READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 10-12-2006 (regular) — reading text
Part 37 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-13239-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
I'
the Historic Downtown District
I
and City' s Waterfront chain of I
parks. I
I
j
Waterfront Park Concept Plan i
GENESIS GROUP
11'. 0... "".' 0.. ' 0 ..'..... f"
www. Genes; sGroup. com
Capitol Cascade T."\.
1i1 Moster Plan
Tallahassee, FL
The Capital Cascade Trail Mas- Client
and BluePrint 2000 & Beyond
ter Plan is a stormwater
greenways plan for a 5. 2 mile Intergovernmental Agency
corridor through Tallahassee, with the City of Tallahassee
Florida. The project entails and Leon County)
planning for trails, parks and
greenway amenities in combi-
location
nation with a stormwater retro-
Tallahassee, Florida
fit master plan project.
The project includes the St. Size
5. 2 Mile Corridor
Augustine Branch and the Cen-
tral Drainage Ditch with a total
contributing drainage area of Service
approximately 5, 146 acres. Public & Civic Infrastructure
The project involved perform-
ing a SWMM model of the Highlights
basin and Amenity Design
contributing using
the model to analyze the effec-
Engineering Design &
tiveness of proposed improve- Permitting
ments. Proposed stormwater
improvements include: Landscape Design
Box culverts
Park Amenities
Stilling pools
Wet detention facilities Park Master Planning
Off-line treatment ponds
Stream morphology Parks and Recreation
enhancements Planning
Trash collection devices Parks Design
Conveyance econstruction
and enhancement Passive Recreation Design
Construction of wetland
Stormwater Analysis &
habitat.
Solutions Design
Stormwater Master
Planning
I
I
Surveying
The proposed improvements will:
provide much needed flooding relief, Walkable Community
water quality enhancements, channel
Water & Wastewater
stabilization, greenways and trails,
Engineering
and passive recreational facilities.
In addition, the highlight of the project'
isCapital Cascade Park which will
provide opportunities for community
cultural facilities.
I. ~ .~ ~.<? l:I.~ GenesisGroup. com
MN.~ ~. www.
Blair Stone Parkwa)
Tallahassee, FL
Client
City of Tallahassee
Location
Tallahassee, Florida
Size
2. 2 Mile Corridor
Service
Transportation & Mobility
ig~ fig~ts f:.~..
c:~~pre~()~~ot ~e~ign
et:~:~:~:::." - "':. . - . '.
Sur.;
This is a 2. 2 mile, 4 lane, divided ur- The project included a significant Y".:i ~"_ .'..,: ;.)~~:~ :..:~ ,"}::~:..:' t~:; .
ban Ro~dway:arid: Drainag'e
roadway project with curb and amount of public involvement, includ-
f~~~~
gutter, sidewalk, bike lanes, retaining
walls and signalization at three major
ing:
Public workshops;
TY:" lt:"~':
Langscape Design:
intersections. Stormwater treatment Property owner meetings; if~:!~~~.:);:': ;::~: :': .~-.~:':. .
i.' -:;;".
included conveyance in a closed sys- Numerous meetings with individ- lighting Design
tem, approximately 800 feet of a dou- ual property owners; and
ble 5' x 7' box culvert which encloses Coordination with City and Coun- Signaliz~tion
a portion of the City's Northeast drain- ty officials.
age ditch, and construction of four Genesis prepared an interactive UtilitY
R~ i~ cation
Coordination
Stormwater Management Facilities. three-dimensional model of a portion
of the project for use at public meet-
City/ County Permit
In addition to the roadway, a 1000 ings. The computer generated model Coordination
foot low-level bridge was constructed allowed residents and business own-
to span a wetland area.
Screening ers to view the completed project for
walls and landscape buffers were in- various locations along the corridor.
cluded with the project to enhance
the aesthetic quality of the roadway
corridor. Bicycle/ pedestrian facili-
ties werealso included and will in-
corporate the City' s Goose Pond
Bike Trail for access to local parks.
3D Rendering of Blair Stone Parkway
N.~~,~~ ,~~.
9,Y,~ www. G~ nesisGroup. com
Traffic Calming Pro~ ram
Tallahassee, FL
Client
City of Tallahassee
Chicane
w, .-
LEGENI>
Location
Tallahassee, Florida
f"' ca.iIIc~""'"
r.., 01IIII
c:.-.. ~
