READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 08-27-13--regular — reading text
Part 39 of 69. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-32151-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
be
finalized at its last meeting, which recommends and ranks projects and programs to be
accomplished within the CRA, and which discusses the estimated cost and benefits of
each project. The Committee shall gather input from businesses and residents within the
CRA in order to develop and finalize their recommendations."
After much discussion, the committee ultimately agreed that the CRA should focus on five
primary categories:
Business growth
Beautification
Pedestrian safety
Marketing
Parking
Committee Recommendations
The committee held a public workshop in February 2013 in order to gain more feedback from
area residents and businesses. Over 30 people attended the meeting. The workshop attendees
were asked to rank CRA topics in order of importance. The results of the surveys are shown in
Table 1 below. ` Beautification" ranked as the most important category and " Business
growth/ retention" ranked as the second most important category.
15.2. a
The public also ranked specific activities in order of importance, as shown in Table 2.
After discussing and evaluating each category, the committee began identifying more specific
focus areas within each category. As a result, the committee identified 13 different activities to
that fell within the identified categories and which achieve the goals and objectives of the CRA
Plan. The committee prioritized these projects based on citizen input and how well each project
contributed to the adopted CRA Plan goals. The results of the committee project priority ranking
sheet are shown in Table 3 below.
15.2.a
The Committee has continually expressed concern over the need for pedestrian safety and
friendliness improvements in the CRA, which is conveyed in their rankings. Other top concerns
that were expressed include more parking and continual beautification of the area. The activities
listed below are brief descriptions of the recommended activities that the Committee discussed
during their tenure.
Recommended Activity 1. Continue pedestrian crossing improvements.
Category: Pedestrian Safety/ Friendliness
CPA Plan Objective Objective 33. Continue to Promote Walkable Areas Throughout the CPA
Achieved: Through the Installation of Pedestrian- Friendly Features
CRA Plan Strategy Strategy 3. 3. 3. Improve pedestrian crossings in the CRA.
Achieved:
Without adequate crosswalks, walking may be unsafe in certain areas. This activity includes a
recommendation to continue with the pedestrian crossing improvements on Miracle Strip Pkwy
in downtown and to begin inventorying other areas in the CPA which may need pedestrian
crossing upgrades or im rovements.
Estimated Cost: The estimated cost of this project is approximately $281, 000, including
planning, design, and construction ( construction includes the US
Highway 98 improvements downtown only).
Recommended Activity 2. Continue public parking improvements.
Category: Parking
CPA Plan Objective Objective 3. 5. Ensure the Availability of Adequate and Accessible
Achieved: Parking in the CPA
CPA Plan Strategy Strategy 3. 5. 1 and 3. 5. 2 - Consider acquiring new property or entering
Achieved: intointo publicpublic
- - privateprivate partnershipspartnerships toto addadd additionaladditional parkingparking spacesspaces wherewhere
needed most; consider adding parking lot improvements, where needed
Packet Pp• ii , „.
to
Parking in the CRA, specifically downtown, is neither well -placed nor well -known. In order to
attract patrons to the area to foster redevelopment and revitalization in the CRA, there must be
places to park. This recommendation includes continuing to explore ways in which to add new
parking spaces where possible, improve existing parking areas, and to improve the visibility of
existing parking options, and to fund projects which are feasible and . Staff is currently exploring
options for additional and improved public oarkina.
Eshma[ ed Cost: Costs can range from $ 20, 000 for minor improvements to existing
parking to $ 500, 000 or more if property acquisition and/ or major
improvements are needed.
Recommended Activity 3. Construction of Downtown Streetscape Phase II.
Category: treet/ building beautification
CPA Plan Objective Objective 3. 3. Continue to Promote Walkable Areas Throughout the CRA
Achieved: Through the Installation of Pedestrian- Friendly Features
CPA Plan Strategy Strategy 3. 3. 5. Continue a streetscape program to enhance walkability.
Achieved:
Pedestrian scaled lighting, street furniture, and pavers all enhance the walkable environment and
rovide an area for pedestrian activity near local businesses.
Cost Estimate 260, 000
Recommended Activity 4. Evaluate and install more and better streetlights and public parking lot
lights in the CRA.
Category: Pedestrian Safety/ Friendliness
CRA Plan Objective Objective 3. 5 Ensure the Availability of Adequate and Accessible
Achieved: Puking in the CPA
CRA Plan Strategy Strategy 3. 5. 2. Consider adding parking lot improvements, where needed
Achieved: most, to existing public property.
Adequate lighting is both a pedestrian safety feature and a parking issue. Adequate lighting is
needed to ensure the safety of patron using public sidewalks and parking lots, and adds to the
walkabilit of an environment.
Cost Estimate Approximately $ 30,000 for lighting upgrades at Point parking lot; varies
from $ 14, 000 to $ 140, 000 for other areas within the CRA.
Recommended Activity 5. Continue to allocate funding for the current business grant programs.
Category: Business Growth/ Expansion
CRA Plan Objective Objective 1. 2 Help Landowners Increase their Property Values.
Achieved:
15.28;
CRA Plan Strategy Strategy 1. 2. 1 Implement a CRA Fapade Improvement matching grant.
Achieved: Strategy 6. 2. 1 Create a site development assistance business expansion
grant.
The business grant programs the CRA currently has in place have been very successful, allowing
businesses to move in with little to no permitting fees and cash assistance with new business
signage and fapade. Feedback received by staff and at the committee meetings indicates that the
programs are helping businesses grow and expand, and are highly desirable.
Cost Estimate
Approximately $220, 000 was budgeted for the programs in FY 2012-
2013, and $ 500, 000 was budget in FY 2011 - 12. Approximately
182, 000 in award funding has been approved to date, resulting in a total
private investment of about $ 1, 591, 466.
Recommended Activity 6. Develop and install themed pedestrian signage.
Category: Pedestrian Safety/ Friendliness
CRA Plan Objective Objective 3. 3 Continue to Promote Walkable Areas Throughout the CRA
Achieved:
Through the Installation of Pedestrian- Friendly Features
CRA Plan Strategy Strategy 3. 3. 2. Improve pedestrian signage and signals in the CRA.
Achieved:
Pedestrian scaled wayfinding signage helps promote a community' s character and directs patrons
to shops, dining, and parking, which promotes more activity in the CRA district. However,
signage must be planned and designed accordingly or it can create more confusion and clutter.
Cost Estimate
Planning and design— currently unknown. Construction— approximately
15, 000 to $ 70,000 depending on the type and amount of signage.
Recommended Activity 7. Continue annual sidewalk program.
Category: Pedestrian Safety/ Friendliness
CRA Plan Objective Objective 3. 3 Continue to Promote Walkable Areas Throughout the CRA
Achieved:
Through the Installation of Pedestrian- Friendly Features
CRA Plan Strategy Strategy 3. 3. 1. Continue to budget for and construct sidewalks
Achieved: throughout throughout thethe CRA.CRA.
A network of pedestrian connections is an important aspect to fostering an active CRA
environment. Patrons enjoy being outdoors and enjoy being able to walk from residential areas to
shops and dining and public areas. This activity includes constructing sidewalks in order to
connect those areas via a complete pedestrian network. Staff is currently developing a priority
list of streets in need of sidewalks.
CostCost EstimateEstimate
Sidewalk segments typically cost between $ 16, 000 and $ 70, 000 a street
to construct depending on the length and site design features. The CRA
budgeted $ 75, 000 for sidewalks in 2011 -2012 and constructed several
segments that year.
Y5.2. a
Recommended Activity 8. Improvements at the Fort Walton Landing Park- Update to the Fort
Walton Landing Master Plan.
Category: Area Marketin Ima e
CRA Plan Objective Objective 6. 3 Promote Business Retention in the CRA.
Achieved:
CRA Plan Strategy Strategy 6. 3. 6 Implement a program to provide weekend rentals at the
Achieved:
Fort Walton Landing for farmer' s markets, festivals, etc. to bring new
crowds of customers to the area.
This activity includes a review and update to the Fort Walton Landing Master Plan that was
adopted in 2004, as well as implementation of several upgrades to the Landing, including an
improved stage area to accommodate larger bands, and hardier decking that will last longer
against the elements. This activity is intended to accommodate many festivals and events
throughout the entire year, drawing bigger crowds to the CRA.
Cost Estimate
The cost of the improvements vary greatly —staff is currently gathering
cost information for elements of this activity.
Recommended Activity 9. Develop, distribute, and maintain a downtown parking map.
Category: Parkin
CRA Plan Objective Objective 3. 5 Ensure the Availability of Adequate and Accessible
Achieved: ParkingParking inin thethe CRACRA
CRA Plan Strategy Strategy 3. 5. 3 Improve visibility ofpublic parking through highly visible
Achieved: si na e.
EvenEven thoughthough thethe 20072007 ParkingParking FacilitiesFacilities StudyStudy concludedconcluded thatthat therethere isis notnot aa deficitdeficit ofof
