READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 08-27-13--regular — reading text
Part 32 of 69. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-32151-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
August 6, 2013
TO: Honorable Chairman and Members of the Board
FROM: Elliot Kampen
SUBJECT: 2013 Local Mitigation Strategy Annual Update /Community Rating
System Section 510 Compliance
DEPARTMENT: Growth Management
BCC DISTRICT: All
Introduction
9vAd
R_
CG
In 2011, Okaloosa County and all its municipalities adopted a substantially revised version of the Local
Mitigation Strategy ( LMS). The new LMS was found in compliance by the Florida Division of Emergency
Management in April 2011, and by the Federal Emergency Management Agency in May 2011. By July
acm
2011, all the municipalities as well as the County had passed ordinances or resolutions adopting the wf
J
2011 LMS. Because it includes a comprehensive analysis of the County' s and municipalities floodplain
areas and floodplain management strategies, as well as analyses of all other hazards by which the
County is threatened, the LMS serves as the County' s Hazard Mitigation Plan as provided in Section 510
of the Community Rating System ( CRS) Coordinator' s Manual.
This Annual Report is structured to comply with the requirements of CRS Activity 510 reporting criteria
as provided on pages 510 -30 and 510 -31 of the National Flood Insurance Program Community Rating
System Coordinator' s Manual, FEMA publication FIA- 15/ 2007.
Annual Report Preparation. Submittal to Governing Bodies Release to Media and Public
Availability
This annual report was prepared internally by the Planning Division of the Okaloosa County Growth
Management Department and has been distributed to all the municipalities.
For credit under the Community Rating System, this Annual Report must be distributed to the media
and be made available to the public. To this end, it is being sent to the Northwest Florida Daily News,
and copies of this Report are available for review or download online at the Growth Management
portion of the County Website, and may be viewed or obtained in hard copy at the Growth
Management Department' s offices located at the Water & Sewer Administrative Complex, 1804 Lewis
Turner Boulevard, 2 "d Floor in Fort Walton Beach, or the North Planning Office located at 402
Brookmeade Drive in Crestview. The entire 2011 LMS, as amended, may also be accessed via the
Growth Management portion of the County website or at the previously mentioned Growth
Management office locations.
Revisions to Local Mitigation Strategy
With the approval of the Local Mitigation Strategy Committee ( comprised of representatives from the
County, all nine municipalities, Eglin Air Force, the Okaloosa County Public School District, and private
citizens) and as noted in the 2012 Annual Report, the County amended the 2011 Local Mitigation
Strategy to include its Disaster Housing Plan as a revised section 5. 10. 06.
Additional Changes for this Annual Report
The following oroiects have been completed: u
m9n
The Okaloosa County Water & Sewer Department has completed the replacement of the Okaloosa
ii
Island Lift Station.
Qcc
The following protects have been removed from the attached project list.
acm
y
Project # 5 Main Island lift station has been completed, per Mr. Mark Wise, Engineer for Okaloosa
CountyCounty WaterWater
& & SewerSewer Dept.Dept.
StatusStatus ofof LMSLMS GoalsGoals andand ObjectivesObjectives
AtAt thisthis time,time, muchmuch ofof thethe workwork identifiedidentified inin thethe LMSLMS isis ongoing.ongoing.
TheThe GoalsGoals andand ObjectivesObjectives
( ( thethe statements statements underunder eacheach Goal),Goal), provideprovide thethe broadbroad rangerange ofof whatwhat isis toto bebe
accomplished accomplished duringduring thethe fivefive
- - yearyear planningplanning periodperiod fromfrom 20112011 throughthrough 20152015 byby thethe LMSLMS Steering Steering
Committee.Committee. SinceSince ActionAction ItemsItems are,are, forfor thethe mostmost part,part, ongoingongoing activities-activities- suchsuch asas implementationimplementation ofof thethe
FloridaFlorida BuildingBuilding Code,Code, FloodplainFloodplain ManagementManagement practices,practices, etc.etc. - - thatthat areare undertakenundertaken asas partpart ofof thethe
County'County' ss andand municipalities'municipalities' dayday
- - toto- - dayday operations,operations, theirtheir statusstatus isis ongoing.ongoing. Projects,Projects, onon thethe otherother hand,hand,
maymay bebe partpart ofof on-on- going,going, programmatic programmatic activitiesactivities
( ( suchsuch as,as, forfor example,example, installinginstalling generatorsgenerators toto supplysupply
emergencyemergency powerpower atat keykey infrastructure)infrastructure) oror major,major, oneone - - timetime
( ( oror atat leastleast veryvery longlong term)term) upgradesupgrades ofof
facilitiesfacilities suchsuch asas thethe construction construction ofof aa newnew emergencyemergency operations operations center.center. AtAt thethe timetime ofof thisthis 20132013
AnnualAnnual Report,Report, allall ofof thethe GoalsGoals andand ObjectivesObjectives areare beingbeing met,met, andand projectsprojects havehave beenbeen completedcompleted asas
noted,noted, above.above.
20132013 LMSLMS ProjectsProjects
AttachmentAttachment AA isis thethe currentcurrent listlist ofof LMSLMS projectsprojects asas approvedapproved byby thethe LMSLMS Committee.Committee. ThisThis listlist alsoalso
provides provides thethe statusstatus ofof eacheach project,project, andand statesstates thethe reasonreason
( ( typicallytypically lacklack ofof funds)funds) forfor anyany projects projects forfor
whichwhich actionaction hashas beenbeen deferred.deferred. ItIt shouldshould bebe notednoted thatthat RebuildRebuild NorthwestNorthwest Florida,Florida, aa private,private, nonnon
- - profitprofit
organization,organization, hashas submittedsubmitted toto thethe FloridaFlorida DivisionDivision ofof EmergencyEmergency Management Management oneone ofof thethe projectsprojects onon
thethe 20132013 LMSLMS PriorityPriority ListList Projects,Projects, OkaloosaOkaloosa ResidentialResidential RetrofitRetrofit programprogram submittedsubmitted byby RebuildRebuild
NorthwestNorthwest FloridaFlorida inin response response toto thethe availabilityavailability ofof fundsfunds resulting resulting fromfrom HurricaneHurricane Isaac.Isaac. ThisThis projectproject
PedcetPedcet
8. 2.a
was considered and endorsed by the LMS Committee. In addition, the City of Mary Esther submitted a
project to replace an existing stormwater drainage pipe located on the rear of several lots located on
Brewer Circle.
Recommendations for New pro acts or Revised Recommendations
Except for the City of Mary Esther project noted above, there are no new projects contemplated, nor are
there any recommended revisions.
RECOMMENDATIONS:
RECOMMENDED BY:
Iliot
Li:
mpen, rector 7/ 312013
APPROVED BY:
ounty Administrator
Z 7/ 312013
ErnieErnie Padgett,Padgett, CountyCounty AdministratorAdministrator
City Council of Fort Walton Beach
qV
CITY MANAGER
MEMORANDUM
To: Michael D. Beedie, City Manager
From: Michael Beedie, City Manager
Date: August 27, 2013
Subject: Revised Tennis Center Contract
1.
1. 1. In 2001, the City of Fort Walton Beach contracted out the operation of the Fort Walton
Beach Tennis Center for a three ( 3) year period with the option to renew for an
additional three ( 3) year period.
1. 2. In 2007, an amendment to the original contract was executed to extend the term of the
contract for an additional three ( 3) year period with the option to renew for another
three ( 3) year period under the same terms and conditions.
1. 3. The current contract will end on September 30, 2013.
2. DISCUSSION:
2. 1. On June 11, 2013, City Council approved, by a 4 -3 vote ( Council Member gossom
absent), a new three ( 3) year contract between the City and the Tennis Center
Contractor, Erik Stenberg, with the following changes:
2. 1. 1. The Contractor will be responsible for setting up all utility accounts in his name,
as opposed to the accounts being in the City' s name. The City will still fund
utilities at a total yearly amount of $IOK however, this maximum amount will
he added to the monthly stipend paid to the Contractor, and will increase the
stipend from $ 1, 500 to $ 2, 333. By doing so, the City has the advantage of
