READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 04-08-08 regular agenda — reading text
Part 14 of 15. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-15409-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Council agreed to participate in the drafting of an interlocal
agreement on public school facility planning. Mayor Anderson executed a Grant Agreement
between Okaloosa County Board of Commissioners and the City of Fort Walton Beach. The
Interlocal Agreement, Resolution 2007 -03, establishes a common procedure to be followed
whenever new facilities are being developed within the City of Fort Walton Beach, or existing
schools are proposed to close.
The Department of Community Affairs ( DCA) awarded a pilot grant to the City and participating
municipalities in our interlocal agreement for the purpose of the West Florida Regional Planning
Council developing the data and analysis for the PSFE. The Senior Planner has participated in
the ongoing development of the Public School Facilities Element through participation in Local
Mitigation Strategy Committee Meetings. In February, 2008, the West Florida Regional Planning
Council concluded the data and analysis for the Element.
A summary of the Element includes the following:
The City of Fort Walton Beach exists within the County's newly established Concurrency
Service Areas ( CSA) 5 and 6. CSA' s are established on a less than district -wide basis, as
depicted on Map PSFE A and described in the Concurrency Service Area Boundary
Descriptions ( pages 42 thru 47) in the Data and Analysis.
Each CSA boundary is delineated considering the following criteria consistent with provisions in
the Interlocal Agreement:
a. School locations, student transporting times, and future land uses in the area.
b. Section lines, major traffic -ways, natural barriers and county boundaries.
Each CSA demonstrates that:
a. Adopted level of service standards will be achieved and maintained for each year of the five -
year planning period; and
b. Utilization of school capacity is maximized to the greatest extent possible, taking into account
transportation costs, court approved desegregation plans and other relevant factors.
Consistent with s. 163.3180( 13)( c) 2., F. S., changes to the CSA boundaries will be made only by
amendment to the PSFE and will be exempt from the limitation on the frequency of plan
amendments. Any proposed change to CSA boundaries will require a demonstration by the
School District that the requirements of 2( a) and ( b), above, are met.
Concurrence Service Area 5
CSA 5 contains eight schools ( 5 elementary, 2 middle and 1 high school) and includes extreme
South Okaloosa County, in an area that runs along the coastline from the Santa Rosa County
Line ( Florosa) to the Walton County line including the City of Destin and Okaloosa Island.
3
This CSA has the highest population of the six CSAs. Public school enrollment in CSA 5 was
5,552 for 2007 -08 and is expected to increase by 79 students by year 2011 -12. ( Table 26, Data
and Analysis.)
Currently, there are no schools operating over 100% of permanent capacity. In addition, there
is no existing or projected facility surpluses or deficiencies district wide for any school type.
There are existing and projected facility surpluses and deficiencies within concurrency service
areas. To meet class size contingencies and to reduce the use of relocatable facilities the
following enhancements are included as funded projects in the Work Program:
Shalimar Elementary —classroom additions ( permanent and relocatables)
Wright Elementary- classroom additions ( relocatables)
No additional land is required and supporting infrastructure is adequate to support these
enhancements ( EAR). No additional ancillary facilities will be required to support the 5 -Year
Facilities Work Program for projects in CSA 5.
The projected 2007 -2012 LOS for Service Area 5 is 76% ( Data and Analysis; Page 43, Table
26: Concurrency Service Area 5 — 5 -Year Facilities Work Plan).
Concurrence Service Area 6
Concurrency Service Area 6 includes extreme South Okaloosa County in an area that runs
along the coastline from the Santa Rosa County line ( Florosa) to the Walton County line
including the City of Destin and Okaloosa Island. It is surrounded by Eglin Air Force Base the
intercostal waterway and the Gulf of Mexico and shares part of the coastline with the Eglin
kaw Reservation. The Cities of Fort Walton Beach, Mary Esther, and the Town of Cinco Bayou are
also in CSA 6 and just like CSA 5 it has 8 schools ( 5 elementary, 2 middle and 1 high school).
The 2004 population of this CSA was 47, 156 persons housed in 29, 105 dwelling units. This
service area is expected to increase by 8, 177 persons and 4,653 dwelling units by 2025.
Okaloosa- Walton TPO) Public school enrollment in CSA 6 was 6, 420 for 2007 -08 and is
expected to increase by 143 students by year 2011 -12.
Currently, there is one school operating at over 100% of permanent capacity. It is Destin Middle
School at 105% of capacity. There are existing and projected facility surpluses and deficiencies
within concurrency service areas. To meet class size contingencies and to reduce the use of
relocatable facilities the following enhancements are included as funded projects in the Work
Program:
Mary Esther Elementary —classroom additions ( permanent and relocatables)
Florosa Elementary —classroom additions ( relocatables)
No additional land is required and supporting infrastructure is adequate to support these
enhancements ( County's EAR). No additional ancillary facilities will be required to support the
5 -Year Facilities Work Program for projects in CSA 6. The School District owns no vacant land
in this CSA.
The adopted level of services ( LOS) for school capacity is 100% permanent enrollment
capacity. The projected 2007 -2012 LOS for Service Area 6 is 94% ( Data and Analysis; Page 46,
Table 29 Concurrencyy )Service Area 6 — 5 -Year Facilities Work Plan).
4
The Department of Education permanent Florida Inventory of School Houses ( FISH) capacity is
kw' adopted as the uniform methodology to determine the capacity of each school. School
enrollment is based on the annual enrollment of each school based on actual counts reported to
the Department of Education in October of each year in order to formulate the Capital Outlay
Full Time Equivalent ( COFTE) standards.
RECOMMENDATION:
The Municipal Planning Board ( MPB) considered Ordinance 1757 at a special meeting on
Thursday, March 20, 2008. There were no public comments. The MPB recommended that City
Council approve the request by unanimous vote.
Ordinance 1757 is now ready for consideration by City Council on first reading at their regular
April 8, 2008 meeting.
The City Council may:
a. Approve Ordinance 1757;
b. Approve Ordinance 1757 with changes;
c. Disapprove Ordinance 1757.
Encl.: Minutes of MPB March 20, 2008 Special Meeting
Ordinance 1757
PSFE data and Analysis
Minutes of MPB March 20, 2008 Special Meeting
Concur
Do not Concur
Hold for Discussion
A%
Mokk
U Shanahan —City Manager
W-
MINUTES OF THE SPECIAL MUNICIPAL PLANNING BOARD MEETING
OF THE CITY OF FORT WALTON BEACH, FLORIDA
March 20, 2008
INTRODUCTION
A Special Meeting of the Fort Walton Beach Municipal Planning Board was held on Thursday,
March 20, 2008 at 5: 30 p. m. in the Council Chambers, 107 Miracle Strip Parkway SW, with the
following members present:
Janet Wilson, Chairman; Glenda Glover, Vice Chairman; Lee McDonald; Al Sterns; Jim Tucker;
and Darrell White
Also present: Missy McKim, CDS Director; Samantha Abell, Senior Planner
Absent: Charles Scott ( unexcused); Toni Craig, City Attorney; Howard Hill, Okaloosa County
School Board ( Ex- Officio); and Larry Green, Chief, Eglin Mission Enhancement Office ( Ex-
Officio)
CALL TO ORDER/ ROLL CALL
The Chairman called the meeting to order and roll call was taken.
ORD. 1759, PROPORTIONATE SHARE MITIGATION
The Vice Chairman read the ordinance by title.
AN ORDINANCE OF THE CITY FORT WALTON BEACH, FLORIDA,
COUNCIL OF
PROVIDING AUTHORITY; AMENDING CHAPTER 12. 32, CONCURRENCY, VOLUME IV OF
THE LAND DEVELOPMENT CODE OF THE CITY OF FORT WALTON BEACH, BY
ADOPTING SECTION 12. 32. 11, ENTITLED PROPORTIONATE FAIR SHARE MITIGATION;
ADOPTING PROVISIONS FOR PURPOSE AND APPLICABILITY' ESTABLISHING GENERAL
REQUIREMENTS FOR AN APPLICANT DEVELOPER TO SATIFY TRANSPORTATION
CONCURRENCY REQUIREMENTS BY MAKING PROPORTIONATE FAIR SHARE
CONTRIBUTION; PROVIDING FOR INTERGOVERNMENTAL COORDINATION;
ESTABLISHING AN APPLICATION PROCESS AND METHOD FOR DETERMINING
PROPORTIONATE FAIR SHARE OBLIGATIONS AND IMPACT FEE CREDITS FOR
MITIGATION; AUTHORIZING PROPORTIONATE FAIR SHARE AGREEMENTS; PROVIDING
FOR APPROPRIATION OF AND ACCOUNTING FOR FAIR SHARE REVENUES; PROVIDING
FOR PROPORTIONATE FAIR SHARE ASSESSEMENTS IN TRANSPORTATION
CONCURRENCY EXCEPTION AREAS, CONCURRENCY
TRANSPORTATION
MANAGEMENT AREAS, AND MULTIMODAL TRANSPORTATION DISTRICTS; PROVIDING
FOR CROSS JURISDICTIONAL IMPACTS;. PROVIDING FOR CONFLICTS AND
SEVERABILITY; AND SETTING AN EFFECTIVE DATE.
Samantha Abell, Senior Planner, explained that the 2005 Florida Legislature passed several
amendments to Growth Management Legislation, including a requirement to adopt
proportionate share The legislation requires that local governments adopt an
mitigation."
ordinance to allow developers to satisfy transportation concurrency requirements, in certain
circumstances, by proportionate fair -share contributions. Ms. Abell informed that proportionate
fair -share is applied when a developer has applied for a Development Order and fails
concurrency. When this happens, the developer can enter into a proportionate fair -share
agreement with the local government, whereby the developer agrees to fund all or a portion of a
future transportation project to mitigate impacts.
C
Special MPB 3- 20- 08
ORD. 1759 ( CONT)
Ms. Abell continued that agreements are only to be executed for projects that can provide the
required transportation concurrency ( be under construction) within the fourth and fifth years of
the Adopted Five -Year Work Program, or that will be under construction within 10 years of the
execution of the proportionate fair -share agreement if the transportation facility is in a long -term
transportation concurrency system.
The Board received clarification that any funds provided by a developer for this purpose cannot
be used for any other transportation facilities; that the City has not had any objections to this
ordinance from any developers; that the project would have to be built within five years in Fort
Walton Beach and under construction within three; and that the City is mandated by the State to
adopt this ordinance, but how we
