READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — May 17, 2013 — MLK scope proposal — reading text
Part 2 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 99-MLK scope proposal.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
utilize the Alignment control to assist with the pavement locations.
NCG will locate edge of pavement, edge of paved shoulder, median crossovers,
intersection turnouts, driveway turnouts, and pavement striping along MLK.
NCG will locate edge of pavement, pavement striping, flow line, face of curb, and
back of curb along Green Acres Road.
NCG will show curb cuts for driveway connections and will not show the actual drive
along Green Acres Road.
NCG will show turnouts for side streets on Green Acres Road.
NCG will horizontally locate existing storm water structures within the 2.8 miles of
location area.
NCG will not locate any guardrails, signage, ditches or fencing.
NCG will call Sunshine One, a one call utility location service for utility locates
along the route and will pick up any utilities which cross under existing pavement or
side streets at the time of the survey. NCG will not probe or locate underground
utilities that are not marked on the ground surface. It is the responsibility of the utility
company or it’s representative to mark utilities.
Subtask 5-3 Full DTM Topographic Survey (1500 linear feet)
NCG will collect full DTM for 1500 linear feet along Green Acres from 200 ft west
of the intersection of Beverly Street to the west edge of the southbound lanes of Beal
Parkway.
NCG will utilize the Alignment control to assist with the DTM.
NCG will gather elevations and location with a 75 foot grid along the route picking
up topographic information to the approximate right of way line.
NCG will show pavement, curbing, curb cuts, drive entrances, sidewalks, signs,
fencing, and edges of parking facilities if abutting the approximate Right of Way.
NCG will locate existing medians in the area.
NCG will pick up storm water structure information along the route, obtaining invert
elevations, size and type of pipe if structures are accessible and not bolted down or
locked down in any way.
NCG will locate above ground utility features as they exist at the time of the survey.
NCG will call Sunshine One, a one call utility location service for utility locates
along the route and will pick up any utilities as marked on the ground surface at the
time of the survey. NCG will not probe or locate underground utilities that are not
marked on the ground surface. It is the responsibility of the utility company or its
representative to mark those utilities.
TASK 6 —- DESIGN ANALYSIS (PHASE I)
Subtask 6-1 Roadway Analysis/Design
Objective:
Develop roadway design criteria and required feature details.
HDR Activities:
Prepare horizontal master design files establishing location/layout of proposed
features.
Traffic control analysis. Prepare a traffic control plan to move vehicular traffic
during construction. The design shall include phasing, temporary signing, pavement
markings and detours, as applicable. FDOT design standards shall be used where
possible.
Pavement marking analysis. Prepare a master signing and pavement marking design
file.
Drainage Design. Evaluate 10 drainage structures between Beverly Street and Beal
Parkway and evaluate options for replacement or repair. Hydraulic design will match
existing.
Develop Project Design Report to outline all assumptions and design basis.
Prepare Computation Book.
Prepare Cost Estimate.
Conduct two field reviews.
HDR Deliverables:
Project Design Report
TASK 7 — PLANS PREPARATION (PHASE ID)
Subtask 7-1 60% Design Plans
Objective:
Prepare 60% Design Plans and supporting documentation. The purpose of this submittal
is to analyze existing conditions and show the layout of the proposed features.
HDR Activities:
= Prepare a Key Sheet
= Prepare a Summary of Pay Items with no quantity input.
= Prepare Typical Sections
= Prepare General Notes
« Prepare a Summary of Quantities with no quantity input.
« Prepare Project Layout Sheets showing project overview and Plan sheet layout
« Prepare Plan Sheets at 100-scale for proposed roadway features. The plan view shall
show existing roadway alignment, existing/proposed utilities, drainage structures to
be replaced, wetland limits, right-of-way limits and the proposed roadway
improvements.
= Prepare drainage structure sheets for 10 storm drain replacements between Beverly
Street and Beal Parkway.
= Prepare Pavement Marking Plans at 100-scale.
» Prepare Erosion Control Plans.
« Prepare Stormwater Pollution Prevention Plan (SWPPP).
HDR Deliverables:
Three (3) 11” X 17” copies of the 60% Design Plans
One (1) copy of the 60% Design Documentation
Preliminary Construction Cost Estimate
PDF of Plans and Design Documents
Subtask 7-2 90% Design Plans
Objective:
Prepare 90% design plans.
HDR Activities:
" Incorporate 60% review comments into the plans/design docs
= Update plan sheets with input from utility owners.
« Update Summary of Pay Items with quantity input.
« Update Summary of Quantities with quantity input.
« Prepare Traffic Control Plan Sheets/Details utilizing FDOT Standard details for
conditions specific to this project.
# Prepare Construction Cost Estimate with finalized quantities.
« Update Roadway Design Documentation.
HDR Deliverables:
Three (3) 11” X 17” copies of the 90% Design Plans
One (1) copy of the 90% Design Documentation
Construction Cost Estimate
Computation Book
PDF of Plans, Design Documentation and Computation Book
Subtask 7-3 100% Plans
Objective:
Prepare 100% design plans
HDR Activities:
" Incorporate 90% review comments into the plans/design docs/bid docs/specs.
" Update plan sheets with finalized input from utility owners. Update plan set with
corresponding changes.
" Update quantities.
« Update construction cost estimate.
# Prepare Bid Documentation.
= Update Computation Book.
» Prepare Electronic copy of plans in both .dwg and .pdf formats.
HDR Deliverables:
Three (3) 11” X 17” copies of the 100% Design Plans
One (1) copy of the 100% Design Documentation
Bid Documentation
Construction Cost Estimate
Computation Book
Electronic copy of plans and design documentation to include CADD files
TASK 8 — BID ASSISTANCE (PHASE ID)
Objective:
Assemble bid documents and assist with the bid process.
HDR Activities:
» Submit three (3) signed and sealed 11” X 17” copies of the “For Construction” plans
and three electronic copies of CDs.
» Attend pre-bid meeting.
= Prepare bid addenda as needed during bid period.
= Prepare bid tabulation sheet of all bids received and make bid recommendation.
