SETTLEMENT AGREEMENT AND RELEASE
This Settlement Agreement and Release (the “Settlement Agreement”) is
entered into this ____ day of _______________, 2013, by and between Paul S.
Hsu and Majes Hsu, his wife, (the “Property Owners”) and Okaloosa County,
Florida, a political subdivision of the State of Florida (the “County”).
RECITALS
WHEREAS, the Property Owners are the owners of certain real property
located at 70 Ready Avenue, Fort Walton Beach, Okaloosa County, Florida as
more particularly described in Attachment A (the “Property”); and
WHEREAS, the Property was contaminated by petroleum or some other
contaminate which had originated from a source occurring off of the Property
itself; and
WHEREAS, it is alleged that the source of the contaminate was property
owned by Okaloosa County; and
WHEREAS, as a result of the contamination, the Property was placed on
the state-funded priority cleanup list of the Florida Department of Environmental
Protection (FDEP Facility ID 468623645) and designated for remediation; and
WHEREAS, the Property Owner, the County and the Florida Department of
Environmental Protection (the “FDEP”) have been working together to address
remediation issues relating to the Property; and
WHEREAS, various options have been considered as to the remediation of
the Property and summarized in a document entitled “Remediation Options Cost
Comparison for Off-Site Contamination,” attached hereto as Attachment B; and
WHEREAS, the Parties to this Settlement Agreement and the FDEP have
agreed to remediation Option 3 which requires the demolition of the building on
the Property and remediation by removal of chemically impacted media (i.e., soil
and groundwater) from the site; and
WHEREAS, the site will be fine-graded to match the existing site
1
conditions of the adjacent non-disturbed areas, using clean fill and overburden
removed from the site prior to remediation activities, once impacted media have
been removed and confirmation of compliance procedures are complete; and
WHEREAS, to facilitate the selection of remediation Option 3 by the
FDEP, additional compensation is required to be contributed to allow the State of
Florida to select this remediation Option; and
WHEREAS, to facilitate the selection of remediation Option 3, the Parties
to this Settlement Agreement seek to provide for the additional compensation and
to resolve any remaining issues as to liability relating to the contamination of the
Property; and
WHEREAS, the Property Owner and the County, in consideration of this
additional compensation, desire to fully and finally settle all claims that have arisen
or could arise related to the contamination on the Property resulting from the
contamination (the “Claim”).
NOW THEREFORE, in consideration for the mutual promises contained
herein, the Parties agree as follows:
ARTICLE I: RECITALS
1.1 The recitals set forth above are true and correct and are incorporated as
essential terms of this Settlement Agreement.
ARTICLE II: PARTIES’ RESPONSIBILITIES
2.1 FINANCIAL COMPENSATION FOR BUILDING FROM THE COUNTY
A. The County shall pay to the Property Owners compensation in the amount of
Five Hundred Fifty Thousand Dollars ($550,000) as full and complete
compensation for any loss resulting from the demolition of the building on
the Property and for any damage that may have resulted to the Property.
B. Such compensation shall be paid to the Property Owner by the County in
three annual payments under the following schedule:
2
1. An initial payment of One Hundred Eighty-five Thousand Dollars
($185,000) payable within sixty (60) days of the approval of
remediation Option 3 by the FDEP and under the terms set forth
herein (the “Initial Payment”).
2. A second payment of One Hundred Eighty-Five Thousand Dollars
($185,000) made payable within one (1) year of the date of the
Initial Payment.
3. A third and final payment of One Hundred Eighty Thousand
Dollars ($180,000) made payable within two (2) years of the date
of the Initial Payment.
C. The terms and conditions of this Settlement Agreement are contingent upon
the approval of remediation Option 3 by the FDEP and its agreement to a
remediation strategy and process substantially as set forth in Section 2.2
below.
2.2 REMEDIATION STRATEGY
A. Remediation Selection. This Settlement Agreement is contingent upon the
selection of remediation Option 3 as the preferred remediation for the
Property by the FDEP and its agreement to a remediation strategy and
process substantially as set forth below.
B. Building Demolition. The building on the Property will be demolished as
part of the remediation strategy.
C. State Compensation. The State of Florida, through FDEP, will request
funding in a total amount of $250,000, which, if granted, will be paid to the
Property Owners for compensation for the loss of the building.
D. Relocation of tenants. The relocation of any and all tenants, materials and/or
equipment that are not an integral component of the building and the cost
associated with that relocation will be the responsibility of the Property
Owners.
3
E. Utilities. Property Owners will be responsible for disconnecting all utilities
to the building.
F. Demolition and disposal of the building and slab. The FDEP will be
responsible for the demolition of the building, slab and adjacent ancillary
improvements (e.g., parking lot) and disposal of this debris in order to
accommodate remediation activities.
G. Excavation and staging of clean overburden. The FDEP will provide or
ensure the excavation and verification monitoring of the clean overburden.
The County will provide an appropriate staging area for the clean
overburden, if necessary.
H. Excavation of contaminated soil. The FDEP will provide or ensure that
contaminated soil is properly excavated, transported, and treated or
disposed. If the FDEP determines it necessary, the County will provide the
treatment area.
I. Backfill excavation with clean soil. The FDEP will provide or ensure the
excavated area is properly backfilled with clean soil. Additionally, the
backfill will be compacted to prevent erosion.
J. Contaminated groundwater. The FDEP will provide or ensure that
contaminated groundwater that is extracted is treated and properly disposed.
K. Heavy Equipment. The County would assist in providing heavy equipment,
such as Loaders, Excavators, Backhoes and the like, if available, to assist in
the demolition and disposal of the building and slab, excavation and staging
of clean and contaminated soils, and backfill and grading.
L. Sampling and Analysis. Samples collected to evaluate or verify remediation
objectives will be the responsibility of the FDEP. Monitoring costs to verify
long-term remediation effectiveness will also be FDEP’s responsibility.
M. Remediation and site close-out documentation. All documentation related to
the planning, design, construction, monitoring and close-out of the site will
be the responsibility of the FDEP.
4
N. Remediation Timeline. The County will make a good faith effort to
facilitate the remediation process so that the site will be ready for
construction by April 15, 2013, to the extent that will be consistent with the
procedures and processes of the State and County.
ARTICLE III: RELEASE
3.1 Upon the FDEP’s approval of remediation Option 3, the Property Owner
shall execute a release substantially in the form of the Release attached hereto as
Attachment C (the “Release”). The Release shall release, acquit, satisfy, and
discharge the County from all past and present claims relating to the Claim and to
the Property and its contamination, including, but not limited to causes of actions,
suits, debts, dues, sums of money, accounts, reckonings, bonds, bills, specialties,
covenants, contracts, controversies, agreements, promises, variances, trespasses,
damages, judgments, executions, claims and demands whatsoever in law or in
equity, known or unknown, which the Property Owner had, or now has against
the County by reasons of any matters asserted in or related to the Property and its
contamination and the Claim.
ARTICLE IV: MISCELLANEOUS
4.1 Each party shall bear its own attorneys’ fees and costs.
4.2 The parties acknowledge that they have had the advice of counsel of their
own selection in connection with the terms and conditions of this Settlement
Agreement; that they have read and understand the terms and conditions of this
Settlement Agreement; that they are entering into this Settlement Agreement of
their own free will; and that they intend to be bound by the terms hereof.
4.3 The parties agree that there are no promises or agreements, oral or
otherwise, inducing entry into this Settlement Agreement. The parties are relying
only on the express terms, conditions and agreements set forth herein. The parties
further agree that any promise or agreement, not expressly set forth in writing and
signed by all parties, cannot be relied upon and will not be valid or enforceable.
4.4 In the event any party hereto is required to file suit to enforce the terms and
conditions of this Settlement Agreement, the prevailing party shall be entitled to
recover its attorneys’ fees and costs against the non-prevailing party.
5
4.5 This Settlement Agreement constitutes the compromise of a disputed claim
and the entry into this Settlement Agreement shall not be deemed to be an
admission of liability on the party of any party.
BOARD OF COUNTY COMMISSIONERS
OKALOOSA COUNTY
BY: _________________________
DON R. AMUNDS, Chair
Date: ________________________
ATTEST:
BY: ________________________
Clerk of Court
PAUL S. HSU
BY: _________________________ Date: _____________
PAUL S. HSU
MAJES HSU
BY:__________________________ Date:______________
MAJES HSU
Signed, Sealed and Delivered
in the presence of:
Witnesses:
6
(Print Name)
(Print Name)
STATE OF FLORIDA
COUNTY OF ________________
The foregoing instrument was acknowledged before me this ________ day of
________________, 2013, by PAUL HSU, who: (notary must check applicable
box)
• is personally known to me.
• produced a current Florida driver's license as identification.
• produced as identification.
(SEAL) _______________________________
STATE OF FLORIDA
COUNTY OF ________________
The foregoing instrument was acknowledged before me this ________ day of
________________, 2013, by MAJES HSU, who: (notary must check applicable
box)
• is personally known to me.
• produced a current Florida driver's license as identification.
• produced as identification.
(SEAL) _______________________________
7