READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — March 4, 2014 — reading text

Part 19 of 71. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 01-Agenda Packet.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Completion of all the Work. associate or consultant with respect to the Project and who is identified as such in the Supplementary Conditions. 32. PCBs--Polychlorinated biphenyls. 21. Field Order--A written order issued by 33. Petroleum--Petroleum, including crude oil or ENGINEER which requires minor changes in the Work but any fraction thereof which is liquid at standard conditions which does not involve a change in the Contract Price or of temperature and pressure (60 degrees Fahrenheit and the Contract Times. 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, 22. General Requirements--Sections of Division kerosene, and oil mixed with other non-Hazardous Waste 1 of the Specifications. The General Requirements pertain and crude oils. to all sections of the Specifications. 34. Project--The total construction of which the 23. Hazardous Environmental Condition--The Work to be performed under the Contract Documents may presence at the Site of Asbestos, PCBs, Petroleum, be the whole, or a part as may be indicated elsewhere in the Hazardous Waste, or Radioactive Material in such Contract Documents. quantities or circumstances that may present a substantial danger to persons or property exposed thereto in connection 35. Project Manual--The bound documentary with the Work. information prepared for bidding and constructing the Work. A listing of the contents of the Project Manual, 24. Hazardous Waste--The term Hazardous which may be bound in one or more volumes, is contained Waste shall have the meaning provided in Section 1004 of in the table(s) of contents. the Solid Waste Disposal Act (42 USC Section 6903) as amended from time to time. 36. Radioactive Material--Source, special nuclear, or byproduct material as defined by the Atomic 25. Laws and Regulations; Laws or Regulations-- Energy Act of 1954 (42 USC Section 2011 et seq.) as Any and all applicable laws, rules, regulations, ordinances, amended from time to time. codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 37. Resident Project Representative--The authorized representative of ENGINEER who may be 26. Liens--Charges, security interests, or assigned to the Site or any part thereof. encumbrances upon Project funds, real property, or personal property. 38. Samples--Physical examples of materials, equipment, or workmanship that are representative of some 27. Milestone--A principal event specified in the portion of the Work and which establish the standards by Contract Documents relating to an intermediate completion which such portion of the Work will be judged. date or time prior to Substantial Completion of all the Work. 39. Shop Drawings--All drawings, diagrams, illustrations, schedules, and other data or information which 28. Notice of Award--The written notice by are specifically prepared or assembled by or for CON- OWNER to the apparent successful bidder stating that upon TRACTOR and submitted by CONTRACTOR to illustrate timely compliance by the apparent successful bidder with some portion of the Work. the conditions precedent listed therein, OWNER will sign and deliver the Agreement. 40. Site--Lands or areas indicated in the Contract Documents as being furnished by OWNER upon which the 29. Notice to Proceed--A written notice given by Work is to be performed, including rights-of-way and OWNER to CONTRACTOR fixing the date on which the easements for access thereto, and such other lands General Conditions Page 00700-7 Packet Pg. 190 furnished by OWNER which are designated for the use of by ENGINEER ordering an addition, deletion, or revision CONTRACTOR. in the Work, or responding to differing or unforeseen subsurface or physical conditions under which the Work is 41. Specifications--That part of the Contract to be performed or to emergencies. A Work Change Documents consisting of written technical descriptions of Directive will not change the Contract Price or the Contract materials, equipment, systems, standards, and workmanship Times but is evidence that the parties expect that the change as applied to the Work and certain administrative details ordered or documented by a Work Change Directive will applicable thereto. be incorporated in a subsequently issued Change Order following negotiations by the parties as to its effect, if any, 42. Subcontractor--An individual or entity on the Contract Price or Contract Times. having a direct contract with CONTRACTOR or with any other Subcontractor for the performance of a part of the 50. Written Amendment--A written statement Work at the Site. modifying the Contract Documents, signed by OWNER and CONTRACTOR on or after the Effective Date of the 43. Substantial Completion--The time at which Agreement and normally dealing with the nonengineering the Work (or a specified part thereof) has progressed to the or nontechnical rather than strictly construction-related point where, in the opinion of ENGINEER, the Work (or a aspects of the Contract Documents. specified part thereof) is sufficiently complete, in accordance with the Contract Documents, so that the Work 1.02 Terminology (or a specified part thereof) can be utilized for the purposes for which it is intended. The terms “substantially A. Intent of Certain Terms or Adjectives complete” and “substantially completed” as applied to all or part of the Work refer to Substantial Completion thereof. 1. Whenever in the Contract Documents the terms “as allowed,” “as approved,” or terms of like 44. Supplementary Conditions--That part of the effect or import are used, or the adjectives “reasonable,” Contract Documents which amends or supplements these “suitable,” “acceptable,” “proper,” “satisfactory,” or General Conditions. adjectives of like effect or import are used to describe an action or determination of ENGINEER as to the 45. Supplier--A manufacturer, fabricator, suppli- Work, it is intended that such action or determination er, distributor, materialman, or vendor having a direct will be solely to evaluate, in general, the completed contract with CONTRACTOR or with any Subcontractor Work for compliance with the requirements of and to furnish materials or equipment to be incorporated in the information in the Contract Documents and Work by CONTRACTOR or any Subcontractor. conformance with the design concept of the completed Project as a functioning whole as shown or indicated in 46. Underground Facilities--All underground the Contract Documents (unless there is a specific pipelines, conduits, ducts, cables, wires, manholes, vaults, statement indicating otherwise). The use of any such tanks, tunnels, or other such facilities or attachments, and term or adjective shall not be effective to assign to any encasements containing such facilities, including those ENGINEER any duty or authority to supervise or direct that convey electricity, gases, steam, liquid petroleum the performance of the Work or any duty or authority products, telephone or other communications, cable to undertake responsibility contrary to the provisions of television, water, wastewater, storm water, other liquids or paragraph 9.10 or any other provision of the Contract chemicals, or traffic or other control systems. Documents. 47. Unit Price Work--Work to be paid for on the B. Day basis of unit prices. 1. The word “day” shall constitute a 48. Work--The entire completed construction or calendar day of 24 hours measured from midnight to the various separately identifiable parts thereof required to the next midnight. be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, C. Defective services, and documentation necessary to produce such construction, and furnishing, installing, and incorporating 1. The word “defective,” when modifying all materials and equipment into such construction, all as the word “Work,” refers to Work that is required by the Contract Documents. unsatisfactory, faulty, or deficient in that it does not conform to the Contract Documents or does not 49. Work Change Directive--A written statement meet the requirements of any inspection, reference to CONTRACTOR issued on or after the Effective Date of standard, test, or approval referred to in the Contract the Agreement and signed by OWNER and recommended Documents, or has been damaged prior to General Conditions Page 00700-8 Packet Pg. 191 ENGINEER’s recommendation of final payment 2.03 Commencement of Contract Times; Notice to (unless responsibility for the protection thereof has Proceed been assumed by OWNER at Substantial Completion in accordance with paragraph 14.04 or A. The Contract Times will commence to run on the 14.05). thirtieth day after the Effective Date of the Agreement or, if a Notice to Proceed is given, on the day indicated in the D. Furnish, Install, Perform, Provide

Download this text file with its original spacing ↓