About this source
Notice of Public Hearing - East County Force Main and Repupmp Station from the Okaloosa County BOCC meeting of May 20, 2014 (IQM2 meeting #1199). Original portal label: Notice of Public Hearing - East County Force Main and Repupmp Station. Preserved as a historical public record; part of the meeting linked as a related source.
- Original publication
- Notice of Public Hearing - East County Force Main and Repupmp Station
- Date
- May 20, 2014
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
HOW FAR THIS HAS BEEN CHECKED
- File / copy authenticity
- Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
- Transcription / extraction
- Machine produced / unreviewed — machine-extracted, not yet human-corrected
- Claim corroboration
- Not independently verified
View reference catalogue / source ↗
Download this source
Machine-extracted text — 12-Notice of Public Hearing - East County Force Main and Repupmp Station.pdf
Text extracted on 2026-10-31 from 12-Notice of Public Hearing - East County Force Main and Repupmp Station.pdf using the PDF text layer (pdftotext). Not human-corrected; may contain recognition errors. Read alongside the source images.
Text · 6.7 KB
Download ↓Notice of Public Hearing - East County Force Main and Repupmp Station (PDF)
Original PDF as published on the Okaloosa County IQM2 meeting portal.
PDF · 157.4 KB
Download ↓
Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
NOTICE OF PUBLIC HEARING
NOTICE IS HEREBY GIVEN that the Board of County
Commissioners of Okaloosa County, Florida, on May 20, 2014 at 9:00 A.M., or
soon thereafter, at the County Commissioners meeting room, Water & Sewer
Annex, 1804 Lewis Turner Blvd., 3rd Floor, Ft. Walton Beach, Florida will hold a
hearing to discuss the County’s proposal to construct the East County Force Main
and Repump Station Project using Okaloosa County Water and Sewer Department
(OCWS) staff and equipment. The public hearing shall constitute the public
meeting as required by section 225.20, Fla. Stat. The purpose of the public meeting
is to consider whether it is in the public’s best interest to perform the project using
the local government’s own services, employees, and equipment. The scope of
work generally consists of the construction of a new 20 inch diameter sewer force
main (totaling approximately 6.7 miles in length) and a new 4.2 million gallon per
day sewer repump station. The estimated cost of the design-build project using
OCWS staff is $4,169,312.14.
ALL INTERESTED PERSONS ARE INVITED TO ATTEND AND BE HEARD
REGARDING THE PUBLIC HEARING.
The proposal and cost estimate breakdown may be inspected by the public at
Okaloosa County Water & Sewer, 1804 Lewis Turner Blvd., 3rd floor, Engineering Office,
850-651-7504.
If any person decides to appeal any decision made with respect to any matter
considered at these hearings, such person will need a record of the proceeding and may
need to ensure that a verbatim record of the proceeding is made which record includes
the testimony and evidence upon which the appeal is to be based.
Okaloosa County adheres to the American Disabilities Act and will make
reasonable modifications for access to these hearings upon request. Requests may be
made to the Water & Sewer offices described above and must be made at least 48
hours in advance of the hearings in order to provide the requested service.
Board of County Commissioners
Okaloosa County, Florida
By: Don. W. Howard
Clerk of Circuit Court
4/9/2014
Preliminary Cost Estimate
OCWS East County Force Main (From College Blvd./SR-85 to Eglin Repump Station
Line No. Line Item Quantity Unit Unit Price Total
1 20" PVC C-905 DR18 28,805 LF $ 30.00 $ 864,150.00
2 24" HDPE DR-11 Directional Bores (Gator Boring) 6,474 LF $ 201.60 $ 1,305,158.40
3 24"/20" bore transition fittings (Gator Boring) 9 pair $ 3,600.00 $ 32,400.00
4 36" Jack and Bore with Carrier Pipe (Gator Boring) 140 LF $ 350.00 $ 49,000.00
5 20" plug valves w/ box & megalug kit 16 EA $ 8,000.00 $ 128,000.00
6 air release/vacuum valve w/ MH, GV, valve box 23 EA $ 4,500.00 $ 103,500.00
7 20" Megalug Kits 116 EA $ 200.00 $ 23,200.00
8 Tapping saddle and appurtenances for testing/filling 30 EA $ 300.00 $ 9,000.00
9 DI Fittings 1 LS $ 20,000.00 $ 20,000.00
10 14" Line Stops (EA Tapping Services) 2 EA $ 6,000.00 $ 12,000.00
11 Seeding & Mulching 20 AC $ 200.00 $ 4,000.00
12 Erosion Control: Silt Fence 3,000 LF $ 0.19 $ 570.00
13 Concrete Flume/Sidewalk Replacement 1,100 SF $ 3.00 $ 3,300.00
14 Marker Posts 40 EA $ 14.87 $ 594.80
15 OCWS in-house labor (500 LF/day) 58 days $ 3,000.00 $ 174,000.00
16 OCWS in-house equipment (500 LF/day) 58 days $ 1,000.00 $ 58,000.00
TOTAL GATOR BORING (Contract C14-2094-WS) $ 1,386,558.40
TOTAL EA TAPPING SERVICES (Contract C14-2128-WS) $ 12,000.00
TOTAL OCWS MATERIALS $ 1,156,314.80
TOTAL OCWS LABOR + EQUIP $ 232,000.00
SUBTOTAL CONSTRUCTION (Includes Contracted Services) $ 2,786,873.20
18 15% contingency on materials $ 173,447.22
19 15% admin/overhead fee on labor/mat'l (not equip or contracted) $ 199,547.22
TOTAL CONSTRUCTION $ 3,159,867.64
Okaloosa County Water & Sewer
East County RePump Project- Contract Estimates
Contract 1 Contract 2 Contract 3 Contract 4 Contract 5
Pre-
Engineered
Building Pumps Generator MCC/Controls Site Work Piping OCWS
Material $
Cost $ 96,000.00 130,000.00 $328,000.00 $13,797.44 $196,680.00
Labor Cost $ 87,400.00
Contract
Cost $ 157,567.06
CONTRACT 1 COST (Pre-Engineered
Building) $157,567.06
CONTRACT 2 COST (3- 100hp Centrifugal Pumps) $ 96,000.00
CONTRACT 3 COST (550 kW Generator) $130,000.00
CONTRACT 4 COST (Motor Control & Control Panel) $328,000.00
CONTRACT 5 COST (OCWS Labor, Site Work & Mech
Piping) $297,877.44
TOTAL COMBINED CONTRACTS COST $ 1,009,444.50