READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — July 21, 2015 — Attachment A 070915 — reading text
Part 10 of 21. These parts divide the reading text for browsing; they are not the source document's page numbers.
Attachment A 070915 — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Collection event date, time, and latitude/longitude coordinates
RFID tag number
Serial number (if applicable)
Container/Roll Cart size
Route and truck information
Page 17
Note: Final Agreement terms and conditions will be modified based upon the residential service level selected by the Board
and final negotiations with the Successful Proposer upon Board approval.
Okaloosa County
Solid Waste and Recyclables Collection, Transfer, Processing and Disposal Agreement
Attachment A: Draft Agreement
3.10.12.4. Contractor shall be responsible for asset management including reporting and
tracking the movement of all Roll Carts (e.g., deliveries, removals, exchanges, repairs,
warranty recovery, etc.). All database adjustments must be made within forty‐eight
(48) hours of physical inventory exchange and completion of work order. The asset
management system must integrate with the service verification system and shall
have the ability to generate reports that can be converted to Excel or PDF based on
Roll Cart activity. Data fields shall include, but not be limited to:
Work order number, date, and status
Roll Cart type (Solid Waste or Recyclables)
Customer ID and address
Container serial numbers, new and old if replacement is required
RFID tag numbers, new and old if replacement is required
Serial number
Cart size
Recovery and delivery latitude/longitude coordinates
Route information
Public Education
The Contractor shall work with the County to maximize recycling. Contractor and County shall jointly
implement a promotional and public education program to inform and encourage residents and business
owners to maximize recycling. All Contractor‐developed promotional materials and forms of
communication regarding the County’s programs including, but not limited to, electronic, printed, audio,
video, graphics, logos, etc., shall be reviewed and approved by the Contract Manager prior to disseminating
or presenting publically. Contractor shall provide a monthly report of public education activities pursuant
to Article 8.4.
3.11.1. Residential Customers
Prior to the Commencement Date and annually thereafter, Contractor shall provide customers
with County‐approved recycling information at least three (3) times per year. Such information
shall include at least one (1) billing insert “how to guide” and one (1) newspaper advertisement.
Contractor shall be responsible for the development, printing, and distribution of all required
recycling information; design and content are subject to approval by the Contract Manager prior
to distribution.
3.11.2. Multi‐Family and Commercial Customers
Prior to the Commencement Date and at least annually thereafter, Contractor shall provide Multi‐
Family and Commercial Customers with a brochure summarizing available recycling services.
Brochure design and content are subject to approval by the Contract Manager prior to distribution.
Storms and Hurricanes
In case of a storm or hurricane, the Contract Manager may grant Contractor reasonable variance from
regular schedules and routes. As soon as practical after such storm, Contractor shall advise the Contract
Manager and the customer of the estimated time required before regular schedules and routes can be
resumed. In the event the County desires that Contractor aid the County’s storm cleanup contractor,
Contractor’s cleanup activities shall be by way of a written contract specific to that event. Rates, costs, and
specific cleanup activities shall be set forth. In the event of such storm or hurricane emergency, the County
reserves the right to assign route or pickup priorities as deemed necessary by the Contract Manager.
Page 18
Note: Final Agreement terms and conditions will be modified based upon the residential service level selected by the Board
and final negotiations with the Successful Proposer upon Board approval.
Okaloosa County
Solid Waste and Recyclables Collection, Transfer, Processing and Disposal Agreement
Attachment A: Draft Agreement
ARTICLE 4. TRANSFER STATION OPERATIONS
County Responsibilities
4.1.1. Facility Ownership
The real property at the Transfer Stations and Recycling Facility are, and will continue to be, wholly
owned by the County. For the purposes of this Agreement, real property means the land, all
physical buildings and structures thereon, including all equipment and fixtures with the exception
of rolling stock. Site maps of the Transfer Stations are provided in Exhibit 3.
4.1.2. Permits
The County will be named on the Transfer Station operating permits.
4.1.3. Transfer Station Scale System
The County owns and will continue to maintain the WasteWorks system that records scale data
for the Transfer Stations.
4.1.4. North Transfer Station Scale House
The County will retain the operation and management of the NTS scale house, including staffing.
4.1.5. Delivery of Acceptable Waste
The County or others authorized by the County shall deliver Acceptable Waste to the Transfer
Stations and Recyclables to the Recycling Facility.
4.1.6. Manner of Deliveries
The County shall grant to Contractor reasonable authority to deny admission to the Transfer
Stations of any vehicle carrying materials that may leak, spill, or allow waste to be blown or
scattered about before unloading at the site.
4.1.7. Cooperation
The County shall cooperate with Contractor in Contractor’s efforts to obtain and renew all required
permits, licenses, and approval; shall not appear as an objector in any proceeding to consider the
granting or renewal of such permits, licenses, or approvals; and shall promptly and reasonably
consider any applications by Contractor.
Contractor Responsibilities
4.2.1. Transition
No later than thirty (30) Days after the Effective Date of this Agreement, the Contractor and
Contract Manager, together with any subject matter experts the Contract Manager may select to
provide it assistance, shall conduct a joint inspection of the Transfer Stations to document the
existing condition of the facility to define and document the Required Turn Back Condition for the
Transfer Stations. Details regarding the Required Turn Back Condition shall be defined, including
who is responsible for making repairs or replacements immediately or in the future, and estimated
cost of repairs or replacements, if feasible.
4.2.1.1. In order to establish the Required Turn Back Condition of all real property at the
Transfer Stations, the County and Contractor shall conduct a joint inspection(s) of the
facilities’ sites and buildings, to include utilities, no later than thirty (30) Days after
the Effective Date of this Agreement. The County and Contractor shall develop a list
of any necessary repairs or replacements that, following completion of such repairs
and replacements, shall be the Required Turn Back Condition, allowing for normal
wear and tear commensurate with the time of use, and considering the Contractor’s
responsibilities for maintenance, repair, and replacement.
Page 19
Note: Final Agreement terms and conditions will be modified based upon the residential service level selected by the Board
and final negotiations with the Successful Proposer upon Board approval.
Okaloosa County
Solid Waste and Recyclables Collection, Transfer, Processing and Disposal Agreement
Attachment A: Draft Agreement
4.2.1.2. As part of documenting the Required Turn Back Condition, the County’s engineering
consultant will evaluate and document the percentage of wear on the tip floors. The
Contractor shall be required to leave the tip floors in equal or better condition upon
the termination of this Agreement. If the Contractor fails to leave the tip floors in
equal or better condition than documented in the Required Turn Back Condition
report, the Contractor shall reimburse the County one hundred and twenty five
percent (125%) of the cost of returning the tip floor(s) to its Required Turn Back
Condition to cover both the cost of the work and the County’s administrative and
overhead costs.
4.2.1.3. At least ninety (90) Days prior to the conclusion of the term of this Agreement, the
County and Contractor shall jointly inspect the Transfer Stations and Recycling Facility
to identify any repairs or replacements needed to bring the facilities to the Required
Turn Back Condition. The Contractor, pending the Contract Manager’s approval, shall
develop a list of any and all necessary repairs or replacements that the Contractor,
at its sole cost and expense, must perform and shall establish a schedule for
completing all such work.
4.2.1.4. At the termination of this Agreement, the Contractor shall have restored the Transfer
Stations to its Required Turn Back Condition. Contractor may remove any fixed assets
as long as Contractor restores the area to its pre‐existing condition, unless otherwise
approved by the Contract Manager. The County reserves the right to require the
Contractor to remove any fixed assets and restore the area to its pre‐existing
condition at the Contractor’s expense.
4.2.1.5. During the transition prior to the termination of this Agreement, the Contractor shall
cooperate with the County
