READ ALONGSIDE THE SOURCE

Fort Walton Beach Resolution — 2025-09 Amending Comprehensive Fee Schedule FY 2024-25 — reading text

Part 5 of 12. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-42020-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Res 2023- 14 09/26/23 Comprehensive Plan Text Amendment 925. 00 Res 2023- 14 09/26/ 23 Comprehensive Plan Future Land Use Map 2, 225. 00 Res 2023- 14 09/26/ 23 Amendment Rezoning 925. 00 Res 2023- 14 09/ 26/23 Land Development Code Text Amendment 925. 00 Res 2023- 14 09/ 26/23 Zoning Determination 35. 00 Res 2012- 15 06/26/ 12 Minor Plat 270.00 Res 2012- 15 06/26/ 12 Preliminag Plat 270.00 Res 2023- 14 09/ 26/ 23 Platting and subdivision, final Minimum $440. 00 or Actual Cost Res 2023- 14 09/26/ 23 Vacate Eassement, Right -of Way, - or Plat 520. 00 Res 2023- 14 09/26/ 23 Expansion of a Nonconforming Structure or 520. 00 Res 2023- 14 09/ 26/ 23 Characteristic of Use Special Events Application Fee 36.00 Res 2023- 14 09/ 26/ 23 Stationary Food Truck/Stationary Food Dispensing 100. 00 Initial Application/$ 100. 00 Renewal Fee Per Res 2019- 15 09/ 24/ 19 Vehicle Fee Year 150. 00 per diameter inch for total inches of protected Tree Mitigation Res. 2015- 1 01/ 13/ 15 trees removed at the time of mitigation Development Agreement 2,500.00 Res 2012- 15 06/26/ 12 Devel2pment Agreement Amendment 2,500.00 Res. 2016- 1109/20/ 16 Planned Unit Development Application 1, 650.00 Res 2012- 15 06/26/ 12 Pre -A lication Conference/ Pre- Construction 75. 00 Res. 2016- 1109/20/ 16 Posted Propeny Notice, per sip 45. 00 Res 2012- 15 06/26/ 12 Mailed Notices 21. 50 Res 2012- 15 06/26/ 12 Development Orders Application for Expedited Development Order 39. 00 Res 2012- 15 06/ 26/ 12 Application for Major Development Order 725. 00 Res 2012- 15 06026/ 12 Minor Amendment to Development Order 75. 00 Res 2012- 15 06026/ 12 Major Amendment to Development Order 450. 00 Res 2012- 15 06/ 26/ 12 Re -advertisement Fee Direct Cost of the Advertisement Res. 2016- 1109/ 20/ 16 Site Plan Reviews - new construction commercial or 4 units or more multifamily residential Gross Building Floor Area or Improved Site Area cost per 100 sq ft Res 2012- 15 06/ 26/ 12 whichever is greater Up to 5, 000 sq feet 1. 50 $ 1. 50 Res. 2010-25 09/ 28/ 10 Site Plan Review fee 15, 001 to 10,000 1. 35 $ 1. 35 Res. 2010-25 09/ 28/ 10 added to permit fee 10, 001 to 25, 000 1. 15 $ 1. 15 Res. 2010-25 09/ 28/ 10 25, 001 to 50, 000 1. 00 $ 1. 00 Res. 2010-25 09/ 28/ 10 50, 001 to 100, 000 0.90 $ 0. 90 Res. 2010-25 09/ 28/ 10 over 100, 000 0. 85 $ 0. 85 Res. 2010- 25 09/ 28/ 10 Departmew sisWor Enacting Resolution I Fce Dr%criplion Current Rate senicc Ordinance BUILDING PERMIT FEES Sec. 3. 02. 05 A surcharge will be collected in accordance with and for the purposes stated in F. S. 468.631 and F. S. 553. 721. Res. 2010- 25 09/28/ 10 General Fees Building permit processing fee 22. 50 Res. 2010-25 09/28/ 10 25. 75 per submittal SFD $ 51. 50 Revisions to approved permit, per submittal per submittal MF $ 77. 25 per Res 2008- 15 04/ 08/ 08 submittal Com Penalty for commencement prior to permitting Three ( 3) times the permit fee Res 2024- 13 09/ 24/ 24 Sec. 3. 01. 05) Change of contractor, transfer of permit Prorate balance of work Res 2003- 01 1! 28/ 03 Sec. 3. 01. 12) Notice of Commencement ( NOC) ( Sec. 713. 135) 5. 00 Expired permit ( Sec. 3. 01. 08) Re -issuance requires fee to be paid Res 07- 15 09/ 05/ 07 Conditional; no work has commenced and permit has Refund of permit fee ( Sec. 3. 01. 10) Res 07- 15 09/ 05/ 07 not expired; requires written notice to the BO Construction Permit Fees No permit required for cosmetic work only, such as carpet, tile, painting, landscaping, etc. Exceptions Res 07- 15 09/ 05/ 07 500 or less include any structural change or any work that requires an inspection per the FBC. 39. 00 for the first thousand, plus $ 6. 60 for each 501 to$ 50,000 Res. 2010- 25 09/ 28/ 10 Permit based on value thousand or fraction thereof, to and including $50,000 of work, includes labor, 360. 55 for fust $50, 000 plus $5. 25 for each materials, site work, 50, 001 to $ 100, 000 additional thousand or fraction thereof to and Res. 2010- 25 09/ 28/ 10 and design fees including $ 100, 000 623. 00 for the first $ 100,000 plus $4.00 for each 100, 001 to $500,000 additional thousand or fraction thereof to and Res. 2010- 25 09/ 28/ 10 including $500, 000 2,219.00 for the first $ 500, 000 plus $ 2. 75 for each 500, 001 and up Res. 2010- 25 09/ 28/ 10 additional thousand or fraction thereof Plan check fee 50% of building fee ( Sec. 3. 02.06) Res 2009- 35 09/ 09/09 Threshold building transmittal/ processing fee/ ICC 206. 00 Res 2008- 15 04/ 08/ 08 113. 50 Res 2008- 15 04/ 08/ 08 Moving Fee 59.50 plus $9.45 per 2, 000 sq ft above 20,000 sq ft Res. 2010- 25 09/ 28/ 10 Demolition Fee or fraction thereof Additional Inspection Fee 38. 00 Res. 2010- 25 09/ 28/ 10 Additional Inspection Fee - after hours 50. 00 per hour (2 hour minimum) Res

Download this text file with its original spacing ↓