READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — April 5, 2016 — 2016 Solid Waste Procurement - FINAL — reading text
Part 20 of 35. These parts divide the reading text for browsing; they are not the source document's page numbers.
2016 Solid Waste Procurement - FINAL — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Contractor’s
Page 12
Note: Final Agreement terms and conditions will be modified based upon the residential service level selected by the Board
and final negotiations with the Successful Proposer upon Board approval.
Okaloosa County
Solid Waste and Recyclables Collection, Transfer, and Processing/Disposal Agreement
Attachment A: Draft Agreement
responsibility to exercise caution in relationship to the property of other authorized
users.
3.9.4.2. Contractor shall take care to prevent damage to all public and private property while
conducting services pursuant to this Agreement, including, but not limited to, buildings,
monuments, markers or fences, vehicles, pipes and underground structures, storm
water inlet covers, gutters, curbs, public streets, trees and tree canopies, flowers,
shrubs, and other plantings. The County acknowledges this does not preclude normal
wear and tear of streets resulting from normal use by Contractor.
3.9.4.3. Contractor shall immediately notify the Contract Manager of any personal injury or
damage to public or private property caused by Contractor during the provision of
collection services. Wherever such property is damaged due to the activities of
Contractor, it shall be immediately restored to its original condition by Contractor at
Contractor’s expense.
3.9.4.4. In case of failure on the part of Contractor to restore such property or make good such
damage or injury, the County may, upon forty‐eight (48) hours written notice to
Contractor, proceed to repair, rebuild, or otherwise restore such property as may be
deemed necessary and to bill the cost to Contractor. If any damage caused by
Contractor impacts the safety, health and welfare of the County’s citizens, the repairs
will be arranged by the County and billed to Contractor based on the actual cost
incurred to repair the said damages, plus ten percent (10%) to account for the County’s
administrative costs.
3.9.5. Spillage and Littering
3.9.5.1. Contractor shall not litter or cause any spillage to occur upon the premises or the right‐
of‐way wherein the collection and transport of materials shall occur. During
transportation, all collected materials shall be contained, tied, or enclosed to prevent
leaking, spilling and blowing.
3.9.5.2. In the event of any confirmed spillage/leakage/blowing from a Contractor’s vehicle,
Contractor shall promptly, at least within twenty‐four (24) hours, clean up all
spillage/leakage/blowing at no cost to the County. Contractor is responsible to clean
such spills, leaks, or blown materials to the satisfaction of the Contract Manager up to,
and including, resealing or resurfacing depending on the severity of the damage.
3.9.6. Employee Training and Licenses
3.9.6.1. All of Contractor’s employees shall be qualified and appropriately trained for the tasks
assigned to them. Contractor shall provide refresher courses and additional training to
its employees, as needed, to ensure compliance with the requirements of this
Agreement and all Applicable Law. The County has the right to review Contractor’s
training records.
3.9.6.2. At all times when operating vehicles or equipment pursuant to this Agreement,
Contractor’s employees shall carry a valid Florida driver's license for the type of vehicle
or equipment being operated.
3.9.7. Office Requirements
3.9.7.1. Contractor shall maintain an office in the County to remain open from 8:00 a.m. to 5:00
p.m. CDT, Monday through Friday, except Holidays, to handle customer complaints and
where bills may be paid.
3.9.7.2. Contractor shall maintain a local telephone number routed to the local office (per Article
3.9.7.1) where service inquiries and complaints can be received by Contractor.
Page 13
Note: Final Agreement terms and conditions will be modified based upon the residential service level selected by the Board
and final negotiations with the Successful Proposer upon Board approval.
Okaloosa County
Solid Waste and Recyclables Collection, Transfer, and Processing/Disposal Agreement
Attachment A: Draft Agreement
Contractor shall use either a telephone answering service or answering machine to
receive service inquiries and complaints during those times when the office is closed.
During office hours, these services must be monitored regularly, so that Contractor can
respond to any message within sixty (60) minutes. The response, at a minimum, shall
include a reply to the inquiry and a plan of action to address or fix the complaint. During
non‐office hours, messages shall be answered no later than noon the following business
day.
3.9.7.3. Contractor’s office shall be equipped with adequate and appropriate personnel and
equipment to receive, document, and respond to inquiries, issues, and complaints in a
timely manner. Contractor’s office staff shall be familiar with the County and
Contractor’s obligations under this Agreement.
3.9.7.4. Contractor’s customer service representatives shall be properly trained to answer
questions concerning residential, multi‐family, and commercial recycling and Solid
Waste Collection Services.
3.9.7.5. Contractor shall establish a process, subject to the Contract Manager’s approval, for
receiving and handling emergency calls, both during and after normal operating hours.
3.9.8. Customer Service Standards
3.9.8.1. Contractor shall be responsible for providing the highest quality service to all Residential
and Multi‐Family Customers under the provisions of this Agreement.
3.9.8.2. Contractor shall resolve all complaints as expeditiously as possible and shall take
whatever steps are necessary to remedy the cause of a complaint within twenty‐four
(24) hours after receiving a complaint from a customer or the County.
3.9.8.3. If the County receives a complaint regarding Contractor’s service under this Agreement,
the complaint shall be immediately forwarded to Contractor by telephone or electronic
communication.
3.9.8.4. Contractor shall keep a written record of all calls it receives (either directly or through
the County) regarding Contractor’s service under this Agreement in a format approved
by the Contract Manager. Contractor shall use a standard form to record the pertinent
facts regarding each call and how it was resolved. The form shall identify complaints
including customer name, type – Residential or Multi‐Family Customer, contact
information, the time and date when a complaint was received, when Contractor
responded to the complaint, and the date and time when the complaint was resolved.
Contractor’s records and forms shall be kept up to date and a record of all calls shall be
submitted monthly to the Contract Manager as outlined in Article 8.4. In addition,
Contractor’s records and forms shall be maintained throughout the term of this
Agreement. Copies of the calls logs shall be kept at Contractor’s office in the County
and shall be available for inspection by the Contract Manager during normal business
hours.
3.9.8.5. Missed Collections: If the County or customer notifies Contractor before 12:00 p.m. of
a missed collection Monday through Friday, Contractor shall return to the customer's
premises before 6:00 p.m. the same Day of the notification and collect all of the Solid
Waste or Program Recyclables that have been set out for collection. If Contractor is
notified after 12:00 p.m. Monday through Friday of a missed collection, collection shall
be made by 12:00 p.m. the next Day following notification. Notifications received
Saturday or Sunday shall be corrected before 12:00 p.m. on Monday. All missed
collections shall be included in the complaint log.
Page 14
Note: Final Agreement terms and conditions will be modified based upon the residential service level selected by the Board
and final negotiations with the Successful Proposer upon Board approval.
Okaloosa County
Solid Waste and Recyclables Collection, Transfer, and Processing/Disposal Agreement
Attachment A: Draft Agreement
3.9.8.6. Contractor shall notify the Contract Manager regarding any disputes that have not been
resolved within twenty‐four (24) hours after receiving the complaint. Contractor may
request, and the Contract Manager may grant, additional time to remedy a complaint
when necessary. If a dispute is not resolved to a customer’s satisfaction, the County
shall have the authority to determine how the dispute will be resolved.
3.9.9. Vehicle and Collection Equipment
3.9.9.1. Contractor shall maintain a dedicated fleet of frontline collection vehicles designated to
collect Solid Waste and Recyclables from Residential Customers in the Service Area.
3.9.9.2. No single frontline vehicle used to fulfill the services in this Agreement shall exceed a
maximum age of eight (8) years; no single reserve vehicle shall exceed a maximum age
of ten (10) years. The County reserves the right, at its discretion, to require a vehicle be
taken out of service for habitual maintenance
