2015 Okaloosa County Annual Progress Report
Local Mitigation Strategy and Community Rating System
Introduction
In 2011, Okaloosa County and all its municipalities adopted a substantially revised version of the Local
Mitigation Strategy (LMS). The new LMS was found in compliance by the Florida Division of Emergency
Management in April 2011, and by the Federal Emergency Management Agency in May 2011. By July
2011, all the municipalities as well as the County had passed ordinances or resolutions adopting the 2011
LMS. Because it includes a comprehensive analysis of the County’s and municipalities’ floodplain areas
and floodplain management strategies, as well as analyses of all other hazards by which the County is
threatened, the LMS serves as the County’s Hazard Mitigation Plan as provided in Section 510 of the
Community Rating System (CRS) Coordinator’s Manual.
This Annual Report is structured to comply with the requirements of CRS Activity 510 reporting criteria as
provided in Section 510 of the National Flood Insurance Program Community Rating System Coordinator’s
Manual, FEMA publication FIA-15/2013.
Annual Report Preparation, Submittal to Governing Bodies, Release to Media, and Public
Availability
This annual report was prepared internally by the Planning Division of the Okaloosa County Growth
Management Department and has been distributed to all the municipalities.
For credit under the Community Rating System, this Annual Report must be distributed to the media and
be made available to the public. To this end, it is being sent to the Northwest Florida Daily News, and
copies of this Report are available for review or download online at the Growth Management portion of
the County Website, and may be viewed or obtained in hard copy at the Growth Management
Department’s offices located at the Water & Sewer Administrative Complex, 1804 Lewis Turner
Boulevard, 2nd Floor in Fort Walton Beach, or the North Planning Office located at 402 Brookmeade Drive
in Crestview. The entire 2011 LMS, as amended, may also be accessed via the Growth Management
portion of the County website or at the previously mentioned Growth Management office locations.
Revisions to Local Mitigation Strategy
Using the point ranking system established in the 2011 Local Mitigation Strategy, several projects have
the same points, therefore, projects are ranked using an alpha-numeric system based upon the population
the project would benefit. For example, a project with 30 points would rank as number 15 on the priority
list, and two projects have received 30 points. Project X with 30 points benefits an estimated 15
individuals; Project Y with 30 points benefits. On the priority list, Project Y would be ranked as 15a and
Project X would rank as 15b.
The following projects have been completed:
None.
2015 Okaloosa County Annual Progress Report Page 1 of 2
The following projects have been removed from the attached project list.
None.
Status of LMS Goals and Objectives
At this time, much of the work identified in the LMS is ongoing.
The Goals and Objectives (the statements under each Goal), provide the broad range of what is to be
accomplished during the five-year planning period from 2011 through 2015 by the LMS Steering
Committee. Since Action Items are, for the most part, ongoing activities – such as implementation of the
Florida Building Code, Floodplain Management practices, etc. – that are undertaken as part of the
County’s and municipalities’ day-to-day operations, their status is ongoing. Projects, on the other hand,
may be part of on-going, programmatic activities (such as, for example, installing generators to supply
emergency power at key infrastructure) or major, one-time (or at least very long term) upgrades of
facilities such as the construction of a new emergency operations center. At the time of this 2015 Annual
Report, all of the Goals and Objectives are being met.
2015 LMS Projects
Attachment A is the current list of LMS projects as approved by the LMS Committee. This list also provides
the status of each project, and states the reason (typically lack of funds) for any projects for which action
has been deferred.
Recommendations for New Projects or Revised Recommendations
Except for the new projects noted above, there are no new projects contemplated, not are there any
recommended revisions.
At this time the LMS Steering Committee is in the process of revising/updating the LMS as required for its
5 year cycle. General updates include recent storm events and 2010 Census population counts that were
not available at the time of writing of the 2011 LMS.