READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 2025-09 Amending Comprehensive Fee Schedule FY 2024-25 — reading text
Part 5 of 12. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-42020-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Res 2023- 14 09/26/23
Comprehensive Plan Text Amendment 925. 00 Res 2023- 14 09/26/ 23
Comprehensive Plan Future Land Use Map 2, 225. 00 Res 2023- 14 09/26/ 23
Amendment
Rezoning 925. 00 Res 2023- 14 09/ 26/23
Land Development Code Text Amendment 925. 00 Res 2023- 14 09/ 26/23
Zoning Determination 35. 00 Res 2012- 15 06/26/ 12
Minor Plat 270.00 Res 2012- 15 06/26/ 12
Preliminag Plat 270.00 Res 2023- 14 09/ 26/ 23
Platting and subdivision, final Minimum $440. 00 or Actual Cost Res 2023- 14 09/26/ 23
Vacate Eassement, Right -of Way,
- or Plat 520. 00 Res 2023- 14 09/26/ 23
Expansion of a Nonconforming Structure or 520. 00 Res 2023- 14 09/ 26/ 23
Characteristic of Use
Special Events Application Fee 36.00 Res 2023- 14 09/ 26/ 23
Stationary Food Truck/Stationary Food Dispensing 100. 00 Initial Application/$ 100. 00 Renewal Fee Per
Res 2019- 15 09/ 24/ 19
Vehicle Fee Year
150. 00 per diameter inch for total inches of protected
Tree Mitigation Res. 2015- 1 01/ 13/ 15
trees removed at the time of mitigation
Development Agreement 2,500.00 Res 2012- 15 06/26/ 12
Devel2pment Agreement Amendment 2,500.00 Res. 2016- 1109/20/ 16
Planned Unit Development Application 1, 650.00 Res 2012- 15 06/26/ 12
Pre -A lication Conference/ Pre- Construction 75. 00 Res. 2016- 1109/20/ 16
Posted Propeny Notice, per sip 45. 00 Res 2012- 15 06/26/ 12
Mailed Notices 21. 50 Res 2012- 15 06/26/ 12
Development Orders
Application for Expedited Development Order 39. 00 Res 2012- 15 06/ 26/ 12
Application for Major Development Order 725. 00 Res 2012- 15 06026/ 12
Minor Amendment to Development Order 75. 00 Res 2012- 15 06026/ 12
Major Amendment to Development Order 450. 00 Res 2012- 15 06/ 26/ 12
Re -advertisement Fee Direct Cost of the Advertisement Res. 2016- 1109/ 20/ 16
Site Plan Reviews - new construction commercial or 4 units or more multifamily residential
Gross Building Floor Area or Improved Site Area
cost per 100 sq ft Res 2012- 15 06/ 26/ 12
whichever is greater
Up to 5, 000 sq feet 1. 50 $ 1. 50 Res. 2010-25 09/ 28/ 10
Site Plan Review fee 15, 001 to 10,000 1. 35 $ 1. 35 Res. 2010-25 09/ 28/ 10
added to permit fee 10, 001 to 25, 000 1. 15 $ 1. 15 Res. 2010-25 09/ 28/ 10
25, 001 to 50, 000 1. 00 $ 1. 00 Res. 2010-25 09/ 28/ 10
50, 001 to 100, 000 0.90 $ 0. 90 Res. 2010-25 09/ 28/ 10
over 100, 000 0. 85 $ 0. 85 Res. 2010- 25 09/ 28/ 10
Departmew sisWor Enacting Resolution I
Fce Dr%criplion Current Rate
senicc Ordinance
BUILDING PERMIT FEES Sec. 3. 02. 05
A surcharge will be collected in accordance with and for the purposes stated in F. S. 468.631 and F. S. 553. 721. Res. 2010- 25 09/28/ 10
General Fees
Building permit processing fee 22. 50 Res. 2010-25 09/28/ 10
25. 75 per submittal SFD $ 51. 50
Revisions to approved permit, per submittal per submittal MF $ 77. 25 per Res 2008- 15 04/ 08/ 08
submittal Com
Penalty for commencement prior to permitting Three ( 3) times the permit fee Res 2024- 13 09/ 24/ 24
Sec. 3. 01. 05)
Change of contractor, transfer of permit
Prorate balance of work Res 2003- 01 1! 28/ 03
Sec. 3. 01. 12)
Notice of Commencement ( NOC) ( Sec. 713. 135) 5. 00
Expired permit ( Sec. 3. 01. 08) Re -issuance requires fee to be paid Res 07- 15 09/ 05/ 07
Conditional; no work has commenced and permit has
Refund of permit fee ( Sec. 3. 01. 10) Res 07- 15 09/ 05/ 07
not expired; requires written notice to the BO
Construction Permit Fees
No permit required for cosmetic work only, such as
carpet, tile, painting, landscaping, etc. Exceptions Res 07- 15 09/ 05/ 07
500 or less
include any structural change or any work that
requires an inspection per the FBC.
39. 00 for the first thousand, plus $ 6. 60 for each
501 to$ 50,000 Res. 2010- 25 09/ 28/ 10
Permit based on value
thousand or fraction thereof, to and including $50,000
of work, includes labor,
360. 55 for fust $50, 000 plus $5. 25 for each
materials, site work,
50, 001 to $ 100, 000 additional thousand or fraction thereof to and Res. 2010- 25 09/ 28/ 10
and design fees
including $ 100, 000
623. 00 for the first $ 100,000 plus $4.00 for each
100, 001 to $500,000 additional thousand or fraction thereof to and Res. 2010- 25 09/ 28/ 10
including $500, 000
2,219.00 for the first $ 500, 000 plus $ 2. 75 for each
500, 001 and up Res. 2010- 25 09/ 28/ 10
additional thousand or fraction thereof
Plan check fee 50% of building fee ( Sec. 3. 02.06) Res 2009- 35 09/ 09/09
Threshold building transmittal/ processing fee/ ICC 206. 00 Res 2008- 15 04/ 08/ 08
113. 50 Res 2008- 15 04/ 08/ 08
Moving Fee
59.50 plus $9.45 per 2, 000 sq ft above 20,000 sq ft Res. 2010- 25 09/ 28/ 10
Demolition Fee
or fraction thereof
Additional Inspection Fee 38. 00 Res. 2010- 25 09/ 28/ 10
Additional Inspection Fee - after hours 50. 00 per hour (2 hour minimum) Res
