READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 11-12-08 special agenda - DRC cure — reading text
Part 8 of 10. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-16976-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Future
Land Use Map designation for the property ( MUMS).
2) The proposed structure is in conformance with the height, setback, and lot coverage
requirements stipulated by the MUMS zoning regulations conditioned upon approval
from FDOT of use of the right of way along Perry Avenue. and the site plan
demonstrates that the development will provide the required parking spaces based
upon the Memorandum of Agreement.
3) The architectural style and materials for the building are consistent with the intent of
the Urban Master Plan Architectural Guidelines and CRA Plan Update.
4) The Community Development Services Department has reviewed the site plan
12.45. 05, Volume IV, Land
application under the criteria found in Section
Development Code, and finds the foUowing:
a. The proposed site plan is consistent with the Fort Walton Beach
Community Redevelopment Plan in that it ensures vacant developable
land an~ redeve10pable rehabilitation sites are best utilized to meet the
needs and values of the city and specific neighborhoods.
b. The proposed site plan is' in conformity with all applicable regulations of
the MUMS zoning district, including but not limited to:
i. Adequate public facilities and services are available to seNe the
proposed development.
ii. The setbacks and height of the proposed building meets Land
Development Code requirements subject to the approval of a
Development Agreement.
m. Adequate off-street parking spaces are provided based on the
Memorandum of Agreement.
iv. Adequate landscape areas and buffers are provided subject to
approval of a Development Agreement.
v. Provision is made for stormwater management.
c. The proposed site plan is consistent with good design standards with respect to
all exter~al relationships, including, but not limited to:
1) The relationship to adjoining properties.
2) Internal circulation, both vehicular and pedestrian, and its relationship with the
city's street system or proposed waterfront promenade.
3) The design of access and egress, indicating relationship with and impact on
adjoining streets.
4) The disposition and use of open space, provision for screening and buffering
adjoining properties, landscaping, disposition of storm waters, screening of
service areas and preservation of significant natural features, including large
trees.
5) The size and bulk of structures in relation to their surroundings.
6) Building arrangement between buildings in the proposed development and
between buildings on adjoini~g sites.
7) Shading of adjoining properties by high- rise buildings.
8) Sufficiency of ownership, guarantees for completion of 811 required
improvements and, if private, guarantees for continued maintenance.
ORDER
The CRA site plan application is approved based upon the application submitted and
the site plan and architectural drawings developed by DAG Architects Inc. dated 4/ 13/07
and 06/25/ 07 and Engineering Division Memorandums ( dated April 30 and May 15,
2007 from John Geurin), Utilities Memorandums (dated May 24, 2007 from Michael
Beedie) and Building Division Memorandum ( dated April 20, 2007 from Linda
Development CRA Site Plan Approval Page 20' 4 # 6- 16-SP
CRA Case 0
Order..
Carnley) distributed at the May 24, 2007 DRC meeting, which are a1l incorporated by
reference and made conditions of this development order along with the following
conditions:
a. Approval of a Development Agreement addressing the items in the Memorandum
of Agreement, FOOT approval to use the right Qfway along Perry, off-site
reforestation requirements, and use of city property to meet parking requirement.
b. Copies of all necessary permits (Stormwater management) from the FDEP shan
be submitted to the Environmental Specialist and City
Engineer.
c. A copy of the Stormwater management Plan shall be submitted to the
Environmental Specialist for review.
d. The property owner is advised of the potential for unexpected discoveri~ s. If
ground disturbing activities take ptace and unexpected discoveries, such as
Native American graves or lot historic cemeteries are encountered. guidelines set
forth in chElpter 872, F .S. ( Florida' s Unmarked Burial Law) rnust be followed. In
the event unexpected discoveries are made the property owner will notify Florida
Sate Historic Preservation Officer (SHPO) within 24 hours to begin procedures
outlined in Chapter 872, F.S"
e. The DRC comments found in the attached memorandums from Linda Carnley
dated April 20, 2007; John Geurin dated April 30, 2007 and May 15, 2007; and
Michael Beedie dated May 24. 2007. '
This ORDER was adopted upon a recording of electronic votes with a vote of _
ayes
to nays to APPROVE WITH CONDITIONS THE CRA SITE PLAN
APPLICATION TO FT. WALTON DEVELOPMENT PARTNERS LLC ON A PARCEL
LOCATED AT 223 Miracle Strip Parkway SE and 208 Perry Avenue SE, Fort
Walton Beach, Florida, and Identified as Okaloosa County PercellD # #24- 2S- 24-
0300-000A., Q070, 24- 24-G300- 000A- 006B, 24-2S- 24-G300- o00A- G01 A and 24- 2S-
2S..
24-0300- o00A.. o01 B.
Development Order. CRA Site Plan Appmval Page 30f4 CRA Csse # 06--
16- SP
Ordered this 10-day of August, 2007, in Fort Walton Beach, Florida.
August 10, 2007
Date of Issuance Mike Anderson, Mayor
of
City Fort Walton Beach, Florida
This Order was prepared by: Approved as to form and Jegal sufficiency:
Missy McKim, COS Director Toni L. Craig, Florida Bar No. 115444
City of Fort Walton Beach City Attorney, City of Fort Walton Beach
PO Box 4009 244 Racetrack Rd NE
Fort Walton Beach, FL 32549 . Fort Walton Beach FL 32547
ATTEST:
CITY CLERK
Development Order - CRA Site Plan Approval Page4of4 CRA Case 0
#6- 16-SP
4i".
C\ TY.OF FORT WALTON BEACH INSPECTION REVIEW
Date: April 20, 2007
To~ . . DRC Members
From: Linda earn ley, CBO~ 833-9599
RE: ' Landmark Center . .
Is....... ? w............................. ..
W!I!S
I.~ -.-.. -. -.-
1)';'A co'm plete' set of :plans shall be reviewed by ICC. One set wit, be sent
After
firs; t~, r::-., review you Will be required ~o send them two
th:eit .it al
. . .... In."
complete s.ets of stamped/ sealed plans - they will' stamp both and
retu.rn ~ o.~h.:where one"~etwOI b~ given to' the contractor al1'd Qne kept
iv~~we~ks. '.' .
by.tl1~ .\~spectio~ office. Ice review wll( take . ap,r, ox!'.
tt~:'I~" n '~he Wl-~d a~ rn.e D~ brls region. All
thi~~:~ coisth.ictlon docuni'~nt~ . 1:- ".
sh.a,n r~ fl.ect applicable r,equirement~ by the FBC
1..... .:;.. c k. : ". .....? .. ..
3) You win.need to provide Ice all calcul~tlons, geotechnical reports,
fi)n~. rgy.forms an.d civlls
4) Prbv1de..five clvils for review by various departments'
5) Provld'e two extra sets qf cQmpleted plans for review by fire Dept and
lnsp.~c!jon.. .'.
h.ow ~ite ' a<? of FBC
c.~ sl~ 1Hty.' n accor~ anc~ wl~h S~ ction ~ 1.,
7) " nclude"a completed TItle Page
8) Include Flood Zone
9) ProvIde threshotd ',",spector name and certifications. N'ote on plans that
irispection reports shan also be forwarded to th~ Inspection Dept of City
a"' .
10) No~e on plans.that as bunt surVeys wIU be required after slab
lnspecttons
11) St' p~' ata termite treatments
q' ~~,.. .~.
A. street address shall be provided at final inspection
t2) permanent
13) AU stgnage shan be permitted separately
14) Show back flow preventor and note on piansthat.
AI Jordan of our Water
Ops Dept ( at 833-9630) shaH be can~ d for a final Inspection -of the
backflQw
15) Include aU req~\ red transitIon strips at egress / ingress points to ~ite
16) Submit an product approvals' :.
1.#
1. r..... . .. .
t.... .. f ._:- ' .' _ .._....~..:..
CITY OF FORT WALTON BEACH, FLORIDA
MEMORANDUM
DATE: May 15, 2007
TO: Christy Johnson, CRA Planner
FROM: J onn B. Geurin, Engineering Division
SUBJECT: THE LANDMARK CENTER
MIRACLE STRIP PARKWAY AN'D PERRY AVE.
I have reviewed the preliminary site information for the Public Works
Department of
the above referenced development which was re- submitted for the DRC to be held
May
24, 2007. The Engineering Division offers the
following comments in order to reach plan
1
approv~ by the PUb,lie Works Department: .
1. An issues identified on my review memo dated April 30," 2007 are still
outstanding
and will have to be resolved in order to gain approval
