READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 11-23-2010 Regular — reading text
Part 34 of 60. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-25200-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
financial liability and " unreasonable" hazard. Vague,
undefined terms can lead to claims of arbitrary and capricious requirements because the
standard can easily be defined differently for applicants with similar proposals.
4. Section 13. 20. 1. 0 — the last sentence requires proof of permits or exemptions prior to a
development order. Should this also include building permits?
5. Section 13. 21. 1 — is a development plan an application for a development order?
6. Section 13. 21. 2 — is a site plan the same as a development plan? (
Consistent terminology
should be used throughout).
7. Section 13. 21. 3. A —recommend a time limit for the determination of completeness and that
the notification to the applicant be in writing. In light of the fact that applications are not
accepted without a fee, what happens to the fee when an application is returned? It is
recommended that this section be expanded to allow a notification to the applicant of
deficiencies, a time period to correct deficiencies, and that the application and fee be
returned at the end of that time period if the deficiencies have not been corrected. It should
Page 120
Fort Walton Beach Evaluation and Diagnosis Preliminary Review of the LDC
Land Development Me
also be clarified that the deficiency is in the submittal package, and is not a deficiency in
meeting required standards.
8. Section 13. 21. 3. B — is expedited review a two-step process? First, an application for
expedited review is made, with a determination by the DS Director that expedited review is
appropriate.
Second, an application for building permit is submitted. It appears that this
is the case; if not, the section should be revised for clarity.
9. Section 13. 21. 3. B.2 — in light of the fact that an expedited review goes through the site
plan process, what is it about this review process that is expedited? In an earlier section, it
is indicated that expedited reviews skip to the building permit application, whereas this
section includes site planning.
10. Sections 13. 21. 3. 0 and D — a proposed project consisting of one or two townhouse units is
minor and a multi-family project with five or more units is major. Where does a townhouse
project with three or four units fit? Although not specified in Chapter 13, Chapter 16
Section 16. 54. 1) establishes that three or more townhouse units are considered a major
development.
11. Section 13. 21. 3. 0 — major developments must satisfy criteria for exempt developments.
What is an exempt development?
12. Section 13. 21. 4. A —what are exempt developments? This section indicates that site plans
for exempt development are not required to be certified and then refers to boundary
surveys.
According to State law, a boundary survey must be prepared by a registered land
surveyor.
This section should be clarified so that it is clear that the boundary survey is not
exempt from certification.
13. Section 13. 21. 4. B — does this mean that once a site plan is amended, subsequent
amendment continues to be reviewed in light of the original, not the latest amended and
approved site plan?
14. Section 13. 21. 4. 0 — is this provision consistent with the requirements in the Florida
Building Code regarding modifications to a project after the permit is issued?
15. Section 13. 21. 4. E — do the MPB and the CRA approve or make recommendations? It is not
clear.
16. Section 13. 21. 5 — this section is inconsistent with Section 13. 10. 2. 1) which authorizes
partial refunds.
17. Section 13. 21. 6 — this section duplicates, in part, Section 13. 10. 2. A, and conflicts with
Section 13. 10. 2. 0 which requires payment prior to commencement of processing rather
than prior to issuance of a development order.
18. Section 13. 21. 8 — the right of entry is indicated to include " after the development." Does
the right of entry ever expire?
19. Section 13. 21. 9 — as written, this section requires a master plan for any project that will
build out over more than one year. What is a conceptual site plan? There are no criteria
for a conceptual site plan.
20. Table 13 -1 is not consistent with the text. Either state which is controlling, table or text, or
revise text or table or both for consistency.
21. Table 13- 2 is not consistent with the text. Either state which is controlling, table or text, or
revise the text or table or both for consistency.
22. Table 13- 2 does not include a requirement for submittal of information regarding:
density
Page 21
Fort Walton Beach Evaluation and Diagnosis Preliminary Review of the LDC
Land Development Code
location relative to the SPZ, WPZ, or RDZ
whether ROW will be dedicated
pedestrian facilities in the TCEA
whether manufactured homes are proposed
compliance of single-family dwellings with required design standards
whether the development affects historic preservation
whether bonus density is requested
compatibility
building scale
xeriscaping techniques
stormwater facilities
dedication of public use sites when required
location relative to Hurlbert Field clear zones
location relative to wellhead protection areas
The above are all requirements from the Comprehensive Plan.)
23. Table 13 -2 is confusing in that similar issues are not grouped together. For example,
impervious surface is addressed in C. 1 and ground coverage is addressed in C. S. Are these
different issues?
Soil conditions are addressed in C. 4, while the possibility that soil borings
may be needed is in C. S. Physical features of the site are identified in C. 1, CA, C. 5, and
C. 6. Manmade features are listed in C. 1, C. 6, and C. B. Some items listed in C. 1 are again
listed in C. 5, C. 6, and C. 7. This section should be revised for clarity.
24. Section 13. 30 is entitled " Planning
Permit Procedures," while the sections within are
Development agreements," " Amendments to comprehensive plan," " Amendments to the
code," " Rezoning," " Zoning determination," " Conditional uses," " Temporary uses,
Administrative waivers," " Annexation," " Expansion of a
nonconforming building or
structure" which is actually addressed in Section 13. 50, and " Development in the
community redevelopment area." The only actions resulting in a permit are approvals of
conditional uses and temporary uses. It is recommended that permit procedures be
separated from other procedures for clarity.
25. Section 13. 30.5 pertaining to rezoning states that rezoning means both the initial zoning
and a change to the zoning classification of a parcel. It is unusual to define rezoning as the
initial zoning classification of land. The list of application information does not include a
request for information as to consistency of the requested zoning classification with the
Comprehensive Plan. The criteria for approval of a rezoning request do not include
consideration of consistency of the requested zoning classification with the Comprehensive
Plan.
26. Section 13. 30. 6. 0 requires that the zoning determination include a determination of
compliance with " all code provisions applicable to the proposed use." It is not clear how this
determination of compliance is different than a determination of compliance when
reviewing an application for development approval. This requirement appears to conflict
with earlier parts of Chapter 13.
27. Section 13. 30. 7 identifies approval of a conditional use as a development permit process.
Does this mean that consideration of a conditional use is not within the major, minor, or
expedited review requirements resulting in a development order?
Page 122
Fort Walton Beach Evaluation and Diagnosis Preliminary Review of the LDC
Land Development Code
28. Section 13. 30. 7. D. 3 requires a sufficiency determination within five days.
Is this different
from a determination of completeness? Why does a sufficiency determination have a time
limit but not a completeness determination for other applications? In light of the fact that
applications are not accepted without a fee, what happens to the fee when an application is
returned? It is recommended that this section be expanded to allow a notification to the
applicant of deficiencies, a time period to correct deficiencies, and that the application and
fee be returned at the end of that time period if the deficiencies have not been corrected. It
should also be clarified that the deficiency is in the submittal package, and is not a
deficiency in meeting required standards.
29. Section 13. 30. 7. E states that an application for a development permit for a conditional use
may result in issuance of a development order. There should be clarification between what
constitutes a development permit and a development order.
30. Section 13. 30. 7. F seems to imply that compliance with the design requirements for dry
storage facilities as a conditional use will result in approval, because the design
requirements will "
minimize any detrimental effects on neighboring properties." Further,
development standards should not be contained in a chapter on procedures. This section
also comingles submittal requirements with development standards.
31. Section 13. 30. 7. I allows appeals of a decision regarding a conditional use within thirty days
following the public hearing at which the conditional use was considered. In the case of
approval of the conditional use, the development order must be recorded within ten days
following approval. Should the recordation time be changed to avoid recording a
conditional use that is subsequently appealed?
32. Section 13. 30. 12 contains regulations pertaining to proposed development within the CRA.
Where the provisions of Section 13. 30. 12 differ from provisions set forth in Sections 13. 20
and 13. 21, which provisions control? For example, Section 13. 30. 12 does not require a pre -
application conference, a determination of completeness, or preparation of a master plan
