READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — March 4, 2014 — reading text

Part 44 of 71. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 01-Agenda Packet.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

the Resource Conservation and Recovery Act (RCRA) or local and state regulations, to determine proper treatment and/or disposal requirements. b. All testing required by regulations or by the selected waste hauler or landfill, including any follow-up testing and the collection of the samples, shall be done at the Contractor’s expense. c. The number of samples from each container will be determined by the degree of variation of the results of the four (4) initial samples. d. Copies of all manifests, testing results and treatment procedure documents shall be sent to the Engineer and Owner. e. Should the results of the random testing of the contents of a container determine that the removed paint material does not constitute a hazardous material, the material shall be legally disposed of by the Contractor in accordance with local, state and federal laws. f. The Contractor shall be responsible for removing and properly transporting all the material from the project site. The material shall be transported in containers approved by the USEPA and local, state and federal regulations. g. The contract Base Bid shall include the cost of the transporting of the removed paint material to a non-hazardous waste landfill or other stipulated landfill and any disposal costs at that facility. Repair & Paint 009870 - 5 Countryview & Bluewater Tanks (2014) Job No. 41-459 Packet Pg. 258 h. Should the results of the random testing of the contents of a container determine that the removed paint material does in fact constitute a hazardous material, the material must either be: 1) treated by an approved method to reduce the leachable concentration levels to below the regulatory limits and disposed of in accordance with all local and/or state regulations; or 2) recycled and used as a raw material in a product approved by the appropriate regulatory agencies; and disposed of in a hazardous waste landfill. Disposal, treatment or recycling of the material shall be in strict accordance with the federal, state and local laws including, but not limited to RCRA, Toxic Substance Control Act (TSCA), Hazardous Materials Transportation Act (HMTA), USEPA and Florida Department of Environmental Protection (FDEP) regulations. i. All costs associated with the recycling, or treatment or disposal in an approved recycling or hazardous waste facility shall be paid for by the Owner. The hauler shall obtain the necessary insurance and the necessary permits for transportation and shall provide evidence of such to the Engineer and Owner. j. If the sample material obtained and tested as described above is determined to be a hazardous material according to the TCLP testing or subsequent testing required by RCRA, the Contractor shall delete the standard disposal for the removed paint residue from the Base Bid. 1) Included under this item is the furnishing of all materials, equipment, tools, utilities, labor, and supervision necessary for the completion of the work contained in this item in accordance with the drawings and specifications. The item generally includes the recycling, or treatment and transporting and deposition of all hazardous removed paint material in an approved recycling facility or disposal site, including obtaining all the necessary insurance and the necessary permits for transportation and providing evidence of such to the Engineer and Owner. 2) Transportation: a) All material classified as hazardous, as determined by the aforementioned TCLP Testing or subsequent testing required by RCRA, shall be transported to an approved recycling facility or hazardous waste landfill. b) The hauler shall obtain the necessary insurance and the necessary permits for transportation and shall provide evidence of such to the additional insureds listed elsewhere in this Specification. c) The transporter shall submit copies of his/her "Spill Contingency Plan" to the Engineer and Owner prior to transporting any Repair & Paint 009870 - 6 Countryview & Bluewater Tanks (2014) Job No. 41-459 Packet Pg. 259 material from the site. The "Spill Contingency Plan" shall detail how spills or leaks which occur during transport shall be dealt with. d) The hauler shall have or shall obtain an identification number from the USEPA, the Florida Department of Environmental Protection (FDEP) and all other applicable state and local licenses and permits. e) All containers and the labeling of the containers shall adhere to the U.S. Department of Transportation's regulations (49 CFR Part 172) and the HMTA. G. Disposal of Material: 1. All material classified as hazardous, as determined by the aforementioned TCLP testing or subsequent testing required by RCRA, shall be transported to: a. An approved recycling facility, or b. An approved treatment facility to reduce the leachable concentration levels to below the allowable regulatory limits and disposed in a local and/or state approved waste landfill. 2. All transporting, recycling, treatment, and disposal shall be in strict accordance with federal and state laws including but not limited to RCRA, TSCA, HMTA, the USEPA and the FDEP regulations. a. The name of the recycling, treatment and/or disposal facility shall be submitted to the Engineer and Owner for approval prior to removing any material from the project site. b. The disposal or recycling facility shall have or shall obtain an identification number from the USEPA, the Florida Department of Environmental Protection (FDEP) and all other applicable state and local licenses and permits. c. The Contractor shall be responsible for obtaining the proper signatures of the hauler and designated receiving facility on the "manifest" form. d. Payment will not be released for this item until this documentation has been received by the Owner. 3. Payment : a. All costs associated with the transporting, recycling of the material or treatment, and disposal of the material in an approved hazardous waste facility shall be paid for by the Owner. The Contractor shall still keep the exterior and interior removed paint debris separate from each other and shall store the debris in separate leak-proof covered containers. b. Within 20 days of the Owner contacting the Contractor, the Owner shall furnish and deliver to the site containers for transporting the hazardous material. Repair & Paint 009870 - 7 Countryview & Bluewater Tanks (2014) Job No. 41-459 Packet Pg. 260 4. The Contractor shall then fill the containers with the hazardous material. 5. The Owner shall then be responsible for the transporting and recycling of the material or treatment and/or disposal of the material in an approved hazardous waste facility. 1.9 HOURS OF OPERATION No repairing, cleaning or painting is to be done in the night period between sunset and sunrise. Further, blasting operations or any other operation that requires power equipment shall be limited to 8 AM - 6 PM (local time) on Saturday and 9 AM - 6 PM (local time) on Sunday. The times for Work shall also comply with local, state, and federal regulations and laws regarding working hours, overtime, etc. County ordinances shall be adhered to regarding noise and interference to surrounding property owners. If temperatures and weather conditions warrant nighttime work, a written request to the OWNER and ENGINEER shall be approved prior to any work being initiated. 1.10 EMERGENCY INFORMATION A. The CONTRACTOR shall post information concerning emergency medical, fire, rescue and hazardous waste phone numbers from which personnel on the site can obtain information if needed. B. The emergency information shall be posted a central position, located so it is visible and accessible twenty-four (24) hours a day for the entire length of time that the CONTRACTOR is performing Work at the tank site. PART 2 - PRODUCTS 2.1 BLAST ABRASIVE A. General 1. All of the abrasives shall be steel grit (size 50-80). 2. The abrasive shall be properly stored, and it shall be free from contaminant, including but not limited to paint, dirt, moisture, oil, or chlorides, which can cause premature failure of the coating. 3. Use of abrasive on the exterior of the tank shall be based not only on its compliance with the technical application of the coatings, but also on its lack of nuisance to surrounding property. 4. The CONTRACTOR shall submit manufacturer's published product data sheets Repair & Paint 009870 - 8 Countryview & Bluewater Tanks (2014) Job No. 41-459 Packet Pg. 261 for the type of abrasive, grade, and the resulting profile of the abrasive to be used

Download this text file with its original spacing ↓