READ ALONGSIDE THE SOURCE
Fort Walton Beach — Fiscal Year 2021-22 Adopted Budget — reading text
Part 80 of 89. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — ADID-129.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Economic Diversification & Resiliency
Insert Picture Here
198
City of Fort Walton Beach, Florida FY 2022 - 2026 Budget
Capital Improvement Program (CIP)
(For Projects/Equipment Costing Over $25,000 and Estimated Useful Life of Ten Years or Greater)
Priority No. 1
Project Title: Freedom Beacon 12-Inch Water Line
Responsible Department: Utility Services Neighborhood/Loc Citywide
Responsible Division: Water Distribution Project Manager: Daniel Payne
Project Category: Infrastructure Project Type: Multi-Year
Project Number: 50XX Estimated Useful Life (years): 50
Criteria Type: Public Health & Safety Projected Date of Completion: 09/30/22
Project Description/Justification:
As a part of the construction of the Freedom Beacon Development, a new 12-inch water main is required to serve the area. This results in a
roughly 1,750 LF of 12-inch water main traversing through the City Golf Course.
FY 2022
FY 2023
FY 2024
FY 2025
FY 2026
BUDGETED EXPENDITURE SCHEDULE
FY FY FY FY FY Five Year Total
Project Elements: 2022 2023 2024 2025 2026 Total Project Cost
Improvements 300,000 300,000
Furniture/Fixture/Equip. - - - - - -
Operational Impact - - - - - -
Total Expenditures 300,000 - - - - 300,000 300,000
Expenses From Prior Year(s): Funded from Prior Yr. Revenue: $0
Prior Year Activity on Project:
FY 2021 N/A
FY 2020 N/A
FY 2019
FY 2018
FY 2017
FY FY FY FY FY Five Year Total
Revenue Funding Summary: 2022 2023 2024 2025 2026 Total Revenue
City Funding 300,000 300,000
Grant Funding - - -
Debt Financing -
Other Outside Funding -
Revenue Enhancements - - - - - -
Total Revenue Funding: 300,000 - - - - 300,000 300,000
Strategy #1: Economic Diversification & Resiliency
Insert Picture Here
199
City of Fort Walton Beach, Florida FY 2022 - 2026 Budget
Capital Improvement Program (CIP)
(For Projects/Equipment Costing Over $25,000 and Estimated Useful Life of Ten Years or Greater)
Priority No. 3
Project Title: Sewer System Lining and Grouting
Responsible Department: Utility Services Neighborhood/Loc Citywide
Responsible Division: Sewer Collection & Treatment Project Manager: Daniel Payne
Project Category: Infrastructure Project Type: Multi-Year
Project Number: 5032 Estimated Useful Life (years): 25
Criteria Type: Improve Existing Svs/Infrastructure Projected Date of Completion: 09/30/21
Project Description/Justification:
The City has 110 miles of sewer lines, with a majority of the lines consisting of clay pipe. Clay and unlined cast iron pipe are susceptible to root
intrusion, offset joints and cracking due to the brittleness of the material. These problems allow a significant amount of inflow and infiltration and
debris into the wastewater system, which can eventually result in stop-ups and possible sanitary sewer overflows. Prior to performing the
rehabilitation, mains and manholes are inspected via closed-circuit television and monitored for leaks and other problems. The rehabilitation
techniques include cured-in-place pipe lining, epoxy- or urethane-based manhole lining, and chemical root treatment.
FY 2022 Segments to be determined based on video inspections and lift station data
FY 2023 Segments to be determined based on video inspections and lift station data
FY 2024 Segments to be determined based on video inspections and lift station data
FY 2025 Segments to be determined based on video inspections and lift station data
FY 2026 Segments to be determined based on video inspections and lift station data
BUDGETED EXPENDITURE SCHEDULE
FY FY FY FY FY Five Year Total
Project Elements: 2022 2023 2024 2025 2026 Total Project
Improvements 30,000 30,000 30,000 30,000 30,000 150,000
Furniture/Fixture/Equip. - - - - - -
Operational Impact -
Total Expenditures 30,000 30,000 30,000 30,000 30,000 150,000 1,571,003
Expenses From Prior Year(s): $1,421,003 Funded from Prior Yr. Revenue: $1,421,003
Prior Year Activity on Project:
FY 2021 Lining and Grouting of Eglin Parkway SE from 4th Street SE to 3rd Street SE
FY 2020 Sewer System Lining and Grouting
FY 2019 Sewer System Lining and Grouting
FY 2018 Sewer System Lining and Grouting
FY 2017 Sewer System Lining and Grouting
FY FY FY FY FY Five Year Total
Revenue Funding Summary: 2022 2023 2024 2025 2026 Total Revenue
City Funding 30,000 30,000 30,000 30,000 30,000 150,000
Grant Funding - - - - -
Debt Financing - - - - - -
Other Outside Funding - - - - - -
Revenue Enhancements - - -
Total Revenue Funding: 30,000 30,000 30,000 30,000 30,000 150,000 1,571,003
Strategy #1: Safe and Livable Community for Citizens
Insert Picture Here
200
City of Fort Walton Beach, Florida FY 2022 - 2026 Budget
Capital Improvement Program (CIP)
(For Projects/Equipment Costing Over $25,000 and Estimated Useful Life of Ten Years or Greater)
Priority No. 1
Project Title: Freedom Beacon 6-Inch Forcemain
Responsible Department: Utility Services Neighborhood/Loc Citywide
Responsible Division: Sewer Collection & Treatment Project Manager: Daniel Payne
Project Category: Infrastructure Project Type: Multi-Year
Project Number: 50XX Estimated Useful Life (years): 50
Criteria Type: Improve Existing Svs/Infrastructure Projected Date of Completion: 09/30/22
Project Description/Justification:
As a part of the construction and replacemnt of the Freedom Beacon Development, a new 6-inch forcemain is required to serve the development.
This results in a roughly 2,500 LF of 6-inch forcemain traversing through the City Golf Course.
FY 2022 Freedom Beacon 6-Inch Forcemain
FY 2023
FY 2024
FY 2025
FY 2026
BUDGETED EXPENDITURE SCHEDULE
FY FY FY FY FY Five Year Total
Project Elements: 2022 2023 2024 2025 2026 Total Project Cost
Improvements 500,000 500,000
Furniture/Fixture/Equip. - - - - - -
Operational Impact - - - - - -
Total Expenditures 500,000 - - - - 500,000 500,000