READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — January 18, 2013 — reading text
Part 13 of 60. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Summary
prepared by Ken Little, Military Sustainability Partnership Coordinator, 609-3014, klittle@co.okaloosa.fl.us
Attachment: Matrix Eglin SAS Contract Performance Summary 123112 (1269 : Final Payment to Matrix Design Group, Inc. for JLUS SAS)
Task 2
2.100 Task 2A GIS Data 10/31/2011
2.200 Task 2B Issues Update 10/31/2011
2.300 Task 2C Refine MIPA/MAZ III Study Area 8/19/2011
2.400 Task 2D Prepare Draft Land Use Compatibility Guidelines 10/31/2011
2.500 Task 2E Planned Capacity 3/31/2012
2.900 Task 2 Supplemental Initial Data Collection, Mapping and Analysis for Rock Hill/LZ East 8/23/2012
2.910 Task 2A Supplemental GIS Data for Rock Hill/LZ East 8/23/2012
2.920 Task 2B Supplemental Issues Update for Rock Hill/LZ East 8/23/2012
2.930 Task 2C Supplemental Refine MIPA/MAZ III Study Area for Rock Hill/LZ East 8/23/2012
2.940 Task 2D Supplemental Prepare Draft Land Use Compatibility Guidelines for Rock Hill/LZ East 8/23/2012
2.950 Task 2E Supplemental Planned Capacity for Rock Hill/LZ East 8/23/2012
17 Small Area Study Task 2 action items
Completed 17
Not Completed 0
100.00%
Task 3
Monday, December 31, 2012 Page 2 of 11
Packet Pg. 129
6.6.a
Contract Performance Summary
prepared by Ken Little, Military Sustainability Partnership Coordinator, 609-3014, klittle@co.okaloosa.fl.us
Attachment: Matrix Eglin SAS Contract Performance Summary 123112 (1269 : Final Payment to Matrix Design Group, Inc. for JLUS SAS)
Task 3
3.000 Task 3 Mission Conflict and Database Analysis 4/25/2012
3.100 Task 3 Deliverable Map of Planning Subareas (proposed and final) 8/23/2012
3.100 Task 3A Assess the Need for Planning Subareas 3/31/2012
3.200 Task 3 Deliverable Update to memorandum documenting Planned Capacity analysis to 11/8/2012
reflect Task 3B efforts
Memorandum documenting Planned Capacity Analysis (Task 2 Deliverable) was completed after
preparation of the Final Report. There were no proposed FLUM or Zoning Map changes in the
Final Report recommendations; therefore, no update beyond the initial analysis is necessary.
3.200 Task 3B Refine Land Use Capability 3/31/2012
3.300 Task 3 Deliverable Baseline report on demographic and economic conditions (regional and 10/8/2012
identified micro areas). Initial identification of potential economic and demographic
impacts of policy changes.
3.300 Task 3C Policy / Regulatory Analysis 1/23/2012
3.400 Task 3 Deliverable Memorandum documenting finding of Policy/Regulatory Analysis (Task 1/23/2012
3C)
3.900 Task 3 Supplemental Mission Conflict and Database Analysis for Rock Hill/LZ East 8/23/2012
3.910 Task 3A Supplemental Assess the Need for Planning Subareas for Rock Hill/LZ East 8/23/2012
3.920 Task 3B Supplemental Refine Land Use Capability for Rock Hill/LZ East 8/23/2012
3.930 Task 3C Supplemental Policy/Regulatory Analysis for Rock Hill/LZ East 8/23/2012
Monday, December 31, 2012 Page 3 of 11
Packet Pg. 130
6.6.a
Contract Performance Summary
prepared by Ken Little, Military Sustainability Partnership Coordinator, 609-3014, klittle@co.okaloosa.fl.us
Attachment: Matrix Eglin SAS Contract Performance Summary 123112 (1269 : Final Payment to Matrix Design Group, Inc. for JLUS SAS)
Task 3
12 Small Area Study Task 3 action items
Completed 12
Not Completed 0
100.00%
Task 4
4.000 Task 4 Analysis of Future Land Use Planning Options 3/31/2012
4.010 Task 4 Deliverable Memorandum on alternative approaches (up to two(2) for each area to 1/23/2012
achieve compatibility.
4.900 Task 4 Supplemental Analysis of Future Land Use Planning Options for Rock Hill/LZ East 8/23/2012
3 Small Area Study Task 4 action items
Completed 3
Not Completed 0
100.00%
Task 5
5.000 Task 5 Changes to Policy and Regulatory Framework for SAS 8/23/2012
5.010 Task 5 Deliverable Proposed FLUM Changes. 10/8/2012
5.020 Task 5 Deliverable Proposed Zoning Map Changes. 10/8/2012
5.030 Task 5 Deliverable Modify Comprehensive Plan/Zoning Code/Other Regulatory Changes. 8/21/2012
5.040 Task 5 Deliverable Refine Potential Economic and Demographic Impacts of Proposed 10/8/2012
Changes.
Monday, December 31, 2012 Page 4 of 11
Packet Pg. 131
6.6.a
Contract Performance Summary
prepared by Ken Little, Military Sustainability Partnership Coordinator, 609-3014, klittle@co.okaloosa.fl.us
Attachment: Matrix Eglin SAS Contract Performance Summary 123112 (1269 : Final Payment to Matrix Design Group, Inc. for JLUS SAS)
Task 5
5.900 Task 5 Supplemental Changes to Policy and Regulatory Framework for SAS for Rock Hill/LZ 8/23/2012
East
6 Small Area Study Task 5 action items
Completed 6
Not Completed 0
100.00%
Task 6
6.000 Task 6 Draft Small Area Studies Report Development 8/21/2012
6.010 Task 6 Deliverable Preliminary Draft Small Area Studies document 4/24/2012
6.020 Task 6 Deliverable Public Draft Small Area Studies document (15 printed copies) 10/4/2012
6.030 Task 6 Deliverable Completed comments tracker 9/25/2012
6.100 Task 6A Preliminary Draft Small Area Studies Document Review Process 4/24/2012
6.200 Task 6B Public Draft Small Area Studies Document Review Process 8/21/2012
6.300 Task 6C Public Review and Comment 9/21/2012
7 Small Area Study Task 6 action items
Completed 7
Not Completed 0
100.00%
Task 7
Monday, December 31, 2012 Page 5 of 11
Packet Pg. 132
6.6.a
Contract Performance Summary
prepared by Ken Little, Military Sustainability Partnership Coordinator, 609-3014, klittle@co.okaloosa.fl.us
Attachment: Matrix Eglin SAS Contract Performance Summary 123112 (1269 : Final Payment to Matrix Design Group, Inc. for JLUS SAS)
Task 7
7.000 Task 7 Prepare Final Report 10/8/2012
7.010 Task 7 Deliverable Draft Final Report 10/8/2012
7.020 Task 7 Deliverable Final Report (10 printed copies, 10 CD copies) 12/3/2012
7.100 Task 7A Prepare Draft Final Report 10/8/2012
7.200 Task 7B Prepare Final Small Area Studies Report 10/8/2012
5 Small Area Study Task 7 action items
Completed 5
Not Completed 0
100.00%
Task 8
8.000 Task 8 Present Final Report to Local Governing Bodies for Acceptance 10/25/2012
8.010 Task 8 Deliverable Final Report (10 printed copies) 12/3/2012
8.110 Task 8A Deliverable Present Final Report - Okaloosa County 9/18/2012
Presentation of the Final Report was waived by the BCC
8.120 Task 8A Deliverable Present Final Report - Crestview
