READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 2013-24 - Adopt Tentative Budget FY 13-14 — reading text
Part 3 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-32167-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
77439 05/ 30/ 13 Ready Mix USA
04/ 23/ 13 Graybar Electric Co Square D Electrical Gear Package 29, 381. 00 401 -5031- 535 -6361 Dec 2013
77440
Rock Anchors for PS # 1 & Storage Tank 49, 737. 20 401- 5031 -535 -6361 Dec 2013
77474 02/ 01/ 13 Skyline Steel
289, 009. 02 401 - 5031 -535 -6361 Dec 2013
77712 08/ 15/ 13 C.W. Roberts Contracting Limerock, Pavement Patching
77786 03/ 12/ 13 Red Valve Co Cone Sleeve & Upgrade 1, 620. 00 401 - 5031 -535 -6361 Dec 2013
Floor and Grout Mix 22, 106. 50 401 - 5031 - 535 -6361 Dec 2013
77808 07/ 22/ 13 Fort Walton Concrete
77860 03/ 22/ 13 Southwestern Suppliers Rebar & Plastic Bolster for PS # 1 & Storage Tank 18, 913. 63 401 - 5031 -535 -6361 Dec 2013
05/ 20/ 13 Concrete Modular Systems 63, 099. 12 401 - 5031 -535 -6361 Dec 2013
124265* Electrical Building
73289 Hurlburt Reuse Construction Drawings 16, 534. 35 401 - 5421 -535 -6365 Dec 2013
10/ 13/ 11 Fabre Engineering
Utilities Fund 2,067, 215. 09
72985 09/ 23/ 11 Hatch Mott MacDonald Stormwater Master Plan 4, 453. 27 405- 1380 -538 -3100 Dec 2013
497. 00 405 -1380 -538 -4680 Dec 2013
79001 08/ 20/ 13 CB Concrete Pumping Pump truck for filling pipe at 293 Briarwood
79002 08/ 20/ 13 Fort Walton Concrete Flowable fill concrete for 293 Briarwood 760. 00 405 - 1380 -538 -4680 Dec 2013
Pipe for 293 Briarwood Cr 2, 166. 60 405- 1380 -538 -4680 Dec 2013
79017 08/ 22/ 13 HD Supply Waterworks
Stormwater Fund 7, 876. 87
requisition; purchase order not yet issued Purchase Order Encumbrance Carryover - All Fundsr 11 .
9/ 4/ 2013 5: 20 PM
U: \Finance \Budget \Budget 13 -14 \Comprehensive \35 Carryovers FY13 to FY14
