READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — July 7, 2015 — FY16 SMP - compressed — reading text

Part 8 of 8. These parts divide the reading text for browsing; they are not the source document's page numbers.

FY16 SMP - compressed — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

197 Chicago Takeover – Movie Theaters • :30 second On-Screen • :30 second Lobby Plasma Screens • Life-size Lobby Standees • Mobile & Online Pre- Roll :15 and :30 second • Pre/Post Research Study • 2 months of activity • 153,552 :30 second spots • 457 targeted neighborhood movie screens • 6,293,286 minimum Gross Impressions • Cost: $250,000 198 Chicago Takeover - Transit • Head House Panel: 86” H x 385” W • Thirty (30) Digital Panels at street level, airing video 960 plays per day each screen • 2 months of activity 199 Chicago Takeover - Transit • In addition to the Head House displays & Urban Panels (base plan): • A second Head House as in base plan • Twenty (20) Train Display Panels • Super Rail Kings • Reaches commuters, pedestrians & motorists • Size & scale leaves a lasting impression • 2 months of activity • 101,121,132 minimum Gross Impressions • Cost: $259,000 200

Download this text file with its original spacing ↓