READ ALONGSIDE THE SOURCE

Fort Walton Beach Resolution — 2013-24 - Adopt Tentative Budget FY 13-14 — reading text

Part 3 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-32167-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

77439 05/ 30/ 13 Ready Mix USA 04/ 23/ 13 Graybar Electric Co Square D Electrical Gear Package 29, 381. 00 401 -5031- 535 -6361 Dec 2013 77440 Rock Anchors for PS # 1 & Storage Tank 49, 737. 20 401- 5031 -535 -6361 Dec 2013 77474 02/ 01/ 13 Skyline Steel 289, 009. 02 401 - 5031 -535 -6361 Dec 2013 77712 08/ 15/ 13 C.W. Roberts Contracting Limerock, Pavement Patching 77786 03/ 12/ 13 Red Valve Co Cone Sleeve & Upgrade 1, 620. 00 401 - 5031 -535 -6361 Dec 2013 Floor and Grout Mix 22, 106. 50 401 - 5031 - 535 -6361 Dec 2013 77808 07/ 22/ 13 Fort Walton Concrete 77860 03/ 22/ 13 Southwestern Suppliers Rebar & Plastic Bolster for PS # 1 & Storage Tank 18, 913. 63 401 - 5031 -535 -6361 Dec 2013 05/ 20/ 13 Concrete Modular Systems 63, 099. 12 401 - 5031 -535 -6361 Dec 2013 124265* Electrical Building 73289 Hurlburt Reuse Construction Drawings 16, 534. 35 401 - 5421 -535 -6365 Dec 2013 10/ 13/ 11 Fabre Engineering Utilities Fund 2,067, 215. 09 72985 09/ 23/ 11 Hatch Mott MacDonald Stormwater Master Plan 4, 453. 27 405- 1380 -538 -3100 Dec 2013 497. 00 405 -1380 -538 -4680 Dec 2013 79001 08/ 20/ 13 CB Concrete Pumping Pump truck for filling pipe at 293 Briarwood 79002 08/ 20/ 13 Fort Walton Concrete Flowable fill concrete for 293 Briarwood 760. 00 405 - 1380 -538 -4680 Dec 2013 Pipe for 293 Briarwood Cr 2, 166. 60 405- 1380 -538 -4680 Dec 2013 79017 08/ 22/ 13 HD Supply Waterworks Stormwater Fund 7, 876. 87 requisition; purchase order not yet issued Purchase Order Encumbrance Carryover - All Fundsr 11 . 9/ 4/ 2013 5: 20 PM U: \Finance \Budget \Budget 13 -14 \Comprehensive \35 Carryovers FY13 to FY14

Download this text file with its original spacing ↓