Task Order Number 4 Design Bidding Construction Admin and Inspection Services — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
TASK ORDER APPROVAL FORM
CONTRACT #: C15-2250-AP
TASK ORDER #: l/l
TASK ORDER AMOUNT: $ 88,160
OFFERED BY CONSULTANT:
Michael Baker Jr. Inc.
FIRM'S NAME
Irvin Lee, P.E.
REPRES TIVE'S PRINTED NAME
SIGNATURE
Operations Manager/ Office Executive g L / é - /5
TITLE DATE
RECOMMENDED FOR APPROVAL
(Department Director)
SIGy//uyz’ 75&\\ Nasron AAE, THO
Q\CQC\O(‘ ol Nisgoms
TITLE
. /5;”5
vz
COUN?ADMH\%ATOR (if applicable)
Gt
Task Order for Destin Noise Wall
March 12, 2015
DATE
DATE
APPROVED BY OKALOOSA COUNTY
(Per Purchasing Manual)
e $25,000 or less approved by Purchasing Director
e Between $25,001 and $50,000 approved by
Purchasing Director and County Administrator
e In excess of $50,000 approved by the Board. [q
PURC G DIRECTOR2én Federal
3 feols 3
DATE ! ‘ >
CHAIRMAN (if applicable)
DATE
Page 1 of 4
Task Order Number h[
Noise Wall
at the Destin Executive Airport
Okaloosa County
Exhibit B- Scope
Michael Baker Jr., Inc, a Florida Corporation (hereinafter "CONSULTANT") agrees to perform
and complete the following services (hereinafter "Services") for Okaloosa County Board of
County Commissioners (hereinafter "COUNTY"), in accordance with the terms and conditions
of the Agreement for Professional Architectural, Engineering, and Aviation Planning Services
(Contract No.: C15-2250-AP), dated December 5, 2014, all of which terms and conditions are
incorporated herein by reference.
1. Task Location: Destin Florida -Okaloosa County, Florida
2. Task Name: Noise Wall
3. Task Description / Scope of Services:
This task order provides for the design, bidding and construction phase services of a 300" x 22’
noise wall at the Destin Executive Airport. The wall will be near the south property line
beginning at the Destin Jet entrance sign and ending at the Destin Jet hangar.
An existing 8" wood wall with 45 degree kickers exists
that will be demolished. Behind this wall are several
utility runs including waterlines, cable, power, and
telephone. A power transformer, several telephone
pedestals, “local” power (for landscape uplights and
entrance sign) and a cable pedestal exist behind the wall
with a swing gate for access. It is the intent of this
design to leave them in place and ensure the
foundations provide them adequate clearance. The
“local” power will be relocated and mounted to the base
of the wall and placed in new conduit. Since there is no
provision for a gate in a large noise wall and the wooden kickers will be removed, a paved
access will be provided behind the wall for the utilities.
The design shall consist of prefabricated concrete panels with a texture on one side. Owner
may elect for a graphic pattern (i.e. an aircraft or a pelican) on select panel faces. The
foundation shall consist of drilled concrete shafts or auger cast piles. The designers shall
Task Order for Destin Noise Wall
March 12, 2015 Page 2 of 4
utilize survey and geotechnical information obtained as a part of this project in association
with local codes for wind speeds for the foundation design.
As an added service, utility research and field locate services shall be provided. Note: pre-
design locates by sunshine on call are not reliable due to the fact no digging is actually
occurring. It is imperative that accurate locations are obtained to avoid conflicts with
crossings.
There will be a need to protect the wall from vehicle bumpers to avoid damaging the concrete
panels. Per City of Destin land Development Code, wheel stops can be provided at 30" offset
from the wall. Other options may include bollards or guard rail.
The estimated cost for construction is $220,000; based on a square foot cost of $30 and
added project elements such as demolition, parking modifications, and sidewalk access to
transformers.
Detailed design activities, bidding phase, construction management and construction
inspection services tasks are listed in Exhibit “B".
4. Compensation:
The COUNTY shall compensate the CONSULTANT for the performance of these services a
lump sum fee of $88,160. See Exhibit "B”
Task Order for Destin Noise Wall
March 12, 2015 Page 3 of 4
5. Schedule:
The following schedule for the design, permitting, bidding and construction is as follows:
Schedule Start Duration Completion
NTP April 15, 2015 1 April 15, 2015
Survey and Geotechnical April 15, 2015 25 May 10, 2015
Task 1- 30% Plans May 10, 2015 30 June 9, 2015
Task 2- 100% Plans and Permits June 9, 2015 60 August 8, 2015
Task 3- Bidding August 8, 2015 60 October 7, 2015
Contract Award October 7, 2015 45 November 21, 2015
Construction November 21, 2015 120 March 20, 2016
Accepted by:
CLIENT: CONSULTANT:
Okaloosa County Board of Michael Baker Jr. Inc.
County Commissioners
By:
Printed Name: Soonil Rorman {'\HF;IP(P Printed Name:__Irvin Lee, P.E.
7
Title: ) { R oS Title: _Operations Mngr./ Office Exec.
Date: L%% Date: 2_/6-5
Task Order for Destin Noise Wall
March 12, 2015 Page 4 of 4
EXHIBIT B
Noise Wall
Destin Executive Airport
Fee Summary Sheet
MANHOUR AND FEE ESTIMATE
Task 2 - 100%
Plans
Task 1 - 30% Plans Task 3 - Bidding Task 4 - Construction Services
—_—
Senior Project Manager $150.00 12 12 5 9 38
Senior Structural Engineer $135.00 6 59 8 23 96
Professional Engineer $100.00 48 28 0 31 107
CAD Technician $60.00 40 35 0 2 77
Clerical $45.00 6 7 25 40 78
TOTAL HOURS 112 141 38 105 396
LUMP SUM COSTS $10,080.00 $14,980.00 $2,955.00 $9,475.00 $37,490.00
NOT TO EXCEED COSTS $34,880 $34,880.00
Reproduction $175.00 $175.00 $200.00 $550.00
Mileage $0.00
Postage $75.00 $75.00 $100.00 $100.00 $100.00 $450.00
SUBCONSULTANTS
Nova (Geotechnical) $3,950.00 $5,000.00 $8,950.00
3DS (Survey) $5,840.00 $5,840.00
TOTAL EXPENSES $10,040.00 $250.00 $300.00 $5,100.00 $100.00 $15,790.00
TOTAL COSTS $20,120.00 $15,230.00 $3,255.00 $14,575.00 $34,980.00 $88,160.00
DBE Utilization Summary
Percent of Contract
Nova (Geotechnical) 4.48%
3DS (Survey) 6.62%
11.10%
Page B-1
EXHIBIT B
Noise Wall
Destin Executive Airport
Task 1 - 30% Plans
ANHOUR AND FEE ESTIMATE
Coordination with Airport Staff/ Project Management 4 6 10
Project Kick Off Meeting 4 2 6
Field Review 0
Coordination with Utilities 8 8
Coodination and Permit with the City of Destin 12 12
Coordination with Survey Subconsultant 2 2 4
Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) 2 2
Coordinate with Geotechnical Subconsultant 2 2 4
Quality Control Review 1 1
e
Project layout Plan
General Notes 1 2
Typical Sections 0.5
Demolition Plan 1
Staking Plan 15
Structural Details 3
Miscellaneous Details i} 3 4
Erosion Control Plans 1 b
Plot 30% 11"x17 plans (6 Copies) 1 1
Total Hours: 12 6 48 40 6 112
Page B-2
EXHIBIT B
Noise Wall
Destin Executive Airport
Task 2 - 100% Plans
MANHOUR AND FEE ESTIMATE
Coordination with Airport Staff/ Project Management 6 6
Front End Documents 6 6 2 14
Technical Specifications 8 4 12
Safety Plan 2 1 3
Foundations (piles or drilled shatfts) 40 40
Coordination with civil designers 8 8
Quality Control Review 5 5
= 2 : ; -
Finalize Structural Details 10 16 26
Finalize Cost Estimate 2 2
Engineer's report 4 4
S PR ot
Modify and Finalize Plans
Calculate final Quantities 2 2
Assemble Bid Schedule 1 1
Plot full size and 11"x17" plans 1 1
1
Quality review i
Total Hours: 12 59 28 35 7 141
Page B-3
EXHIBIT B
Destin Executive Airport
Advertise and Coordinate Bidding
Distribute/Sell Bidding Documents
Conduct Pre-Bid Conference
Minutes to Pre-Bid Conference
Answers to Bidders/Issue Addenda
Review Bids for Responsiveness
Bid Tab
Total Hours:
MANHOUR AND FEE ESTIMATE
Noise Wall
Task 4 - Bidding and Award
o 4 5
8 8
4 4
6 6
3 3 6
1 4 5
4 4
5 8 25 38
Page B-5
EXHIBIT B
Destin Executive Airport
MANHOUR AND FEE ESTIMATE
Noise Wall
Task 4- Construction Administration
General Coordination with the Airport 4 4 5 13
General Coordination with the Contractor 5 5 3 13
Pre-Construction Conference 4 4 8
Review Schedules 1 1
Review Shop Drawings/Submittals 2 4 2 8
Review Pay Applications 2 1 3
Review Payrolls, DBE reports, EEQ reports 3 6 9
Review Test Results 3 3
Construction Meetings (none- handled by inspector) 0
Periodic Site Visits (2 Visits) 5 5 10
Review and Respond to RFI's 2 2
Prepare Change Orders 1 i
Final Inspection/ Punch List items 4 4 4 12
Review/ Submit Record Drawings 2 2 2 6
Review Contractor's Closeout Documents 1 2 6 9
Prepare DBE Reporting Form 2 2
Closeout Book 2 3 5
Total: 9 23 31 2 40 105
EXHIBIT B
Noise Wall
Destin Executive Airport
Task 4- Construction Inspection
8 weeks of field work. Total estimated construction time of 90-120 calendar days
RESIDENT INSPECTOR RATE SCHEDULE TOTALS
1) DIRECT SALARY COSTS
Inspector: 8 weeks @ 50 Hrs/Wk @ $70.00 per hour = $28,000
2) DIRECT NON-SALARY EXPENSES
Lodging ($100.00 per night) $4,000
Per Diem ($36 per day) $1,440
Vehicle Allowance ($250 per week) $1,440
SUBTOTAL $6,880
Total Construction Inspection (NTE)= $34,880
N D V A 140-A Lurton Street
" Pensacola, Florida 32505
850.607.7782 / Fax — 850.249.6683
ENGINEERING AND o
ENVIRONMENTAL
March 12, 2015
Mr. Doug Hambrecht
Senior Project Manager
Michael Baker International
5020 West Linebaugh Avenue, Suite 240
Tampa, Florida 33624
Subject: Proposal to Perform a Subsurface Exploration and Geotechnical Engineering Services
and Construction Materials Testing Services
DTS Sound Barrier
Destin Executive Airport (DTS), Destin, Okaloosa County, Florida
NOVA Proposal Number 1615058-GT
Dear Mr. Hambrecht,
NOVA Engineering and Environmental, LLC (NOVA) appreciates the opportunity to submit this proposal
to provide a subsurface exploration and geotechnical engineering evaluation and construction materials testing
services for the subject project. This proposal contains our understanding of the project, our approach to the
exploration, and our fee estimate and schedule.
SITE AND PROJECT INFORMATION
Our understanding of the proposed development is based on:
e Review of emailed project information provided by the client; and
e Our recent experience providing geotechnical services for similar projects in this locale.
We understand that a 20-foot high by 240-foot long sound barrier wall (to be constructed of pre-cast
concrete panels) is proposed at the Destin Executive Airport (DTS) in Destin, Okaloosa County, Florida.
The proposed wall alignment will extend from the Destin Jet entrance sign to the edge of the Destin Jet
Hangar. Our services have been requested to provide geotechnical design parameters relevant to designing
and installing either a drilled shaft or augered cast-in-place (ACIP) pile foundation system, and to provide
construction materials testing services during the design phase of the project.
We understand that the proposed wall alignment is accessible to a truck mounted drill rig, and therefore
neither difficult access nor site clearing allowances will be required for the geotechnical exploration.
Employee Owned — Client Driven
Environmental Consulting — Geotechnical Engineering — Construction Materials Testing and Inspection Services
Code Compliance — Municipal Support/Outsourcing — Private Provider Services™
DTS Sound Barrier Wall March 12, 2015
Michael Baker International NOVA Proposal 1615058-GT
GEOTECHNICAL PROPOSED SCOPE OF SERVICES
Please note; this exploration is limited to the proposed sound barrier wall foundation support design
aspects of the proposed project; hence, additional information regarding overall site development is not
relevant.
Our proposed scope of services is designed to assess the site’s subsurface conditions as they pertain to the
presence of organic materials, loose or otherwise unsuitable soils, and groundwater. We anticipate that
Standard Penetration Test (SPT) data will be required to evaluate the proposed wall alignment. All drilling,
sampling and testing on this project will be conducted in general accordance with ASTM procedures or other
applicable standards and practices. We will not perform additional services without your prior approval.