overall estimated cost to complete the project is $ 44, 440. 00. Based on the
75/ 25 cost allocation for the project, Okaloosa County would be responsible for
33, 330.00, and the City of Fort Walton Beach would be responsible for
119110. 00.
3. 2 In the cost estimate provided by Okaloosa County, the restoration costs for the
Golf Club property are estimated at $ 10, 800. 00.
3. 3 If approved, there are sufficient funds in the Stormwater Utility Enterprise Net
Assets due to the release of Water Quality Initiative funding in FY 2010.
4. RECOMMENDATION:
4. 1 Staff requests City Council authorization for the Mayor to execute a
Memorandum of Agreement with Okaloosa County to construct stormwater
system improvements at the Gibson Holding Pond on the City' s Golf Club
property to alleviate flooding issues along Mar Walt Drive.
4.2 Staff also requests City Council approval to utilize Stormwater Utility Enterprise
Net Assets funding, which is available due to the release of Water Quality
Initiative funding in FY 2010, to provide the necessary 25% cost allocation stated
in the Memorandum of Agreement. Based on the County' s cost estimate, this
amount should not exceed $ 15, 000. 00.
ATTACHMENTS:
5. 1 Memorandum of Agreement with Okaloosa County
5. 2 Okaloosa County Cost Estimate, dated October 28, 2010
6. SIGNATURE BLOCK:
6. 1 Submitted By: 11/ 02/ 10
Michael D. Beedie, P. E.
Engineering & Utility Services Director --
6. 2 Reviewed and Concur: 9 11/ 2/ 2010
Brandy Wunker, Finance Director
6. 3 Reviewed for Agenda: - 11115110
rt T. Mearns, City Manager
I MEMORANDUM OF AGREEMENT
2 WITH OKALOOSA COUNTY
3 FOR STORMWATER SYSTEM IMPROVEMENTS
4
5 THIS AGREEMENT is made and entered into this day of ,
6 2010, by and between the CITY OF FORT WALTON BEACH, FLORIDA, (hereinafter
7 referred to as " CITY "), and OKALOOSA COUNTY, FLORIDA (hereinafter referred to
8 as " COUNTY ").
9
10 WHEREAS, the City of Fort Walton Beach owns, operates, and maintains various
11 systems for the collection, storage, and conveyance of stormwater runoff , and
12
13 WHEREAS, stormwater infrastructure is necessary to provide for the safe
14
transport of stormwater runoff and to prevent storm- related flooding to private property,
15 and
16
17 WHEREAS, the CITY designs, operates, and maintains said systems in
18 accordance with all applicable local, State, and Federal guidelines, and
19
20
WHEREAS, the CITY owns and operates one such system commonly known as
21 the " Gibson Retention Pond" located within the City of Fort Walton Beach Golf Club
22 property more specifically described as the Northwest '/ 4 of the Northwest '/ 4 of the
23 Southwest 1/ 4 of Section 35, Township 1 South, Range 24 West,
Okaloosa County,
24 Florida, recorded in Plat Book 696, Page 261 of the Official Records of Okaloosa
25 County, and
26
27 WHEREAS, the Gibson Retention Pond system provides needed collection,
28 retention,
and treatment of stormwater runoff for surrounding CITY and COUNTY
29 properties, and
30
31 WHEREAS, the stormwater contribution to this system is comprised of
32 approximately 75% unincorporated COUNTY jurisdictional properties and 25% CITY
33 jurisdictional properties, and
34
35
WHEREAS, both parties agree that the upkeep and continued maintenance of the
36 Gibson Retention Pond is in each entities' best interest, and
37
38 WHEREAS, each party agrees to share in the cost for improvements and
39 perpetual maintenance of the Gibson Retention Pond stormwater system,
40
41 NOW, THEREFORE,
to delineate the procedures to be used by the CITY and
42 COUNTY for improvements to and perpetual maintenance of the Gibson Retention Pond
43 stormwater system the parties enter into this memorandum of agreement:
44
Page 1 of 5
45 SECTION 1: TERM:
46
47 1. 1. Permanent maintenance of the proposed piping system shall be the
48 responsibility of the COUNTY with respect to the overflow control structure, subsurface
49 piping, junction structures and outfall end treatments. Permanent maintenance of the
50 surface improvements and irrigation system associated with the golf course shall be the
51 responsibility of the CITY.
52
53 SECTION 2: COUNTY RESPONSIBILITIES:
54
55 2. 1. Pursuant to the project description below, the COUNTY shall coordinate with
56 the CITY to provide the services outlined in the Work Plan to achieve all tasks,
57 milestones, meetings, and any other critical dates required to complete the Project as
58 described below. The Work Plan will serve as the primary management tool for timely
59 and efficient performance of this project. A copy of the Work Plan is attached as Exhibit
60 " A."
61
62 2. 2. The Gibson Retention Pond improvement project is described as follows:
63
64 The project consists of the installation of approximately 780 linear feet of 30" reinforced
65 concrete pipe ( RCP) or equivalent ( HDPE) from the northeast corner of the Gibson
66 Retention Pond located within the City of Fort Walton Beach Golf Club property
67 terminating at an open outfall to the existing open -ditch drainage system located within
68 Golf Club property, and the installation of an intake structure.
69
70 The following improvements shall be considered part of the Work Plan ( Exhibit " A "):
71
72 a. 780 linear feet of 30" RCP or equivalent (HDPE),
73 b. One ( 1) cast -in -place concrete intake structure with outflow control,
74 c. Three ( 3) pre -cast concrete junction box, and
75 d. Miscellaneous materials needed to complete construction.
76
77 The actual boundaries, location of infrastructure, and property rights will be reflected in
78 the completed work plan and as -built drawings for the project.
79
80 2. 3. The COUNTY agrees to fund 75% of the total cost of the project to include
81 materials purchases, rental fees, and any other costs ancillary to the project. In the event
82 the project is outsourced to an independent contractor, the COUNTY agrees to a 75/ 25
83 funding methodology with the COUNTY funding 75% of the total cost of the project.
84
85 2. 4. The COUNTY agrees to provide all engineering plans, project specifications,
86 and permitting documentation for the project and construct the stormwater infrastructure
87 improvements in accordance with the approved plans and permits and in compliance with
88 all Federal, State, and local laws and /or regulations. The COUNTY also agrees to accept
89 all inspection and construction responsibilities during the construction of the stormwater
Page 2 of 5
90 infrastructure improvements except for the restoration of the disturbed areas across
91 property the Fort Walton Beach Golf Club.
92
93 2. 5. During construction of the improvements and if warranted due to
94 deteriorating weather conditions, the COUNTY agrees to coordinate with the CITY to
95 provide equipment, materials,
and manpower necessary to convey stormwater runoff
96
from the retention facility to the open -ditch system located within the Golf Club property.
97
98 2. 6.
The COUNTY agrees to follow existing and approved Best Management
99 Practices ( BMPs)
for sediment and erosion control during the period of construction for
100 the proposed improvements.
101
102 2. 7. The COUNTY agrees to share in the cost of future improvements to the
103 Gibson Retention Pond facility based upon the funding
methodology previously
104 identified in Section 2. 3 for the term of the agreement.
105
106
2. 8. The COUNTY agrees to provide written notification to the CITY, thirty ( 30)
107
days in advance of final approval, detailing any plans to expand the stormwater collection
108
system originating within the jurisdictional boundaries of the COUNTY and discharging
109 to the Gibson Retention Pond facility.
110
111 2. 9. The COUNTY agrees to indemnify and hold harmless the CITY, its
112
employees, agents, and assigns from the claims or causes of action asserted by any other
113 persons,
or in their own right, arising out of said activities. The COUNTY agrees that
114 these conditions and agreements are binding on all administrators, representatives,
115 assignees, and successors in action.
116
117 SECTION 3: CITY RESPONSIBILITIES:
118
119 3. 1. Pursuant to the project description outlined in Section 2. 2, the CITY shall
120
coordinate with the COUNTY to achieve all tasks, milestones, meetings, and any other
121 crucial dates required to complete the Gibson Retention Pond improvement project, and
122
to provide for the long -term upkeep and maintenance of the facility.
123
124 3. 2. The CITY agrees to fund 25% of the total cost of the proposed improvements
125 to include materials purchases, rental fees, and any other costs ancillary to the project. In
126 the event the project is outsourced to an independent contractor, the CITY agrees to a
127
75/ 25 funding methodology with the CITY funding 25% of the total cost of the project.
128
129 3. 3. The CITY agrees to provide the COUNTY, its employees, contractors, and
130 consultants,
access to the property for all pre -construction, construction, and post -
131
construction related activities to include access to the property for the term of the
132 agreement for inspection and maintenance related activities.
133
Page 3 of 5
134 3. 4. The CITY agrees to share in the cost of future improvements to the Gibson
135 Retention Pond facility based upon the funding methodology previously identified in
136 Section 3. 2 for the term of the agreement.
137
138 3. 5. Upon completion of the