Okaloosa County BOCC — December 2, 2014 — Action Item Printout — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 67-Action Item Printout.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: December 2, 2014 TO: Honorable Chairman and Members of the Board FROM: Jason Autrey SUBJECT: Baker Landfill - 2015 Semiannual Sampling and Reporting DEPARTMENT: Public Works BCC DISTRICT: STATEMENT OF ISSUE: Professional services are required for compliance with Florida Department of Environmental Protection (FDEP) Permit/Certification #0075982-006-SF which addresses long term care of the Baker Landfill. Professional services are also required to comply with the FDEP Remedial Action Approval Order dated September 2, 2008. BACKGROUND: Baker Landfill has two FDEP regulated environmental interests - Long Term Care (LTC) and Corrective/Remedial Action. LTC is an FDEP permitted activity that requires monitoring of groundwater from a designated network of sampling locations. The County has been performing this compliance monitoring since the landfill was closed to land filling activities in 1998 and was permitted for LTC status in 2003. Since that time, the County has complied with the permit through sampling of the monitoring network. The FDEP directed the County to initiate Corrective Actions in 1989 due to the detection of chemical constituents in the groundwater exceeding FDEP water quality standards. The FDEP approved the County’s Contamination Assessment Report in 1993 and the County began the design of a Remedial Action Plan in (RAP) 1994. Several iterations of the RAP were produced over the next few years and FDEP approved the County’s remediation plans in 2002. The remedial action system became operational in 2004. Based on operational observations, the remediation system has been slightly modified since becoming operational. After two years of operation, the remediation system was shut down in September 2006 to address a compromise of the liner system in one of the treatment ponds. The remediation system was not reactivated until August 2008. Due to lack of maintenance and down-time, the remediation system was not operating fully until May 2009. Current assessments of the operational characteristics of the system indicate that the system is not performing to design specifications for a variety of reasons. The most recent RAP Modification was approved by the FDEP in 2011 paving the way for substantial infrastructure changes completed in 2013 which will ultimately result in substantial reductions in the cost of restoration activities. Both Long Term Care Semi-Annual Compliance and Remedial Action Assessment monitoring are budgeted activities. The activities in this Task Order address services to be performed in FY2015. In order to meet LTC Permit and Remedial Action requirements, the LTC and RAP Mod requires professional services to execute two sampling/reporting events at a proposed price not to exceed $75,600. OPTIONS: Approve/Disapprove the Preble-Rish Task Order proposal (attached) for sampling and reporting associated with Baker Landfill not to exceed $75,600. Preble-Rish is a Board approved Engineering Services provider to the Public Works Department under contract C14- 2081-PW through September 30, 2016. RECOMMENDATIONS: Approve the Preble-Rish Task Order proposal. RECOMMENDED BY: APPROVED BY: John Hofstad, Interim County Administrator

Download this text file with its original spacing ↓