READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 10-12-2006 (regular) — reading text
Part 33 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-13239-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
stressed concrete NJ' 31"626~;:;::
tion role during the construction phase of the girder bridge carrying McNab Road over the i~~~fif~~::
1f;t~~~:;
f;':
j: ~ '-~'" ~ - ;~
project. CSX Railroad and several other local roads in PrOtessfonafAsSodations
Matanzas Inlet Bridge Broward County, Aorida. The bridge has an Atnerlbm:Socie' of HighwaX
St. Johns County, FL
Project Manager and Senior Structural Engi-
overall length of 631 feet with an out- to-out
width of 105 feet.
i,~.'
i~,:': r~::' . _: _.
neer on the State Road A1 A
Bridge Replace- Acosta Bridge National SOciety of Profes-
ment over Matanzas Inlet, featuring a total JacksonviUe, FL sional Eh8ineers
deck width of 59 feet and an overall length Senior Structural Engineer for design of the i;: _ .
i.~~
of 2, 117 feet. Responsible for preparation of structural steel alternative for approach spans Florida Engineering Society
the Bridge Development Report, preliminary to the main structure. Specific responsi-
and final bridge design, and the development bilities included steel plate and box girder
of complete construction plans and specifica- desisns and checking, bearing designs, plans
tions for the replacement bridge. preparation and review. This approach span
interchange project featured the design of 17
Roadway and Structure Design continuous bridge superstructure units making
Florida' s Turnpike Wldenl", up a total of 84 spans.
Boca Raton Interchange to Atlantic Blvd. John Rltey Paul Bridle
Boca Raton, FL Pittman, FL
Prindpal Engineer for this project which Project Manager for this bridge replace-
involved the desisn of 5. 3 miles of Turnpike ment project involving the design of a new
widening from < 4 to 6 lanes including re- design bridge to carry State Road 2 over the Choc-
of the Boca Raton tawhatchee River. The project included a
Interchange, a 35 year old
interchange, to current design standards. A hydraulic study of the river and development
new bridge was
designed at the interchange of a Bridge Hydraulics Report using state-of-
to span the widened Turnpike. The the-art 2- dimensional FESSWM analysis. The
project
also called for a new bridge design at Clint Bridge Development Report concluded that
Moore Road, which required a special de- the new bridge consisted of 21 spans at ap-
signed temporary bridge, and widening of two proximately 129 feet each for a total length
2507 Callaway Road, Suite 100
additional structures to carry the extended of over 2, 700 feet. Drilled shafts used far the
TaUahassee, FL 32303
Turnpike roadway. foundation of the replacement structure.
850. 224. 4400 Fax: 850. 681. 3600
cisnYcler@GeiieSisGroup. com
fMN.~~,! ~ T~ '. t,9,l! T~ www. GenesisGroup. com
Echo K. Gates, F-..:.
Project Engineer
Ms. Gates has over six ( 6) years of Civil Engineering experience in Florida managing
coastal engineering projects. Her areas of expertise lie in remotely sensed data col-
lection, analysis, and distribution through GIS and the Internet During her tenure at
the Florida Department of Environmental Protection she was responsible for permit-
ting the geotechnical design of beach fills. She has extensive experience with permit-
ting and management of inter-governmental projects involving federal, state and lo-
cal agencies. In addition, she has 19 years of construction management experience.
Land Development & Expert Witness
Entitlements Escambia County, Fl
Site Stormwater Design/ Permitting Creighton Road
Gulf Beach Highway
Project involvement typically begins at Duties ft Responsfbflfties
the master planning stage and continues Project Engineer
Gadsden County, Fl
through design, permitting and construction.
SR 267
Education
Coastal Projects Hillsborough County, Fl M. S. .~ Civil Engineering,
4 ft 50th Street
Evergreens at Mahan Apartments Florida State University, FL,
Glen Oaks Apartments Utilities Martin Luther King Boulevard
1999
Goldfield Subdivision
Lookout Pointe Apartments Leon County, Fl
B. S. - Civil Engineering,
Medical Commons Subdivision Capital Circle Florida State University, FL,
Summerset Village Apartments Orange Avenue 1997., ....~ -
Vineyard Apartments Raymond Diehl Road
South Monroe Street
Thomasville Road
Beach Restoration and Nourishment Regfstration
Pinellas County, Fl Professional Engineer:
Projects FL 58615:
SR 686
Bay West Park of Commerce
Church of Jesus Christ of Latter- Day Saints
Conservation Centre Polk County, Fl
Comers of San Marcos/ Wilson Property Boardwalk ft Baseball ( 1- 4 ft USZ7) Design Programs
First South Mortgage Polk County Parkway AutoCAD Land Development
lot 19 Commonwealth Office Park Desktop
Shell Oil Service Station Seminole County, Fl ArcG/ S
Sunshine State Credit Union Seminole Expressway ICPR
Hydraflow
EPA SIVMM
Remote Sensing Projects Construction Management
Adams Street Reconstruction Barnett vs. FOOT ( access)
Kedan VS. FOOT ( access) Publications
Magnolia Heights
Stormwater Retrofit Ray vs. FOOT ( access) Storm~Damased Florida
Southeast Sector Planning Study S. W. Anderson VS. FOOT ( access) Coastal Foundations: Repair
University of South Florida . St. Petersburg Stapleton vs. FOOT ( access) or Rebuild?
Campus Stonnwater Master Plan Toney vs. FOOT ( access) JoUrnal of Perfonnance of
Northeast Drainage Ditch at Lonnbladh Road ChineUI vs. FOOT ( flooding) Constructed Fadlfties
Gerad vs. FOOT ( flooding)
February 2001
Glen Abbey vs. FDOT ( flooding)
Environmental Restoration Macomber vs. FOOT ( flooding)
This work has included everything from the Modem vs. FOOT ( flooding)
Professional Assodations
initial site impact analysis through the order Sussman vs. FOOT ( flooding)
American Society of Civil
of taking hearing, mediation and trial.
Engineers
2507 Callaway Road, Suite 100
Tallahassee, FL 32303
850. 224. 4400 Fax: 850. 681. 3600
egates@GenesisGroup. com
MN.~~, ~ ~ T~ ~''? L~'~
www. GenesisGroup. com
Mark C. Klone
Graduate Landscape Architect
Mr. Klonejoined Genesis in July 2002 after serving as a Graduate Teaching Assistant at Kansas State
University for two years. His responsibilities include community master planning. detail design.
construction documentation. and site layout and design. His thesis. " New Urbanism: Dream or
Reality." is an in- depth study of the physical relationships found in New Urban communities.
Representative Experience Conceptual design and DRC submittal of 135
units on 18 acres. Site also includes a 2 acre
Planning Projects
AvMed I Santa Fe Health Park neighborhood center.
Alachua County. Florida
Detail Design
Conceptual design development for the Master
Plan of a new hospital in Gainesville. Florida. Beach Access Dune Crossovers
Uses include a 350 bed hospital. 125, 000 sf of Walton County. Florida
medical offices. 120 room hotel. and 180, 000 Chimney Lakes - Wachovia Bank Streetscape
sf of retail and office space. Jacksonville. Florida
