to the ENGINEER for approval prior to the start of any cleaning operations.
2.2 COATINGS
A. All coatings for the job shall be obtained from a single approved coatings
manufacturer. Products proposed for use, other than those specified, must be
submitted in writing at least 10 days before the bid date. Proposal shall include
product data sheets, MSDS sheets, performance criteria as listed in Section 3.12 of
these specifications as well as a list of a minimum of 15 tanks (including location,
Engineer’s name and phone number, Owner name and phone number) which have
utilized the proposed coating system. References shall have rendered satisfactory
service for at least 5 years. It is incumbent upon the proposer to prove that the
materials submitted meet the generic type as well as the performance requirements
established in these specifications.
B. Coatings shall be manufactured by the following approved manufacturer:
Tnemec Company Incorporated
C. Thinners shall be as recommended by the approved coating manufacturer.
D. All materials shall be furnished new and delivered to the project site in the original
factory sealed containers which are clearly and properly labeled by the coating
manufacturer showing the manufacturer’s name, product number, type of coating,
batch number and expiration date.
E. The materials shall be stored, handled and used in accordance with all manufacturers’
published product data, including all requirements listed on the Material Safety Data
Sheets (MSDS).
F. Coating Systems
1. Except as modified herein, all coating systems shall comply with the following:
a. AWWA D102-06 Outside Coating System No. 4 (OCS-4-modified): Generic
Description - A four-coat system comprised of a zinc-rich primer, one
polyamidoamine epoxy and one aliphatic urethane intermediate coat, and a
fluoro-urethane finish coat. All replacement parts (ladders, hatches, etc.) shall
have a five-coat system with the addition of a shop-applied zinc-rich primer to
the above described system.
b. AWWA D102-11 Inside Coating System No. 3 (ICS-3, Modified): Generic
Description - A two coat system consisting of an organic zinc-rich primer,
with a 100% solids, fast setting, epoxy lining. Replacement ladder shall have
Repair & Paint 009870 - 9
Countryview & Bluewater Tanks (2014) Job No. 41-459
Packet Pg. 262
a three coat system with the addition of a shop-applied zinc-rich primer to the
above described system.
c. All coatings and coating systems in contact with potable water shall comply
with ANSI/NSF, International Standard 61.
d. Table 1 in the Appendix has been included to summarize the coatings. This
quick reference is included for the contractor’s convenience, but is not
intended to supersede the technical specifications.
2.3 ELASTOMERIC SEALANT
A. Elastomeric Sealant shall be an NSF approved, one part polyurethane sealant. Product
shall be SIKAFLEX-1 as manufactured by SIKA Corporation.
2.4 SEAM SEALER & SURFACER
A. Seam sealer and surfacer shall be an NSF 61 approved solventless epoxy seam sealer
and shall be Tnemec 215 Surfacer. The seam sealer and surfacer shall be
recommended by the manufacturer of the interior paint system.
2.5 DEGREASING AGENT
A. A degreasing agent such as Great Lakes Extra Muscle Pre-Paint Cleaner or approved
equal shall be used for the pre-inspection washouts as required, if applicable to project.
2.6 MATERIAL SAFETY DATA SHEETS (MSDS)
A. An MSDS shall be posted at the job site for each chemical product on the job site
including, but not limited to, coatings, thinners, solvents, disinfecting agents, abrasives,
welding materials, and flexible sealant material.
B. An MSDS for each chemical product on the job site shall also be submitted to the
ENGINEER prior to starting any work.
PART 3 - REPAIRING AND REPAINTING THE TANK
3.1 PRELIMINARIES
A. The CONTRACTOR shall notify the OWNER and the ENGINEER at least seven (7)
days before starting the Work at the site. The CONTRACTOR shall reconfirm the
commencement of Work with the OWNER and ENGINEER twenty-four (24) hours
prior to starting Work at the site.
B. The tank shall be drained during all cleaning, painting and curing of the coatings.
Repair & Paint 009870 - 10
Countryview & Bluewater Tanks (2014) Job No. 41-459
Packet Pg. 263
C. All operations which would include closing valves, or starting, stopping, or removal
from service any equipment shall be done by the OWNER'S personnel upon request by
the CONTRACTOR.
D. The CONTRACTOR shall provide a representative who shall contact and distribute
notices to the surrounding properties in the vicinity of the project site. The purpose of
this notification procedure is to inform the neighbors and businesses of the ensuing
cleaning and painting operations and to establish a good working relationship with the
surrounding property owners and occupants whose property may be affected by the
cleaning and painting operations of the CONTRACTOR
E. Protection of Equipment and Cabinets
1. All electrical apparatus, telemetering and other equipment in or on the tank,
including all wiring, shall be protected from all damage and dust or other
deleterious material infiltration during the operations of the CONTRACTOR.
2. Any antennas on the roof of the tank shall also be protected from damage. The
operation of the equipment shall be continued during the repair, cleaning and
painting operations.
3. Any items damaged by the operations of the CONTRACTOR shall be replaced in
kind or acceptably repaired by the CONTRACTOR at no cost to the OWNER.
4. Before cleaning on any portion of the tank, all cabinets on the site shall be covered
to prevent the entry of blasting abrasive, dust or paint and so they can continue to
function as required.
5. Any cabinets which cannot be covered will be marked by the OWNER. The
covering shall be removed from the cabinets while the cabinets are cleaned,
painted, and the coating cures in accordance with the exterior painting section of
these specifications.
6. Any blasting, cleaning or paint debris inside these cabinets shall be removed by the
CONTRACTOR prior to completion of the Work.
F. Nameplates
1. The nameplates shall be carefully removed to prevent paint coverage. The
areas behind the nameplates shall be cleaned and painted in accordance with
section 3.05 of this specification.
Repair & Paint 009870 - 11
Countryview & Bluewater Tanks (2014) Job No. 41-459
Packet Pg. 264
2. The nameplates shall be protected from the application of paint on the exposed
surface.
3. Any paint on the nameplate shall be removed by solvent cleaning or other methods
which will not damage the surface of the nameplate.
4. The nameplates shall be bolted back on the mounting brackets with stainless steel
stove bolts and nuts.
G. Conduit and Cables
1. Cables, conduit, and conduit clamps shall be relocated as necessary to effect
proper surface preparation and coating.
2. The cables, conduit, and conduit clamps along or near ladders shall be repositioned
prior to the cleaning and painting being sure to provide a minimum clear spacing
of 3" between the cables or conduit and the ladder side rails so as not to interfere
with the climber.
H. Interior Rigging Openings
1. Suitable threaded outlets shall be installed in the roof of the tank for the attachment
of paint rigging.
2. The threaded outlets shall be a Phoenix #132 heavy tank flange. The flanges shall
be welded on both the inside and outside of the tank with a continuous fillet weld.
3. Galvanized malleable iron pipe plugs shall be furnished and installed after the
completion of the painting. The threads on the plugs shall be covered with Teflon
tape prior to threading into the couplings.
4. The couplings shall be installed in sufficient number and placement so as to allow
complete and proper cleaning and painting of the shell and roof surfaces of the
tank.
I. Inter-coat Cleaning
1. Residue or foreign matter on applied coatings to receive subsequent coats shall be
cleaned by pressure rinse.
2. Determination of the need for inter-coat cleaning shall be made by the ENGINEER
and OWNER. Inter-coat cleanliness shall be determined by wiping with clean
white rags, determination of pH, chlorides or other suitable test, depending on
circumstances. Pressure cleaning when required between coats of coating material
are the CONTRACTOR’S responsibility.
Repair & Paint 009870 - 12
Countryview & Bluewater Tanks (2014) Job No. 41-459
Packet Pg. 265
3.2 ELECTRICAL SYSTEM SAFETY
A. The CONTRACTOR shall at a minimum take the following safety measures to prevent
accidents due to electrical hazards:
1. Electric Service Deactivation:
a. The OWNER shall deactivate and lock out the electric service to the tank.
b. The CONTRACTOR shall verify the deactivated status of the electric service
to the tank prior to beginning each day's Work functions and throughout the
work day.
c. The verification of the electric service deactivation is the sole responsibility of
the CONTRACTOR and shall be accomplished without supervision from the
OWNER, ENGINEER, or other direct or indirect agents of the OWNER.
2. Electric Service Wiring
a. The CONTRACTOR shall be aware of the electric service wiring attached to
and located adjacent to the tank.
b. The OWNER shall relocate, deactivate, or provide necessary electric shock