READ ALONGSIDE THE SOURCE
Fort Walton Beach — Fiscal Year 2020-21 Adopted_Budget — reading text
Part 42 of 91. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — ADID-128.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
1,368 940 325-1002 Girard Avenue 342 -63.64%
2,045 2,045 6,680 3,432 325-1003 Stokes Avenue 516 -84.97%
12,130 11,833 12,050 14,533 343-9100 Cut Paved Surface/Curb 9,246 -36.38%
102,946 106,035 109,216 113,543 344-9008 DOT Lighting Maintenance Contract 122,081 7.52%
93,274 95,599 98,504 99,716 344-9009 DOT Traffic Signal Maintenance Contract 101,078 1.37%
$ 1,037,291 $ 217,136 $ 1,102,906 $ 1,095,582 TOTAL REVENUES $ 1,077,976 -1.61%
Personal Services:
6.00 5.00 5.00 5.00 Number of Funded Employees (FTE's) 5.00
121,163 106,796 123,797 156,977 541-1200 Regular Salaries 169,864 8.21%
108 - - - 541-1201 Service Awards - 0.00%
361 280 481 1,000 541-1400 Salaries - Overtime 1,000 0.00%
7,487 6,476 7,396 9,103 541-2100 FICA Taxes 10,670 17.21%
1,751 1,515 1,730 2,129 541-2101 Medicare 2,495 17.20%
13,615 24,782 23,753 22,529 541-2200 Retirement Contributions 17,360 -22.94%
4,610 2,955 3,586 5,666 541-2204 Retirement Contributions - DC Plan 7,191 26.91%
759 5,514 11,752 35,050 541-2300 Dental, Life & Health Insurance 43,508 24.13%
8,210 9,397 11,984 13,003 541-2400 Worker's Compensation 16,326 25.55%
$ 158,064 $ 157,715 $ 184,479 $ 245,458 Total Personal Services $ 268,413 9.35%
Operational Expenditures:
92,022 94,315 97,448 101,078 541-3400 Other Services 106,346 5.21%
840 - - - 541-4000 Travel and Per Diem - 0.00%
- 840 770 2,157 541-4100 Communication Services 2,157 0.00%
- - 38 - 541-4200 Freight & Postage - 0.00%
252,000 247,844 250,987 247,844 541-4300 Utilities 247,844 0.00%
138 82 2,740 5,090 541-4400 Rentals & Leases 4,090 -19.65%
4,910 4,676 9,248 7,000 541-4620 Vehicle Repair 6,000 -14.29%
3,226 1,258 6,138 4,000 541-4630 Equipment Repair 4,000 0.00%
3,660 2,584 4,391 3,500 541-5200 Operating Supplies 3,500 0.00%
10,024 10,725 9,446 7,250 541-5204 Fuel & Oil 8,200 13.10%
509 330 319 675 541-5210 Uniform Expense 675 0.00%
2,495 569 721 2,390 541-5233 Tools 3,390 41.84%
1,420 950 1,136 1,920 541-5234 Safety Supplies/Equipment 1,920 0.00%
5,919 1,945 4,097 4,125 541-5250 Operating Supplies - Grounds Maintenance 4,125 0.00%
4,824 1,702 5,061 5,000 541-5300 Road Materials & Supplies 5,000 0.00%
665 255 308 1,000 541-5304 Street Materials/Concrete 1,000 0.00%
300 410 685 885 541-5500 Training 885 0.00%
- (47,989) - - 541-9905 Capitalized Costs Allocation - Labor - 0.00%
- (21,253) - - 541-9906 Capitalized Costs Allocation - Benefits - 0.00%
- (9,865) - - 541-9907 Capitalized Costs Allocation - Overhead - 0.00%
382,952 289,378 393,533 393,914 Total Operating Expenditures 399,132 1.32%
Capital Outlay:
- 6,674 - - 541-6351 Roads - 0.00%
16,014 25,627 13,489 - 541-6402 Equipment 4,200 100.00%
34,424 - - 22,000 541-6404 Trucks / Vans - -100.00%
$ 50,438 $ 32,301 $ 13,489 $ 22,000 Total Capital Outlay $ 4,200 -80.91%
Capital Improvements Program:
- - 182,865 - 5018 - Street Resurfacing - 0.00%
- - 10,572 - 5306 - Sidewalk Construction 25,000 100.00%
$ - $ - $ 193,437 $ - Total Capital Improvements Program $ 25,000 100.00%
$ 591,454 $ 479,393 $ 784,938 $ 661,372 TOTAL EXPENSES $ 696,745 5.35%
$ 445,837 $ (262,257) $ 317,968 $ 434,210 NET REVENUE / (EXPENSE) $ 381,232 -12.20%
1240-Streets 8/31/2020 7:55 AM 106
STREETS Share of City Budget
$696,745,
DESCRIPTION 1.4%
Streets maintains and resurfaces 100 miles of paved streets and maintains 61 miles of sidewalk in the City.
MISSION
Provide a safe and reliable transportation network by maintaining clean, safe, hazard-free roadways, and working to provide the highest
level of service to customers and motorist.
Actual YTD thru 06/30 Budget
CURRENT GOALS, OBJECTIVES, & METRICS (FY21) 2016-17 2017-18 2018-19 2019-20 2019-20 2020-21
Provide A Dependable Transportation Network
Pavement With Condition Index of 'Fair' or Better 95.1% 96.5% 96.1% annual measure 96.5% 96.5%
Streets With Sidewalks on At Least One Side 82.0% 85.5% 85.7% annual measure 85.5% 85.8%
Ensure Capital Projects are Completed On-Time & Within Budget
Capital Projects Completed On-Time 100% 100% 100% annual measure 100% 100%
Capital Projects Completed Within Budget 100% 100% 100% annual measure 100% 100%
Update the MicroPaver Pavement Condition Index for all City streets.
Maintain a safe transportation network within the City.
FUTURE GOALS (FY22 & FY23)
Install sidewalks on at least one side of all residential local streets and on both sides of all collector and arterial roadways.
Have all streets maintained by the City with a Pavement Condition Index of 'fair' or better.
Repair all sidewalk hazards in existing neighborhoods.
Install segments of sidewalk identified in the five-year connectivity plan per City Strategic Plan.
Additional lighting and replacement lighting determined from prioritized list.
Intersection and Pedestrian Improvements.
PRIOR YEAR ACCOMPLISHMENTS (FY20)
Resurfaced Yacht Club Drive NE from Cinco Bayou to Ferry Road NE
Resurfaced Hughes Street NE from Cinco Bayou to Ferry Road NE
Resurfaced Industrial Street NW from west of Fort Walton Concrete to east of Fort Walton Concrete.
Resurfaced Victoria Place NW from Oakland Circle NW to Marie Circle NW
Resurfaced Fourth Street alley from Third Street SE to Fourth Street SE.
Completed driveway restoration on Highdon Court NW (Water Main Relay).
Completed driveway restoration on Windemere Court NW (Water Main Relay).
107
001 GENERAL FUND - 1499 1/2 CENT SALES TAX
Actual Budget
2019-20 2020-21 %
2016-17 2017-18 2018-19 Adopted Adopted Change
