18 Month Inspection Report Mossy Oak Plantation Phase 1 from the Okaloosa County BOCC meeting of October 2, 2012 (IQM2 meeting #1098). Original portal label: 18 Month Inspection Report Mossy Oak Plantation Phase 1. Preserved as a historical public record; part of the meeting linked as a related source.
- Original publication
- 18 Month Inspection Report Mossy Oak Plantation Phase 1
- Date
- October 2, 2012
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
View reference catalogue / source ↗
Download this source
18 Month Inspection Report Mossy Oak Plantation Phase 1 (PDF)
Original PDF as published on the Okaloosa County IQM2 meeting portal.
PDF · 0.0 MB
Download ↓Machine-extracted text — 54-18 Month Inspection Report Mossy Oak Plantation Phase 1.pdf
Text extracted on 2026-10-29 from 54-18 Month Inspection Report Mossy Oak Plantation Phase 1.pdf using the PDF text layer (pdftotext). Not human-corrected; may contain recognition errors. Read alongside the source images.
File · 0.0 MB
Download ↓
Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
INSPECTION REPORT
TO: Edwin S. Sanguyo, P.E.
Public Works/Engineering
FROM: Jerome Gibson
Public Works/Engineering
DATE: July 12, 2012
SUBJECT: Mossy Oak Subdivision Phase I
Warranty Inspection – 18 month period
The above project was inspected for compliance with approved plans and for
performance/wear during the 18 month warranty period.
DATE OF INSPECTION: July 12, 2012
INSPECTORS: Jerome Gibson/ P I, Tim Stanley/NRDMS, Rob
Vandenbroeck /RDOM, Clay Simmons, PE/RDM, Edwin Sanguyo PE/ED.
The following deficiencies were noted:
1. Please provide plans for the repair work to be performed along Kais. The asphalt
surface exhibits excessive wear, there are indications of base failure and the
curbing on the south/west side of the roadway has rolled away from the cross
slope. This roadway shall be repaired prior to the final acceptance and the
proposed repair method shall be provided for review prior to execution.
2. All rights-of-way, retention basins and easements shall be maintained/mowed
during the warranty period and prior to acceptance into the County’s permanent
maintenance system.
3. It appears the stop bars are not per plans. The approved plans call for the stop bars
to be 24” wide. All stop bars shall be repainted.
4. The concrete on the north side of inlet located on the south side of res # 1546 shall
be removed and replaced to match existing concrete on inlet.
5. All temporary silt fencing shall be removed from retention basins and along the
wood lines prior to final acceptance.
6. Replace the missing stormwater manhole lid located on the north side of retention
basin # 2. Also, replace missing grate on inlet located on the north side of Lena
Street.
7. The lifting holes inside of the inlets shall be filled with concrete.
8. Remove the lumber outside of chain link fence at retention basin # 2.
9. Replace concrete around inlets where cracking.
10. Remove/clip grass from all concrete curbing.
11. Install silt fence around the inlets adjacent to the cleared area on Lena Street and
where sediment is entering the roadway.
12. Remove the persimmon tree from retention basin on Lena Street and clean around
outfall pipe.
13. Remove and replace broken concrete around inlet on north side of Lena Street in
front of resident # 1568.
14. A road name sign (Dottie Street) shall be placed at the entrance (intersection of SR
4 and Dottie Street).The Street sign shall be 8” X 30”.
15. Replace the RPM reflectors on Dottie Street near the intersection of SR 4.
/jg