hazard protective devices to prevent exposure of workers and/or equipment to
electric shock hazards.
c. The CONTRACTOR shall verify that there is sufficient electric shock hazard
protection for the workers and equipment prior to and throughout each
working period on the job.
d. The verification of the electric shock hazard protection is the sole
responsibility of the CONTRACTOR and shall be accomplished without
supervision from the OWNER, ENGINEER, or other direct or indirect agents
of the OWNER.
3.3 CONTAINMENT SYSTEM
A. The CONTRACTOR shall design and provide a containment system for the capture,
containment, collection, storage and disposal of the waste materials generated by the
work under this specification Section, to meet the requirements of SSPC Guide 6, Class
3 and this specification.
B. The Containment Enclosure shall be at minimum as follows:
Repair & Paint 009870 - 13
Countryview & Bluewater Tanks (2014) Job No. 41-459
Packet Pg. 266
1. A retractable enclosure to completely surround (around and under) the blasting,
priming and coating operations. The ground cannot be used as the bottom of the
enclosure unless completely covered with suitable containment material that
retains 100% of the residue.
2. Constructed of flexible materials such as containment screens (specifically
designed for this purpose). The floor may be containment screening or of rigid
materials such as overlapping plywood fastened in place.
3. Maintained free of tears, cuts or holes.
4. Have seams overlapped a minimum of 6" and fastened together at 12" centers or
fastened and overlapped in a manner that insures a tight seal which does not allow
openings between the screens in the containment.
5. With sides extending past the top of and enclose the roof of the tank.
6. With a top bonnet capable of containing dust, debris and coating materials being
removed.
7. Retractable or moveable in a carousel fashion such that:
a. Lowering shall require no more than 10 minutes
b. Raising shall require no more than 15 minutes.
C. It is the CONTRACTOR’S responsibility to insure the feasibility and workability of the
containment system.
D. The CONTRACTOR shall ensure that no cleaning/blasting debris, overspray or
coating droplets escape to the atmosphere. The ground surrounding the tank shall be
protected from all debris and other materials generated in the cleaning operations.
E. The CONTRACTOR shall be responsible for all materials that are used and for any
apparatus used to contain debris, overspray, and coating droplets.
F. The CONTRACTOR shall perform his operations and work schedule in a manner as to
minimize leakage of the containment system. The containment system shall be
properly maintained and shall not deviate from the approved drawings, without the
ENGINEER’S approval.
G. If at any time during the execution of the work, the containment system fails to
function satisfactorily, the OWNER reserves the right to stop work and the
CONTRACTOR suspend all operations, except those required to minimize adverse
impact on the environment or property. Operations shall not resume until
modifications have been made to correct the cause of failure. Modifications shall be
approved by the ENGINEER. The OWNER further reserves the right to stop work or
to require additional or different enclosure methods, if the CONTRACTOR’S
operations create a nuisance beyond the tank site property line in the sole opinion of the
OWNER, the ENGINEER, the OWNER’S designated representative, any regulatory
agency, or neighbor.
Repair & Paint 009870 - 14
Countryview & Bluewater Tanks (2014) Job No. 41-459
Packet Pg. 267
H. The containment system and all accompanying support brackets and rigging shall be
designed by a professional engineer and appropriately signed and sealed per applicable
rules and regulations. A professional engineer registered in the State of Florida shall
provide a statement that the containment system will not exceed the structural loading
capacity of the tank when fully erect.
I. The containment system utilized on the tank shall be designed not to impose excessive
loading on the tank, tower and tank appurtenances. Any damage done to the tank or
tower as a direct or indirect result of the enclosure system shall be repaired by the
CONTRACTOR at no additional cost to the OWNER. Neither the ENGINEER nor the
OWNER assume any responsibility for the structural ability of the tank and tower to
support the enclosure system.
J. All equipment shall be parked on ground covers free of cuts, tears or holes to prevent
contamination of pavement or soil and to protect area under and around equipment.
K. If tarps are used as part of the enclosure, the tarps shall be an impervious, solid, flame-
resistant material, reinforced with a fiber mesh and shall allow as much light as
possible to pass through the material.
L. The existing paint being removed from the tank may contain lead and chromium. The
CONTRACTOR shall bear all responsibility to assure that workers take proper safety
precautions when working in a lead and chromium abatement environment.
M. Dust Collectors - Air Filtration Units:
1. Furnish and use a dust collector(s) during all blasting work.
2. Units to be equal in filtration capacity to Eagle Industries dust collectors. Other
units may be approved as equal, but their substitution will be evaluated on
efficiency at 0.5 micron size and airflow movement.
3. Unit shall be 40,000 cfm minimum.
4. Furnish HEPA filters for dust collection.
5. Number of dust collectors shall be sufficient to supply a 50 ft/minute downward
draft at most areas. An average may be considered. Determination of actual
containment plan will be the deciding factor. Calculations of airflow shall be
included in the containment submittal.
6. CONTRACTOR shall use only new filters or filters that are certified clean.
N. All costs of providing the containment system (including air filtration) shall be
included by the CONTRACTOR in the Base Bid.
3.5 REPAIRING THE TANKS
Repair & Paint 009870 - 15
Countryview & Bluewater Tanks (2014) Job No. 41-459
Packet Pg. 268
A. Grout Repair
1. The grout which is between the base plates and the concrete foundations shall be
tested by the CONTRACTOR under the observation of the ENGINEER by using a
sharp 16 oz. hammer.
2. Any missing or loosened portions of grout shall be replaced with a non-shrinking,
non-staining, high-strength structural grout material.
3. The final contour of the grout shall be vertical and flush with the edge of the base
plates, and shall not overlap outside the edge of the base plates.
4. After the grout has hardened sufficiently for the application of a curing compound,
a water-based curing compound shall be applied to the exposed grout surfaces.
5. After cleaning and painting, any separation between the base plates and the grout
greater than 1/32" and less than 5/32" shall be filled with elastomeric sealant.
B. Welding Repairs
1. All welding repairs to the interior or exterior of the tank are to be made prior
to all painting operations.
2. No welding or flame cutting through the existing coating system shall be
permitted, unless adequate worker protection is provided in accordance with the
instructions in ANSI Z49.1, "Safety in Welding and Cutting."
3. Any resulting burrs, weld spatter, sharp edges, corners, or rough welds which
would cause difficulty in applying a holiday-free coating shall be ground smooth.
This grinding is considered incidental to the welding work and is to be included in
the Base Bid.
4. After grinding, these areas shall be cleaned to produce the profile recommended by
the manufacturer of the coating system.
5. Cleaning Areas To Be Welded
a. It shall be necessary to remove the coating prior to the welding of any new
items to the tank.
b. All areas that have been welded and/or ground smooth shall be cleaned prior
to painting to provide proper profile for the coating system.
c. Areas to be welded shall be welded prior to the final cleaning and painting of
surfaces within the heat-affected zone. The heat-affected zone includes the
opposite side of the plate or member being welded. Even if not specifically
Repair & Paint 009870 - 16
Countryview & Bluewater Tanks (2014) Job No. 41-459
Packet Pg. 269
mentioned as a part of the Work under this Agreement, those areas of paint or
coatings in the heat-affected zone of areas not specified to be painted shall be
cleaned and painted in accordance with the requirements listed in these
Detailed Technical Specifications.
C. Pit Filling
1. After an area of steel is abrasive blast cleaned, any pits, rough areas or seams
marked for pit filling or surfacing by the ENGINEER shall be filled with
solventless polyamide epoxy seam sealer of the type recommended by the supplier
of the interior paint system. The epoxy seam sealer shall be applied neatly and
smoothly to the steel surfaces and any rough areas of the seam sealer shall be
sanded smooth prior to the application of the coating system.
2. The CONTRACTOR shall include in his base bid two gallons of pit filler.
D. Seam/Seal Welding
1. All areas of apparent seam deterioration shall be abrasive blast cleaned, and any
seam corrosion or undercut marked by the Engineer shall be repaired by arc-
gouging and welding.
2. The number of linear feet of seam welding shall be paid for by the unit price as
listed in the