READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — 2013 meeting #1182 (date undetermined) — Change Order #1 breakdown — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 52-Change Order _1 breakdown.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

NAME OF PROJECT: CONTRACTORS NAME: ADDRESS: Change Order Summary Effective Date Term JOB NO. 41-457 Annual Contract for Manhole Rehabilitation Gulf Coast Underground, LLC 3158 Old Shell Road Mobile, Alabama 36607 1 through October 1, 2013 1 September 30, 2015 with One Two Year Renewal ITEM NO. DESCRIPTION ORIGINAL UNITS Original Contract CONTRACT UNIT PRICE TOTAL COST Phase | (Original Contract) COMPLETED UNITS (To Date) TOTAL COST. COMPLETED Total Contract Quantities CURRENT CURRENT CONTRACT UNITS TOTALS Complete Mobilization and Demobilization for original project and any subsequent Task Order greater than $25,000 $ 150.00 150.00 150.00 |: 2 $ 300.00 Cementitious Underlayment (%2" increments) for Structural Rehabilitation, per specifications, of 4' diameter sanitary sewer manholes 6' in depth or less 42 VF $ 60.00 2,520.00 42 $ 2,520.00 Cementitious Underlayment (4" increments) for Structural Rehabilitation, per specifications, of 4° diameter sanitary sewer manholes greater than 6' up to 8' in depth or less 44 VF $ 60.00 2,640.00 44 $ 2,640.00 Cementitious Underlayment (%2" increments) for Structural Rehabilitation, per specifications, of 4' diameter sanitary sewer manholes greater than 8' up to 10' in depth or less 20 VF $ 60.00 1,200.00 20 $ 1,200.00 Cementitious Underlayment (%" increments) for Structural Rehabilitation, per specifications, of 4' diameter sanitary sewer manholes greater than 10° up to 12' in depth or less 90 VF $ 60.00 5,400.00 90 $ 5,400.00 Cementitious Underlayment (”2" increments) for Structural Rehabilitation, per specifications, of greater than 4' diameter sanitary sewer manholes and wet wells 400 SF $ 4.00 1,600.00 400 $ 1,600.00 Epoxy System Lining, per specifications, of 4' diameter sanitary sewer manholes (Condition A or B) 6’ in depth or less- 21 VF $ 250.00 5,250.00 21.3 5,325.00 | 87 $ 21,675.00 Epoxy System Lining, per specifications, of 4° diameter sanitary sewer manholes (Condition A or B) greater than 6' up to 8' in depth or less 22 VF $ 250.00 5,500.00 6.7 $ 1,675.00 | 82 $ 20,575.00 a Gp Page TO NAME OF PROJECT: CONTRACTORS NAME: ADDRESS: Change Order Summary Effective Date Term JOB NO. 41-457 Annual Contract for Manhole Rehabilitation Gulf Coast Underground, LLC 3158 Old Shell Road Mobile, Alabama 36607 1 October 1, 2013 through 1 September 30, 2015 with One Two Year Renewal ITEM NO. DESCRIPTION ORIGINAL UNITS Original Contract CONTRACT UNIT PRICE TOTAL COST Phase | (Original Contract) COMPLETED UNITS (To Date) TOTAL COST COMPLETED Total Contract Quantities CURRENT CURRENT CONTRACT UNITS TOTALS Epoxy System Lining, per specifications, of 4' diameter sanitary sewer manholes (Condition A or B) greater than 8' up to 10' in depth or less 10 VF $ 250.00 2,500.00 25.9 6,475.00 50 $ 12,525.00 10 Epoxy System Lining, per specifications, of 4' diameter sanitary sewer manholes (Condition A or B) greater than 10' up to 12' in depth or less 45 VF $ 250.00 11,250.00 66.8 16,700.00 111 $ 27,800.00 Epoxy System Lining, per specifications, of greater than 4’ diameter (Condition A or B) sanitary sewer manholes and wet wells 200 SF $ 25.00 5,000.00 800 $ 20,000.00 12 Additional cost for Epoxy System Lining, per specifications, of 4' diameter sanitary sewer manholes (Condition C) 6' in depth or less VF 13 Additional cost for Epoxy System Lining, per specifications, of 4' diameter sanitary sewer manholes (Condition C) greater than 6' up to 8' in depth or less VF 14 Additional cost for Epoxy System Lining, per specifications, of 4' diameter sanitary sewer manholes (Condition C) greater than 8' up to 10' in depth or less VF 15 Additional cost for Epoxy System Lining, per specifications, of 4' diameter sanitary sewer manholes (Condition C) greater than 10' up to 12' in depth or less VF Additional cost for Epoxy System Lining, per specifications, of greater than 4° diameter (Condition C) sanitary sewer manholes and wet wells VF Page 2 of 3 NAME OF PROJECT: CONTRACTORS NAME: ADDRESS: Change Order Summary Effective Date Term JOBNO. 41-457 Annual Contract for Manhole Rehabilitation Gulf Coast Underground, LLC 3158 Old Shell Road Mobile, Alabama 36607 1 through October 1, 2013 1 September 30, 2015 with One Two Year Renewal Original Contract Phase | (Original Contract) Total Contract Quantities ITEM NO DESCRIPTION ORIGINAL UNITS CONTRACT TOTAL COST at a TOTAL COST CURRENT CURRENT CONTRACT — UNIT PRICE COMPLETED UNITS TOTALS (To Date) 17 |Concrete for Rebuilding of Existing bench and invert, per specifications, of sanitary sewer manholes 1 CF $ 6500 $ 65.00 - 1 $ 65.00 18 — |Removal of Existing HDPE Lining, per specifications, of sanitary sewer manholes or wet wells 200 SF $ 130 $ 260.00 182 236.60 400 $ 520.00 19 {Removal of Existing Epoxy Lining, per specifications, of sanitary sewer manholes or wet wells 300 SF $ 060 $ 180.00 492 295.20 600 $ 360.00 20 | Excess Bypass Pumping, as required, for MH #12 (Beal and Clifford) Day $ 220.00 $ 220.00 0 - 1 $ 220.00 21 {Bypass Pumping (8"< Dia <16") 6 Day $ 190.00 $ 1,140.00 - 11 $ 2,090.00 22 | Bypass Pumping (18"< Dia <24") 6 Day $ 220.00 $ 1,320.00 - 7 $ 1,540.00 TOTAL COST COMPLETED $ 46,195.00 30,856.80 $ 121,030.00 Page 3 of 3

Download this text file with its original spacing ↓