IA Document G701/CMa™ — 1992 Change Order - Construction Manager-Adviser Edition PROJECT (Name and address): CHANGE ORDER NUMBER: 001 OWNER: E Okaloosa Cty Courthouse addition and INITIATION DATE: 03/05/15 CONSTRUCTION MANAGER: X renovation ARCHITECT: X Crestview Fl. CONTRACTOR: [] TO CONTRACTOR (Nanie and address): PROJECT NUMBERS: 201423 / FIELD: [] Ajax Building Corporation (C14-2177-FM) OTHER: [J 1080 Commerce Blvd. CONTRACT DATE: 5/6/14 Midway. Florida 32343 CONTRACT FOR: Construction Management THE CONTRACT IS CHANGED AS FOLLOWS: Perform additional Pre-Construction Design and Administrative Services as further described in Exhibits B and C attached hereto. The original Contract Sum was $ 1,296,000.00 Net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 1,296,000.00 ‘The Contract Sum will be increased by this Change Order in the amount of $ 1,170,340.00 The new Contract Sum including this Change Order will be $ 2.466,340.00 The Contract Time will be increased by two hundred fifty five (255) days. The date of Substantial Completion as of the date of this Change Order thercfore is January 15, 2016. NOTE: This summary does not reflect changes in the Contract Sum. Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive.. NOT VALID UNTIL SIGNED BY THE OWNER, CONSTRUCTION MANAGER, ARCHITECT AND CONTRACTOR. Ajax Building Corporation Inc. Sam Marshall Architects CONSTRUCTION MANAGER (/irm nante) ARCHITECT (Firm name) 1080 Commerce Blvd., Midway, Fl. 32343 325 S. Palafox Street, Pensacola, FI. 32502 ADDRESS 0 % ADDEZS A Q { Z / 1 BY (Signat e) { / BY (Signature) | John B. Stiith (Yice Pfesident) David Alsop (Typed nanit) \_/ DATE: March 23, 2015 (Typed nanie) DATE: 8. 24+ |5 Ajax Building Corporation Inc. Okaloosa County Board of County Commissioners CONTRACTOR (Firm name) OWNER (Firm name) 1080 Commerce Blvd., Midway, Fl. 32343 302 N. Wilson St. Suite 302, Crestview. Fl. 32536 ADDRESS ADDRESS BY (Sigjq ((e) BY (Signature) John BiSn\ith (Vice President) (Typed name)./ DATE: March 23, 2015 (S’ 'y;ed name) DATE: @Mw\ 5[%[3‘@1&‘ AIA Document G701/CMa™ - 1992. Copyright © 1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA" Document, or any portion of it, may 1 result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11:07:17 on 03/23/2015 under Order No.1746294588_1 which expires on 06/29/2015, and is not for resale. User Notes: (1951757651) CHANGE ORDER FORM Date: 3/5/15 Contract No.: _C14-2177-FM Change Order No.: 01 Owner: ___OKALOOSA COUNTY BOARD OF COUNTY COMMISSIONERS Contractor: Ajax Building Corporation Inc. Original Contract Price: $1,296,000.00 Néet change by previously authorized Change Orders: $ 0.00 Prtesent Contract Price: $ 1,296,000.00 This Change Order will (add/deduct): ' $ 1,170,340.00 New Contract Price: $ 2,466,340.00 O,riginol Contract Time: %45 Original Substantial Completion Date: Mgy, 5, 2015 Net change by previously authorized Change Orders: none Th;is Change Order will (add/deevet) 285 New Contract Time: 620 New Substantial Completion Date: January 15, 2016 APPROVALS B. Sphith (Vice President) PROJECT ENGINEER: 5 DATE: - DATE: March 23, 2015 CONTRACTOR: / “Shith (Vice President) OWNER: ____ DATE; This Change Order is an amendment to the Confract/Agreement between Contractor and the Owner, and all other contract provisions shall remain in full force and effect unless specifically amended in writing, signed by both parties. ) Exhibit "B" February 5, 2015 Okaloosa County Courthouse Crestview, Florida Design Build Scope change The original scope was for a construction budget of $8,000,000 based on a solution that did not meet projected needs as determined through programming efforts and schematic design based on data collected and input from the courts personnel, users groups, and county staff. The new scope is one that meets the needs for a 10 to 20 year projection, and likely suitable for 25 to 30 years. The new scope includes the addition of approximately 36,000 square feet in a 3 story building for the courts, judges and the holding areas, and the relocation and expansion of security for a south side entrance. Also included in the new scope is the renovation of approximately 42,000 square feet in the existing 3 story building to accommodate the complete court support functions required. The new scope indicates construction budgets of $12,000,000 for new construction and $5,000,000 for renovation/remodeling. The design fees and preconstruction services completed to date are credited to the project. The increased design fees and the preconstruction costs are adjusted to meet the new scope as accepted by the county. See EXHIBIT C as revised for fees breakdown. EXHIBIT C Fee Basis Construction Budget = $17,000,000 Phase | - Preconstruction (Pre-GMIP) Basic AE Design Fee (based on DMS sliding scale, Complexity C 7.23%) 76% S 934,298 Schematic Design (15%) S 184,400.97 less previously completed & paid $ (92,400) Design Development (18%) S 221,281.16 Construction Documents (40%) S 491,735.92 Bidding/Negotiations (3%) S 36,880.19 Additional Design Services: $ 217,000 Civil Survey of existing facility/campus $ 8,000.00 (+/-) Civil Design Services TBD Programming Services for Court Facility S 33,000.00 less previously completed & paid $ (33,000) Conceptual Design S 30,000.00 less previously completed & paid S (30,000) Security Planning S 15,000.00 Interior Design S 24,000.00 Landscape Design S 22,000.00 Measured Drawings of existing building S 18,000.00 less previously completed & paid $ (18,000) Facility Analysis $ - incl. in Programming Voice, Data, Telecom S 29,000.00 AV Design S 38,000.00 Construction Management Services Pre-Con Phase (1%) $ 170,000 less previously completed & paid S (20,000) ITotaI Preconstruction Phase Fees and Services (less previously completed and paid): S 1,127,898 | Phase Il - Construction (Post-GMP) Basic AE Design Fee (based on DMS sliding scale, Complexity C $ 295,042 7.23%) Construction Administration (24%) |Construction Management Services Construction Phase Fee(5%) $ 850,000 | [Total Construction Phase Fees and Services: $ 1,145,042 | Total Fees Phases 1 and 2 (less previously completed and paid) ) 2,272,940 Less Original Fees (previously approved and unpaid): S (1,102,600) Total this Change Order: S 1,170,340 Ajax Building Corporation 3/9/2015

Download this text file with its original spacing ↓