READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — March 4, 2014 — reading text
Part 16 of 71. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
period commences when the procurement document is
received and terminates when the Board of County Commissioners approves an award.
Each Bidder shall review and sign the enclosed form indicating that the Bidder agrees to
abide by the County’s “No Contact Clause” and understands that a violation of this
policy shall result in disqualification of their bid.
Note: (For Bidder’s convenience, this No Contact Clause Form is enclosed as Attachment
“F” with Section 00300 “Bid Proposal” and is made a part of the Bid Package.)
ARTICLE 30 - PROTECTION OF RESIDENT WORKERS
29.1 The Okaloosa County Board of County Commissioners actively supports the Immigration &
Nationality Act (INA) which includes provisions addressing employment eligibility,
employment verification, and nondiscrimination. Under the INA, employers may hire only
persons who may legally work in the United States, (i.e., citizens and nationals of the U.S.)
and aliens authorized to work in the U. S. the employer must verify the identity and
employment eligibility of anyone to be hired, which includes completing the Employment
Eligibility Verification. The contractor shall establish appropriate procedures and controls
so no services or products under the contract documents will be performed or manufactured
by any worker who is not legally eligible to perform such services or employment.
Okaloosa County reserves the right to request documentation showing compliance with the
requirement.
Note: (For Bidder’s convenience, this Protection of Resident Workers form is enclosed as
Attachment “G” with Section 00300 “Bid Proposal” and is made a part of the Bid
Package.)
END OF SECTION 00100.
Repair & Paint
Countryview & Bluewater Tanks 00100-14 Job No. 41-459
Packet Pg. 146
Packet Pg. 147
Packet Pg. 148
Packet Pg. 149
Packet Pg. 150
Packet Pg. 151
Packet Pg. 152
Packet Pg. 153
Packet Pg. 154
Packet Pg. 155
Packet Pg. 156
Packet Pg. 157
Packet Pg. 158
Packet Pg. 159
Packet Pg. 160
Packet Pg. 161
Packet Pg. 162
Packet Pg. 163
Packet Pg. 164
Packet Pg. 165
Packet Pg. 166
Packet Pg. 167
Packet Pg. 168
Packet Pg. 169
Packet Pg. 170
Packet Pg. 171
Packet Pg. 172
Packet Pg. 173
Packet Pg. 174
Packet Pg. 175
Packet Pg. 176
Packet Pg. 177
Packet Pg. 178
Packet Pg. 179
Packet Pg. 180
Packet Pg. 181
Packet Pg. 182
Packet Pg. 183
This document has important legal consequences; consultation with an attorney is encouraged with respect to its use or
modification. This document should be adapted to the particular circumstances of the contemplated Project and the
Controlling Law.
STANDARD
GENERAL CONDITIONS
OF THE
CONSTRUCTION CONTRACT
Prepared by
ENGINEERS JOINT CONTRACT DOCUMENTS COMMITTEE
and
Issued and Published Jointly By
PROFESSIONAL ENGINEERS IN PRIVATE PRACTICE
a practice division of the
NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS
AMERICAN CONSULTING ENGINEERS COUNCIL
AMERICAN SOCIETY OF CIVIL ENGINEERS
This document has been approved and endorsed by
The Associated General Contractors of America
Construction Specifications Institute
These General Conditions have been prepared for use with the Owner-Contractor Agreements (No. 1910-8-A-1 or 1910-8-
A-2) (1996 Editions). Their provisions are interrelated and a change in one may necessitate a change in the other.
Comments concerning their usage are contained in the EJCDC User’s Guide (No. 1910-50). For guidance in the
preparation of Supplementary Conditions, see Guide to the Preparation of Supplementary Conditions (No. 1910-17) (1996
Edition).
EJCDC No. 1910-8 (1996 Edition)
General Conditions Page 00700-1
Packet Pg. 184
Copyright ©1996
National Society of Professional Engineers
1420 King Street, Alexandria, VA 22314
American Consulting Engineers Council
1015 15th Street N.W., Washington, DC 20005
American Society of Civil Engineers
345 East 47th Street, New York, NY 10017
General Conditions Page 00700-2
Packet Pg. 185
TABLE OF CONTENTS
Page
ARTICLE 1 - DEFINITIONS AND TERMINOLOGY................................................................................................................6
1.01 Defined Terms ...................................................................................................................................................6
1.02 Terminology.......................................................................................................................................................8
ARTICLE 2 - PRELIMINARY MATTERS ..................................................................................................................................9
2.01 Delivery of Bonds ..............................................................................................................................................9
2.02 Copies of Documents.........................................................................................................................................9
2.03 Commencement of Contract Times; Notice to Proceed ...................................................................................9
2.04 Starting the Work ..............................................................................................................................................9
2.05 Before Starting Construction ............................................................................................................................9
2.06 Preconstruction Conference .............................................................................................................................10
2.07 Initial Acceptance of Schedules ........................................................................................................................10
ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE .........................................................................10
3.01 Intent..................................................................................................................................................................10
3.02 Reference Standards..........................................................................................................................................10
3.03 Reporting and Resolving Discrepancies...........................................................................................................11
3.04 Amending and Supplementing Contract Documents........................................................................................11
3.05 Reuse of Documents ..........................................................................................................................................11
ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE
POINTS .....................................................................................................................................................................11
4.01 Availability of Lands .........................................................................................................................................11
4.02 Subsurface and Physical Conditions ................................................................................................................12
4.03 Differing Subsurface or Physical Conditions...................................................................................................12
4.04 Underground Facilities.....................................................................................................................................13
4.05 Reference Points................................................................................................................................................14
4.06 Hazardous Environmental Condition at Site....................................................................................................14
ARTICLE 5 - BONDS AND INSURANCE ..................................................................................................................................15
5.01 Performance, Payment, and Other Bonds........................................................................................................15
5.02 Licensed Sureties and Insurers .........................................................................................................................15
5.03 Certificates of Insurance ...................................................................................................................................15
5.04 CONTRACTOR’s Liability Insurance ..............................................................................................................15
5.05 OWNER’s Liability Insurance ..........................................................................................................................16
5.06 Property Insurance............................................................................................................................................16
5.07 Waiver of Rights ................................................................................................................................................17
5.08 Receipt and Application of Insurance Proceeds...............................................................................................18
5.09 Acceptance of Bonds and Insurance; Option to Replace.................................................................................18
5.10 Partial Utilization, Acknowledgment of Property Insurer ...............................................................................18
ARTICLE 6 - CONTRACTOR’S RESPONSIBILITIES ..............................................................................................................18
6.01 Supervision and
