QUALITY AND AVAILABILITY OF ADEQUAT FRASTRUCTURE
THROUGHOUT THE CRA
Objectives:
Continue Sidewalk and Pavement Improve
hout the
or Extending
Aging infrastructui a sig scant impedi o successful redevelopment. While Fort
Walton Beach is a
utility lines
a
to
tree `
ology
r b growth, deficiencies still exist such as
s. A continual program for updating
ore attractive for redevelopment, in turn, attracting more
messes,
The CRA main nnual s walk and pavement improvement Capital Improvement Programs
CIP). The purp f pavement improvement program is to perform preventative
maintenance on roa prevent them from deteriorating to a point requiring a complete
rehabilitation. The could also consider utilizing funding to match needed road
improvement projects including capacity projects, congestion management, and other
transportation projects, including bike lanes.
The annual sidewalk improvement program is designed to increase pedestrian safety and provide
a pedestrian- friendly urban environment in the CRA. The sidewalk program should consider the
classification of each road, as some roads require wider sidewalks further away from the main
street.
City of Fort Walton Beach June 2012
2012 Community Redevelopment Plan
1. Continue the annual pavement improvement program and possibly expand the program to
include other road improvement projects, such as capacity building, bicycle lanes, congestion
management, and enhanced pedestrian features.
2. Continue adding sidewalks and improving existing sidewalks where needed. If possible,
construct wider sidewalks, allowing for multiple modes of non -motorized transit to occur
simultaneously. Develop a prioritized list of sidewalk improvement rojects.
less attractive for
Aging and failing water and sewer lines make the Fort W
redevelopment compared to newly built areas. Upgradi ommodate higher
density may attract more developers to the CRA.
1. Consider implementing a yearly program to uti funds to complete needed
underground infrastructure in the Though infra can be costly to update, this
program can attract developers into and make more competitive compared
to other newly built areas.
2. Offer incentives to incoming develop lopment Infrastructure grant
program, that may up to 75° o enses necessary to upgrade
infrastructure for i m ercial and in the CRA.
In many
primarily, e to
dump may be to
Ho areas with
narrow st the proli
In addition, dumpsters, whether currently in use or provided to
meet this objective, should be screened from view to the maximum extent possible.
June 2012
City of Fort Walton Beach
2012 Community Redevelopment Plan
Strategy
1. Develop a program for establishing joint use dumpsters in areas now cluttered with
individual garbage cans.
2. Provide financial incentives for installing screening or landscaping to buffer existing
dumpsters to improve the appearance of these facilities throughout the CRA.
Traditional overhead utility lines connected by utility poles can e visual clutter and inhibit
urban center development patterns. Placing utilities lines and od contributes to an overall
pedestrian- friendly environment and may prove to be safer able during hurricanes
and other natural disasters. Converting overhead utilities ou lities is not without
its drawbacks. Therefore, the CRA should conside e of an r2round utilities
program and should evaluate the cost benefit for ea dividual prod ect.
The City has completed several steps towards beg V.
erground uynties program,
including a Feasibility Study in 2007 and obtaining from Gulf Power for the Eglin
Parkway corridor. If the CRA wishes t ursue under, ities, several more steps must be
taken.
1. Coordinate with Gulf produce bi estima r converting overhead utilities to
underground along Lors, such as in Park y, Brooks Street, and Miracle Strip
Parkway.
i e the entire project in one or more phases.
underground utilities project including: the
construction pole, additional mobilization costs,
zrers during different bids, and additional set -up
3. CoordinAdWith Gulf r for placement of utility lines in alleys, especially during
to create or extend alleys and when underground placement is
not feasible.
4. Continue the CR4VStreetscape grant program, which provides matching funds to private
businesses for underground utilities.
Several streets in the CRA have excess right -of w - ay that is currently underutilized. In some
areas, the right -of w
- ay can be " transferred" to alleyways. Extending and creating alleyways
June 2012
City of Fort Walton Beach
2012 Community Redevelopment Plan
allows pedestrians a place to walk far away from traffic and noise and also allows businesses
adequate space for storage and loading /unloading.
1. Implement a pilot study that will decrease the right -of w- ay ( ROW) on Chicago Avenue and
extend the alley that currently exists parallel to Chestnut Avenue and Chicago Avenue and to
the south of Oak Street. Extend that alley north to Ferry Road and south to First Street.
2. Based on the success of the alley extension pilot study, more al may be created and/ or
extended.
June 2012
City of Fort Walton Beach
2012 Community Redevelopment Plan
COMPONENT 3 - TRANSPORTATION
TRANSPORTATION GOAL:
ENSURE THE AVAILABILITY OF AN ADEQUATE AN 1NULTIMODAL
TRANSPORTATION SYSTEM THROUGH CRA
Objectives:
Improve Safety Through Installing c - Calming Congestion
Management Design Features
Promote the Use of and Enhance the Ava sit Facil
Continue to Promote Walkable Areas T the CRA Through the
Installation of Pedestrian -Frien Features
Ensure Adequate Bicycle Facil
Ensure Adequate and Accessible
The transportation
and unsafe at times.
Eglin
33, 500
Duet Pim
Theretore, important tol
the CRA, s enhanced
and traffic cal techni
increasingly impo n o
the CRA.
When traffic volumes approach or exceed capacity during peak hours or seasons, the resulting
congestion reduces mobility. Congestion management can include roadway design practices such
as limiting the number of driveways on arterials, installing needed turning lanes, intersection
improvements, rerouting through -traffic, and traffic signal synchronization. Other congestion
management strategies include ways to actually reduce capacity by encouraging other modes of
City of Fort Walton Beach June 2012
2012 Community Redevelopment Plan
transportation including transit service, walking, and bicycling. Traffic calming principally
involves managing vehicle speed, modifying drivers' behaviors, and reducing traffic volume in
order to increase the safety level for all modes of travel. The most common practices for traffic
calming include installing speed tables, medians, street trees, pavement treatments, signage, and
diverters.
SR 85 ( Eglin Parkway) Undivided 6 -lane major arterial KMedianrovements, continuous
sidewalks,
surrounded
by primarily mproved
underground
commercial land uses, including alks,
Uptown Station proved pedestrian
continuous curb cuts,
al circulation
US 98 ( Miracle Strip 4 -lane divided major enal Improved p an crossings;
Parkway) carrying through tr from forced speed li oks Bridge
Pensacola to Pana ow i ovements; wid nd improved
speed limit, new stree de lks west o Brooks Street;
downtown; tree -lined medians treetscaping west of Brooks Street
SR 189 ( Beal Parkway) Undivided 4- nor arterial ved sidewalks, additional