READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — August 4, 2014 — 5-2 Parks — reading text

Part 2 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 18-5-2 Parks.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

FY15 Full-time* 0 0 0 0 Part-Time 0 0 0 0 Relief 0 0 0 0 Total 0 0 0 0 ∗No personal services are included in this fund. Staffing needs are provided by County and Unincorporated County Parks. MAJOR ACCOMPLISHMENTS LAST YEAR:  Prepared Project Agreement with the Town of Cinco Bayou for Seaway Boat Ramp access repairs.  Funded a portion of the new boat trailer parking at Marler Park. PROGRAM GOAL: To provide construction, maintenance and customer services at County Boat Ramps. KEY OBJECTIVES: 1. Provide structurally sound and safe facilities for all County boat ramps. 2. Provide clean, accessible restroom facilities where practicable. 3. Provide ADA compliant accessibility to parks. 4. Maintain boat ramp park grounds with regularly scheduled mowing and trash removal. 5. Provide timely and courteous assistance to citizens. 6. Provide construction services at greatly reduced cost compared to contracting design and build services. 7. Maintain boat ramps with regularly sand removal. 8. Maintain all docks and piers by regular inspections, replace or repair loose or rotten boards PERFORMANCE MEASURES: Actual Estimated Adopted Performance Measures FY12/13 FY13/14 FY14/15 Number of Full-Time Equivalents (FTEs) 0 0 0 Input Operating Expenditures $196,880 $ $ New Construction (grants and local match) 0 0 0 Boat Ramps Maintained (facility repairs, boat ramps dredged) 15 15 15 Output Boat Ramps Improved (construction, renovation) 1 0 0 Derelict Vessels removed (FWC authorized) 10 3 0 Resources personnel trained on equipment to dredge boat ramp 5 5 4 Efficiency Average response time to boat ramp dredge request (days) 5 5 5 Effectiveness Project Agreements with municipalities 3 2 1 Boating Restricted Zone (sign repair/install) 0 87 0

Download this text file with its original spacing ↓