READ ALONGSIDE THE SOURCE
Fort Walton Beach — Fiscal Year 2023-24 Adopted Budget — reading text
Part 39 of 85. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — ADID-131.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
4,029 519-2101 Medicare 4,235 5.12%
52,644 37,367 23,809 13,255 519-2200 Retirement Contributions 7,296 -44.95%
5,538 7,102 7,271 9,064 519-2204 Retirement Contributions - DC Plan 13,149 45.07%
26,568 34,109 42,964 45,154 519-2300 Dental, Life & Health Insurance 62,822 39.13%
8,918 9,870 11,402 18,321 519-2400 Worker's Compensation 23,948 30.71%
$ 329,969 $ 349,529 $ 372,595 $ 407,981 Total Personnel Services $ 430,924 5.62%
Operating Expenditures:
83,699 85,304 87,272 85,641 519-3100 Professional Services 102,000 19.10%
3,213 3,408 2,754 2,460 519-4100 Communication Services 1,050 -57.34%
174,892 180,511 170,835 98,932 519-4300 Utilities 101,900 3.00%
27 107 98 - 519-4400 Rentals & Leases - 0.00%
36,092 30,235 36,655 39,305 519-4610 Maintenance Contracts 43,307 10.18%
3,201 2,588 5,734 3,750 519-4620 Vehicle Repair 3,750 0.00%
46 9 15 300 519-4630 Equipment Repair 300 0.00%
120,934 182,413 83,189 164,100 519-4640 Building Maintenance 190,500 16.09%
33,197 90,592 83,518 220,650 519-4645 Heating/Cooling Repairs 220,650 0.00%
- - - 1,500 519-4670 Traffic Signals 1,500 0.00%
21 175 15 400 519-5100 Office Supplies 400 0.00%
5,197 5,227 6,372 7,345 519-5200 Operating Supplies 9,970 35.74%
942 1,434 176 - 519-5201 Cleaning Supplies for Field Office - 0.00%
4,362 6,402 10,140 8,116 519-5204 Fuel & Oil 8,522 5.00%
522 528 535 525 519-5210 Uniform Expense 525 0.00%
199 - - - 519-5231 Computer Hardware/Software - 0.00%
1,550 1,139 1,875 2,000 519-5233 Tools 2,000 0.00%
972 663 1,126 1,530 519-5234 Safety Supplies/Equipment 1,530 0.00%
7,357 10,226 10,113 11,750 519-5301 Street Markings 11,750 0.00%
- - 845 - 519-5500 Training 1,000 100.00%
(143) - - - 519-9905 Capitalized Costs Allocation - Labor - 0.00%
(75) - - - 519-9906 Capitalized Costs Allocation - Benefits - 0.00%
(35) - - - 519-9907 Capitalized Costs Allocation - Overhead - 0.00%
$ 476,171 $ 600,961 $ 501,269 $ 648,304 Total Operating Expenditures $ 700,653 8.07%
Capital Outlay:
- - 22,622 - 519-6214 Improvements Building - 0.00%
1,218 - 10,960 - 519-6310 Improvements Other Than Building - 0.00%
7,488 - 6,110 - 519-6402 Equipment - 0.00%
$ 8,705 $ - $ 39,692 $ - Total Capital Outlay $ - 0.00%
108
1230-Facilities 9/12/2023 11:41 AM
001 GENERAL FUND - 1230 FACILITIES
Actual Budget
2022-23 2023-24 %
2019-20 2020-21 2021-22 Adopted Adpoted Change
Debt Service
156,233 152,909 152,836 153,330 581-9121 Transfer to Debt Service Fund 133,493 -12.94%
2013 Revenue Note-Municipal Facilities General-yr 11 of 18
2018 Rev Note - Field Offc Complex-yr 5 of 19
$ 156,233 $ 152,909 $ 152,836 $ 153,330 Total Debt Service $ 133,493 -12.94%
$ 971,079 $ 1,103,399 $ 1,066,392 $ 1,209,615 TOTAL EXPENSES $ 1,265,070 4.58%
$ (971,005) $ (1,103,362) $ (1,066,392) $ (1,209,290) NET REVENUE / (EXPENSE) $ (1,264,920) 4.60%
109
1230-Facilities 9/12/2023 11:41 AM
STREETS Share of City Budget
DESCRIPTION $685,661,
1.1%
Streets maintains and resurfaces 100 miles of paved streets and maintains 61 miles of sidewalk in the City.
MISSION
Provide a safe and reliable transportation network by maintaining clean, safe, hazard-free roadways, and working to provide the highest
level of service to customers and motorist.
Actual YTD thru 06/30 Budget
CURRENT GOALS, OBJECTIVES, & METRICS (FY24) 2019-20 2020-21 2021-22 2022-23 2022-23 2023-24
Provide A Dependable Transportation Network
Pavement With Condition Index of 'Fair' or Better 95.6% 96.5% 96.5% na 96.0% 96.0%
Streets With Sidewalks on At Least One Side 85.7% 85.7% 85.7% na 86.0% 86.0%
Ensure Capital Projects are Completed On-Time & Within Budget
Capital Projects Completed On-Time 100% 100% 100% na 100% 100%
Capital Projects Completed Within Budget 100% 100% 100% na 100% 100%
Update the MicroPaver Pavement Condition Index for all City streets.
Maintain a safe transportation network within the City.
Repair all sidewalk hazards in existing neighborhoods.
Install segments of sidewalk identified in the five-year connectivity plan per City Strategic Plan.
FUTURE GOALS (FY25 & FY26)
Have all streets maintained by the City with a Pavement Condition Index of 'fair' or better.
Additional lighting and replacement lighting determined from prioritized list.
Update existing City traffic signals and cabinets.
PRIOR YEAR ACCOMPLISHMENTS (FY23)
Installed new sidewalk on First Street SW from the North side of right-of-way from Robinwood Drive SW to St Mary Avenue SW then to
the South driveway of 119 St Mary Avenue SW.
Installed new sidewalk on Alder Avenue SE from the West side of right-of-way from South property line of 14 Alder Avenue SE to Fourth
Street SE.
Installed new sidewalk on Memorial Parkway NW from the East side of right-of-way from Holmes Boulevard NW to Hollywood Boulevard
NW.
Installed new sidewalk for new restroom at Pickleball Courts on Mooney Road NE.
Installed new sidewalk on the West side of Robinwood Drive NW from Hollywood Boulevard NW to Jet Drive NW.
Resurfaced Ready Avenue NW from Hollywood Boulevard NW to Lovejoy Road NW and added bicycle lanes.
Repaved "The Point Parking Lot" at 164-166 Miracle Strip Parkway SE.
110
001 GENERAL FUND - 1240 STREETS
Actual Budget
2022-23 2023-24 %
2019-20 2020-21 2021-22 Adopted Adopted Change
Revenues:
602,302 690,797 691,889 702,541 312-4100 Local Option Fuel Tax 726,535 3.42%
272,915 291,616 306,603 295,699 312-4200 Local Option Fuel Tax - 2nd 330,525 11.78%
6,876 468 468 516 325-1003 Stokes Avenue -
