READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — May 20, 2014 — 2010 Implementation Plan (Updated) — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 123-2010 Implementation Plan _Updated_.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

IMPLEMENTATION PLAN PRELIMINARY BUDGET AND SCHEDULE FY 2010 FY 2011 FY 2012 FY 2013 Total Proof-of-Concept, Land Acquisition and Permitting 1 1 1. Preliminary Geotechnical Analysis $15,000 /$65,000 $15,000 /$65,000 1 1 2. Safe Yield Analysis on Shoal River and Unnamed Tributary $50,000 $50,000 1 1 3. Phase I Environmental Site Assessment $8,000 $8,000 4. Site Evaluation – WTP, Raw Water Intake, RWPS and Conveyance Sites $75,000 $75,000 1 1 5. Land Appraisal – WTP, Raw Water Intake, RWPS and Storage Reservoir $20,000 $20,000 1,2 1,2 1,2 6. Land Acquisition – WTP, Raw Water Intake, RWPS and Storage Reservoir $TBD $TBD $TBD 1 1 7. Wetland Investigation and Permitting $75,000 $50,000 $75,000 /$50,000 1 1 8. Cultural Resource Investigation $35,000 $35,000 Preliminary Evaluation of WTP, Raw Water Intake, RWPS, Conveyance, and Storage Reservoir 1. Shoal River Water Quality Characterization and Treatment Alternative Evaluation $50,000 $50,000 2. Bench-Scale Treatability Study $100,000 $100,000 3. Pilot-Testing of Treatment Alternatives (if needed) $50,000 $75,000 $125,000 4. Treatment Alternative Selection $30,000 $30,000 5. WTP, Raw Water Intake, RWPS, Storage Reservoir and Conveyance System Facility $300,000 $300,000 Plan Existing System Evaluation 1. Hydraulic Model and Evaluation of Distribution System $150,000 $25,000 $175,000 2. Water Demand Projections $40,000 $40,000 2 2 2 Total Cost (NWFWMD) $203,000+TBD $TBD $0 $0 $203,000+TBD Total Cost (OCWS) $140,000 $140,000 $300,000 $430,000 $1,010,000 Activities highlighted in Green are complete. Activities highlighted in Yellow are underway.

Download this text file with its original spacing ↓