Unit.
• The Unit to be assessed does not necessarily include an entire
subdivision if the entire subdivision does not materially benefit from the
proposed action.
• Units may be established in unplatted residential areas where the
proposed action benefits the property in a definable geographic area.
12
• Units must contain a minimum of two distinct taxable (or platted) pieces of
property.
3. Contact person and proposed liaison names, addresses and phone numbers.
4. $100.00 application fee made payable to the Board of County Commissioners,
Okaloosa County.
Application Review/Preliminary Engineering Report
Upon receipt of the application for a MSBU, a letter may be mailed by U.S Postal first-
class mail to each property owner advising of the application’s submittal and the
imminent petition process. The Unit Commissioner may request an informative meeting
with the property owners to discuss the MSBU process. Upon request by the Unit
Liaison and with sufficient notice, Public Works is available to attend any community
meetings concerning the establishment of the Unit. Notification to property owners of
any County-sponsored meeting will be coordinated through Public Works. Public Works
would appreciate the opportunity to review any correspondence relating to the
establishment of the Unit prior to circulation.
Public Works will review the items submitted as part of the application to confirm that
the information is complete. The application will then be forwarded to appropriate
departments for review of the scope of work and plat information.
Preliminary engineering is required for sidewalk and roadway/drainage construction or
replacement.
• All engineering and construction will be provided by County staff, contingent
upon approval by the Board of County Commissioners, up to the financial
limits as set forth by Florida State law. Projects exceeding the statutory limits
or staffing capabilities of the County will be competitively bid out for design
and/or construction.
• All material costs will be funded by the MSBU.
County staff will present any requests for County participation in capital projects to the
Board of County Commissioners for consideration.
Petition Submission
The Board of County Commissioners has determined that a petition serves as an
indicator of the amount of community interest for a proposed project.
13
The petition shall reflect the cost for preliminary engineering and the cost estimates for
final engineering and construction, provided by the preliminary engineering report. The
petition shall also reflect the appropriate reserves, contingencies, administrative fees
and interest expense during the construction period. The petition shall be prepared with
assistance from the Public Works Division and the Unit Liaison.
County staff will identify a date for petition return of 30-60 calendar days based upon
target time frame for public hearing and upon length of time cost estimates will be valid.
Petition Acceptance
The petition, to be considered, must be signed by at least 66% of the current property
owners (number of owners) representing at least 66% of the assessed properties
(number of lots) within the proposed Unit boundaries.
• A property owner is the individual or group of individuals that own a parcel of
land.
• Okaloosa County Property Appraiser and Tax Collector data shall be used to
determine eligible signatures of owners. All of the non-related current owners
of a parcel or the designated trustee must sign the petition for the ownership
and parcel to count towards the 66% requirements.
• Once submitted, names may not be withdrawn from the petition.
Upon return, County staff will review the petition for sufficiency.
No petition will be accepted without the signatures of all property owners who
would be required to dedicate right-of-ways or easements to the County.
If the petition is accepted, Public Works will request that the Board of County
Commissioners authorize a public hearing for consideration of the ordinance to
establish the Unit. Please note that once the petition is accepted and a public hearing is
authorized, the petition is not conclusive to the final determination by the Board of
County Commissioners to proceed (or not) with the project. The final determination of
the scope and feasibility of a project will be determined by Okaloosa County.
Public Hearing
When the proposed ordinance and all documents are in order and a public hearing date
is scheduled, legal notices will be published. In addition, notification will be mailed by
U.S Postal first-class mail to all property owners listed on the tax roll within the
proposed Unit.
14
No public hearing will be scheduled unless all affected property owners have agreed to
dedicate the necessary right-of-way to the County.
At the public hearing, the Board of county Commissioners may consider comments,
objections, and information relevant to the creation of the Unit. The County
Commissioners may amend, enact, or deny the proposed ordinance.
Implementation
Final engineering plans are prepared by County staff for construction projects to include
sidewalk, and roadway/drainage work. Property owners are responsible for material
costs of any construction projects. County staff will perform construction work as
approved by the Board of County Commissioners.
• If recalculated project costs, using information derived from final engineering
data, would represent an increase of 20% or more, an additional petition
process will be required and an additional public hearing held. Notice of this
public hearing will be published; in addition, notification will be mailed by U.S
Postal first-class mail to all property owners.
Final Public Hearing
After construction is complete, all costs relating to the project will be compiled by Public
Works. Public Works will request to schedule a Final Public Hearing to adopt the final
assessment through a resolution or amending ordinance. The Public Hearing will be
advertised and notification mailed by U.S Postal first-class mail to all property owners
listed on the tax roll within the Unit. If adopted, the Resolution or Amending Ordinance,
including Final Assessment Liens, will be recorded in the Okaloosa County public
records. Term of the repayment for construction costs may be determined as follows:
Individual Assessment Amount Term
$3,000 and up 10 years
$2,500 to $2,999 8 years
$2,000 to $2,499 6 years
$1,500 to $1,999 4 years
$1,000 to $1,499 3 years
$ 500 to $ 999 2 years
$ -0- to $ 499 1 year
Final determination as to the terms of repayment will be made by the Board of County
Commissioners in conjunction with Public Works and the Okaloosa County Clerk of
Courts. Annual Assessments are collected either through the Tax Collector of Okaloosa
County, through their inclusion on the billing of either municipal or Okaloosa County
Water and Sewer utility billing or such other methods as approved by the Board of
County Commissioners.
15
DETAILED PROCEDURES, STREET LIGHTING UNITS
16
STREET LIGHTING UNITS
DETAILED PROCEDURES
Initial Request for MSBU Procedures
Upon request of the procedures to establish an MSBU, Public Works will forward a copy
of the “Guidelines and Procedures” booklet to the requestor. The request should be
made to:
Okaloosa County Public Works
1759 South Ferdon Blvd
Crestview, FL 32536
(850) 689-5772
The request must identify:
• the area affected (e.g., community, subdivision or street)
• the type of improvement involved (i.e., street lighting)
• the type of Unit contemplated (i.e., street lighting)
Application for Unit
Application can be made by interested property owners for establishment of a new
street lighting Unit or changes or additions to an existing one.
In order to proceed with establishing a new Unit interested homeowners or property
owners must submit the following as the official request for consideration:
• $100.00 application fee (per street lighting Unit) made payable to the Board of
County Commissioners, Okaloosa County.
• Contact individual and proposed liaison names, addresses and phone numbers.
• A copy of the cost estimate for streetlight improvements as prepared by the
appropriate power provider.
• Copy of a map with:
o Proposed boundaries for the Unit outlined.
17
o Boundaries must be continuous and not split parcels or lots. Enclaves are
not allowed if the reason is to remove a lot or lots because the property
owner is not in favor of establishment of the Unit.
o Tracts for drainage, buffer zones, etc. are usually included in the Unitbut
not assessed for street lighting.
o The Unit to be assessed does not necessarily include an entire
subdivision if the entire subdivision does not materially benefit from the
proposed action.
o Units must contain a minimum of two distinct taxable (or platted) pieces of
property.
Petition Submission
The Board of County Commissioners has determined that a petition may serve as an
indicator of the amount of community interest for a proposed project. The petition
process is not a requirement of Florida Law.
Public Works will prepare a petition for distribution by the Unit Liaison. Only petitions
prepared by Public Works will be accepted.
The petition will reflect the various charges included in calculating the assessments.
The street lighting assessment will include: all costs associated with installation of the
streetlights, as determined by the appropriate power provider, 5% administrative fees
for collection of the assessments, and a reserve which totals 120% of the proposed
yearly expenditures.
Petition Acceptance
The petition, to be accepted, must be signed by at least 51% of the current property
owners (number of owners) representing at least 51% of property (number of lots or
number of front feet, measured consistent with the method of assessment) within the
Unit boundaries.
• A property owner is the individual or group of individuals that own a parcel of
land.
• In determining eligible signatures of owners, all of the non-related current owners
of a parcel or the designated trustee must sign the petition for the ownership and
parcel to count towards the 51% requirements.
18
• Once submitted, names may not be withdrawn from the petition.
Upon return, Public Works will review the petition for acceptability, consulting other
departments as appropriate.
If the petition is acceptable, Public Works will request that the Board of County
Commissioners schedule a public hearing for consideration of the ordinance to