READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 10-12-2006 (regular) — reading text
Part 36 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-13239-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Landscape Architectural
Conference Center, re-design of Marler park, re-alignment of an existing par
3 golf course, refurbishment of the existing miniature golf course, and site for
Construction
afuture War Memorial. The Master Plan was development through a 3- step
Documentation
public workshop/ charrette process.
m Cost Estimating
In June of 2006, the Master Plan was updated. The FlOl1.
J
updated plan illustrates a re-development scenario Contract and Bid
D
which displaces the existing par 3 golf course with
a propoased marina center, 250 room hotel, parking
EM~ Document Preparation
garage for 800 cars and relocation of the Gulfarium
to this property, from its current location on the south
toAST I Construction
Dm1I.~ Administration and
side of U. S. 98.
Observation
Upon approval of the Master Plan, Genesis prepared construction
documententation for the 13 acre Marler Park Site. Marler Park has been
designed as an extension of the Conference Center, with areas for active and
passive recreation, and a boat launch facility. The design includeq a grand
lawn, central restroom facility, new picnic shelters, environmental interpretive
area, tot lot, public beach, fishing pier, stormwater retention, and three boat
launch ramps.
MN.~~. ~ ~ .~ ~.<?,~.~ www. GenesisGroup. com
Baymeadows Cen't~ r
Jacksonville, FL
Client
Ms. Valerie Evans, Executive
Director
Better Baymeadows, Inc.
location
Baymeadows, Jacksonville,
Florida
Size
85 acres.
Services
Community Design and
Regional Planning
Genesis Group was hired by Better Baymeadows Inc. to create a master
plan Project Highlights
for Baymeadows Center using a public charrette process. The site is divided Master Planning
by a half mile stretch of Baymeadows Road which is a major arteria! roadway
within the Baymeadows community. The site Public Charrette
currently exists of numerous
different parcels of commercial, and office developments. Presentation
Genesis prepared site inventory and analysis drawings, and four separate
concepts prior to the Charrette. The four concepts included were the
following:
Retrofit Plan
Renovation Plan
Redevelopment Plan - Suburban InfiIJ
Redevelopment Plan - Urban Infill
Genesis analyzed all of the
public opinions to create the final
master plan for Baymeadows
Road. The main concept
incorporates pedestrian and
vehicular connectivity internally,
and to the surrounding Bayberry
Road and Baymeadows Way.
Moderate infill developments
and the closure of some access
points also key to the
were
design. Baymeadows Road will
be maintained as a major arterial
road and there will be no left turns
from Baymeadows Road into the
surrounding developments.
MN.~~.~~ .~ ~, C?,~,~ www. GenesisGroup. com
Bainbridge Downtown and Waterfront kevitalization
Bainbridge, GA
L~
t~ Client
City of Bainbridge, GA
I i. location
0::
0,;- , ,'-
t~- Bainbridge! GA
4"',
l, /
t:;-~>\
L' '""~ ~ ,
c~
f.' '-
l;.. . ':;;'.... Size
Y' -.
711t-, ~, ~';.
ri.
- 135 Acres
i,
c,)~_" I' '
d"" -: i/ '
JI, ,,; . ,... '..:, '....!
G~" ; I}'. " . A' A,; Service
it 1( Community Design and
Regional Planning
Genesis Group ; s currently working with the City of Bainbridge, Georgia
to complete the survey, design and construction inspection services Highlights
for the City' s Downtown Sidewalk Revitalization Program. The project Community Planning
consists of approximately 1. 5 miles of downtown sidewalk replacement
Design Charrette
and streetscape enhancements in this vibrant South Georgia city. The
new
design will include improvements to the detail and flexibility of the Landscape Design
pedestrian spaces while meshing with the previously completed work. Parks and Recreation
Planning
Streetscape Design
i
I
Surveying
Genesis will assist the
Bainbridge in the
City of
visioning iI
I WalkabJe Community
process and complete a Master I
Plan for the Flint River waterfront
that extends from the City' s
I
I
Boat Basin Park on the South
i
to the Cheney Griffin Park on
Proposed Swimming Complex
I
the north ( south shoreline of!
the Flint River). In addition the "
project includes a review of the f
connectivity issues associated
with way the
finding and
pedestrian connection between :
