READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — July 15, 2014 — Change Order #1 - Building & Elevator Funding — reading text
Part 4 of 4. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 39-Change Order _1 - Building _ Elevator Funding.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
to TRIA. That portion of the premium
attributable is shown in the Schedule of this notice, If
TRIA terminates, the portion of this premium
attributable to the remaining part of the policy period
(es may be modified in accordance with the terms of
the policy) applies to the risk of loss from terrorism
after the termination of TRIA.
Disclosure of Federal Participation im Payment of
Terrorism Losses
‘The United States Government, Department of the
Treasury, will pay a share of terrorism losses insured
under the federal program. ‘The federal share squals
85% of that portion of the amount of such insured
losses that exceeds the applicable insurer retention.
The Act currently provides for no insurance industry
or United States government participation in
terrorism losses that exceed $106 billion in any one
calendar year. The federal program established by
Inclades copyrighted material af ISO Properties, Inc. with its permission.
‘Copyright Zorich American Insurance Company 2013
cC
the Act is scheduled to terminate at the end of
December 31, 2014 unless extended by the federal
government,
Posslbility of Additional or Return Preminm
‘The premium atiributable to the risk of oss from
certified acts of terrorism coverage is calculated
based on the coverage Gf any) in effect at ihe
beginning of the policy for certified sets of terrorism.
If your policy contains a Conditional Endorsement,
the termination of TRIA or extension of the federal
program with certain modifications (as explained in
that endorsement) may modify the extent of coverage
Gf any) the policy provides for terrorism. If TRIA
terminates or the Conditional Eudorsement becomes
applicable to the policy, the policy may be subject to
a return premium or additional premium, ff the fevel
or terms of federal participation change, the premium.
shown in the Schedule attributable to that part of the
policy period extending beyond such a change may
not be appropriate and we will notify you of any
changes in your premium.
U-GU-693-C CW (06/13)
Page 1 oft
oe _&
Builder’ s Risk information
Contractor: LeRD r| Ser
Contract Amount: le 3S fd; ZL d c+ New Construction Wf
Renovation []
Job Description: OkaslecsaA Ceithiry SHERIFFS
OF FG oe APP? FT Or
Length of Job: Aug GE pe JArutay 7 za
Location Address: S02 2Anwp Stre at, She L {NA Fy FL
Number of Buildings: ] Number of Stories: a.
Is Building Elevated? If yes, what type: / o
Square Footage of Each Building: ! 2, 429 O SF
Pre - éngweered Bather0eF
Construction Type of Each Bullding_w</ G7 Aer pene 3 eit? leat.
Roe kK 4°07 2°44 METAL SIDE G
ls this quote for an upcoming bid? Yes HM No 0
re Zz
if Yes, whatis the bid date?: > JaLy ° Projected Start Date? : Au G rr 2 ety
Is there a Morigagee? if so Name & Address:
Has slab been poured? Vv o if Yes, % complete:
TRANSMISSION VERIFICATION REPORT
TIME : 87/81/2614 18°29
NAME =: LORD & SON
FAX 1: 8588624984
TEL : 8568635158
SER. # : BROGBI8405¢3
DATE, TIME 87/81 18:26
FAX NG. “NAME WALDORFE
DURATION 98388219
PGGE(S)
RESULT OK
MODE: STANDARD
ECM
te on
~ Builder's Risk inf ‘ormation
Contractor: LekD 4 Sef:
Contract Amount 1.3 5 [vis Lhiennen Construction Ed Renovation [
Job Description: e) A Ce ee pp
OP Fae APPT OM |
: a
Length ofdob: swag G22 pe JAbuday 7
Location Address: SOY 2wp Stre ef, Shalt me Ly FL
Number of Buildings: ] Number of Stories: 2.
ts Building Elevated? f yes, what type: 3/7 oO
Square Footage of Bach Building: 12,4020 SF
7
Pre- enqgiveered Buster?
Construction Type of Each Building_w/_§ 7 tee fare bette ft ez
Roe Kk AXp 27 GA PETALS BIPJE SE
Bond Calculation - Standard Bond Rate
Fisrt $100,000
Up to $500,000
Subtotal
Florida Hurricane Tax
Total Bond
Contract Cost with Bond & Fee
Subtotal
Bond
Fee
Contract Total
Cost
100,000
206,730
306,730
lsum
5.00%
Rate
0.009
0.009
1.3000%
Bond Amount
900
1,861
2,761
36
2,797
289,327
2,797
14,606
306,730
Da Gate 200d Sheriff Office at- Shalimar, FL conngielen Be Spee | RE Ea el °
Update 02 ; age: tAiof 2A: | MB Progress bar © Sari milestone pain
ws Desaription Ram] Eeiiy any rot - : oN ae 7 a aT se t “Ber r TOY 1 DEE a
ae OTIC SICENIEEE im ec f imme ee he | ‘Bo br he Et —E EE Ti fe BS bt ees be peso ers oe eS ea
410 | Sheriff Coristruction Doe. Betinate O/OSMAY THA |23MAVIa A Sheriff Consifuction Doc Eslimate :
Fad O|ZeMAYI4 & | 20nAVIa A 08, Approved Const Doc Eat ite :
130 OOEMAV 14 A 123JUNISA iy ct ‘
782° |Geviechical Suivey ZisouNis four | id) of’ f * :
440 | Design Foundations SfoasuLt4 foruuusa [tay ol: : :
160 |Fab & Deliver Metal Bu 29/23UNTAA JO8AUGI4 | id] 12 : : Fab & Deliver Metal Building
462 [Bid Rebar 2lossuLt4 —ossuLta oro] . pit Bid Rebar
480 {Rebar Shop Drawings S/IQULT4 —_[1eJOL4 oo : a Rebar Shop Dibwings
370. |Approve Rebar ipsa [17sUL44 op 0) Apptove Reba
780 [Fab & Delve? Rebar B1euuLtd 24004 4 :
490 | Advertise for Bids O,OSMAY14A LIEMAY 140 :
200° | Sheriff Final Drawings 6) Z6MAY14.A [08JUL14 4 .
220 . | Review 100% Documents 2[ooJULi4 46JULT4 4d) 0] | .
230 | Bid Sherlifs Bulding isfiuii4 [awa adl 0 .
240 [Review GMP ‘jorauei4 [osAuGi4 | aay}
250 (Approved GMP 0 dauet | 4d] oO .
280. Bid Bemotition BIEPAINIAA JOTIULIA val OG
270 | Retieve Bids for Demolition Q onus 7d) O] « .
280 | Write Contract ZloasuLis fossuLta i) 0
280 ion of Concrete Paving slo7sulta [Adu 7a) 0
300 _|Pubiish Gonorele Fhd & Bldg gioaiULie /ieiuLid | td 6 Package .
310. | Mobilize Concrete Work Sjeiwucea [2ssults =f al 0
840 SeUNI4AOUULEA | dy eee
850 | Approve Elevator sonia “nua | tid] 8 “Ls Agpiove eval
860 _ Fab & Detiver Elevator 7Oliesul44 [Z30cTi4 | 41d] oO} * j Fab & Deliver Elevator
1100 | Mobilize Sheriff's Bldg BjoaAUGi4 [osauGts | sq] 0. ~~
4120 | Layout Foundations zlatwui1a [22uLid at 8
7130 _| Footings & Piers yol2euLia josAUGIe <td} 0 Footings & Piers
4132 Masonry Stem Walls “eliAuGia \isauGi4 | ed] 0 “ust Masonry
1140 [Prep Slab On Grade jolorseria i2Serm | 1a) 0]
4180 | Plumbing RA Slab On Grade S/oiseP%4 03sePi4 | 3d) ol
{460 [Electival RM Siab On Grade eloiser14 [o8sePi4 of 0
1170. [Fire Protection RM Stab On Grade 2lorser14 jo2sePia | 4d) 0
4180 | Pour Siab On Grade BitesEPia [i7sePia | td) 6 ‘
4190 [Eréct Pre-Enginoered Bldg Frame | 18)(1AUGia |2sauGia | 1d] | Erect PreEngineered Bldg Frai
7200 | Masonry Walls - Buin [1aSEP 4 [245EP14 | 1d) 0: : ii
1210. |Fiaming Roof Bldg Tie in s[25seP14 jotocTi4 | -id| 0
1220 | Roof Pre-Engineered Metal Bldg BloisePi4 [s0sePia | ad) 0 spaateag oo! Pre-Engineered Metal Bldg
4230 |Prep- Stab On Metat Deck 4|osseP14 [10SeP14 | ad) 0 -Lseammaisg Prep~ Slab On Metal Deck |
1240. [Pour Slab On Metal Deck a[visept4 [vSEP14 | 6d] | Pour Slab On Metal Deck
| Lorw.& Son Consiictton, tno,
Data Date: 23JUN14
‘Start Data: OoMAY 44 | RABE Eaily bar © — Finish niestone.polpt
Data Bate - Sheriff Office at Shalimar, FL Conloton Dale 2208014 passer
aa veserion | Sak | dak fee ee oe —— ne mn
41250 [Metal Siding. Pre-Engineered Metal A0)25SEP14 )O8OCT14 td Ofn * fn ig Pre-Engineered Meat Bldg
1260 | Light Gaugo Matal Frafting yojosooTia [avoctia | -tal ol. tight Gauge Metal Framing
4270 Hang & Finish Gypsum Board 40|2000T14 [3100T14 Ad cc z ‘Hang & Finish Gypsum Board
1280 Plumbing Wail & Ceiliag Rowg! S5{08OCTI4 /1500T14 3d Q
1290 | Ductwe A0;090CT14 12200714, aid 0!
41300 Insulate Ductwork 10 Wocri4 300CT14 id 0:
A340 jEiecitical Wall & Ceifiag Rough In 10)090CT14 |220CT14 9 Oo).
1320 | Electrical Pull Conductors 10|460CT14 |290CT14: 0: oO
4330 Fire Protection Rough 12{07GCT14 J2200T14 3d 0
4340. |Equipment Pads 4\46SEP14 /19SEP14 134 oO E
1350 {Set HVAC Equipment 4)22SEP14 |25SEP14. 13d 1 : aa
1860 | Hookup HVAC Equipment B/26SEP14 /O30CTi4 13d) Q ,
4370 |Stari Up HVAC 6/960CTI4 |100CT1I4 13d i} ,
4380 (Elevator 25) 03N0Vi4 §=|OSDECI4 $d Q
1390 [Prime & 1st Coat 7[siocri4 fionovis | -tdf of Prime & tet Coat
7400 Door & Hardware @OSNOVIa |teNoVia | Yd] 0 : Door & Hardware
1440 |Hard Tile 8/340CTi4 | 11NOVI4 42d 0. ¥ HadTie 7
1420 jp Casework S|MNOVI4 = |F7NOVIA 8S oO},
1430 Acoustical Ceiling Grid 4)UNOVId |adNovie “Ad 0
Tago Light Finures and Cel s[tNOWia faiNovia [al 0 {Light Fixtures and Celing Devices
1450 Grills & Registers apiaNOVia HENOvia i) Registers
4460, Acoustical Ceiling AVSNOVIE | 124NOVI4 oO 0! ‘
AG?O. | VCT.& Base Bi2Z5NOVIE F27NOVIE oO OF .
1480 Carpet Bj28NOVI4 JO2DECI4 o 0:
4490 | Plumbing Fixtuies 2/28NOViE JO1DEC14 o 0: .
4500 | Specialiics 2\02DECI4 |03DEC14 0 0!
4510 Electrical Trim B20NOVI4 |01DEC14 “td Q: ‘> Ra lect ‘al Trim
1520 jeomm, FA, Securily Tr 10)42NOV14 = |25NOV4I4 3d i) Ln erie Coinm, FA, ‘se wurity Tim:
1530 ht Paint §/02DEC14 § |08DEC14 “td iv Siti
640. Test & Balance To|tsnovia |2enovis | val 0 Lay Test & Balance
7550 [Close Out Documents 40|20NOV14 /O3DEC14 7) OO . eee lose Out Do:
7660 [Final Ciean gfosecta |tspecta | dl 6 ‘ Cy Final Clean
7870 linspection & Punch Out s[t@DEC14 [22DEC1a | id) oO Cesena sspection & |
1560 Turn Over Project | a2DECi4 | 1a; 0 tee Tum Over Pr